Loading...
HomeMy WebLinkAboutCompaction Test Dederal Phone:954-784-2941 E-Fax: 954-784-7875 Ongineering admm@� w f6d Ted-eng.com ww. -eng.com ®Qesting, 3370NE5thAvehue .. . . Field-Density Tests of Compacted Soils Method D-6938 Project: Proposed Swimming Pool r Date: February 7, 2022 Address: 7466 Legends Drive, Port Saint Lucie, FL Order#: 22CMT0418 Area Tested: Pool Deck Permit#: SLC 110-0 54 Material Type: Dark Brown Sand with Traces of Rock ch: Company: Pools By Vitali Address: 1544 SE Crowberry.Drive Compaction Req.: 95% Port St. Lucie, FL 34983 Proctor Method- ASTM D-1557 Test Probe Moist Dry Proctor Optimum # TEST LOCATION De th Elev. % Density Value Moisture Compaction Pass p PCF PCF % 1 NE Corner of Pool Deck 12" FL 11.7 101.3 102.5 12.5 98.8% Yes 2 Center of Pool Deck 12" FL 10.5 1 99.2 102.5 12.5 1 96.8% Yes 3 SW Corner of Pool Deck 12" FL , 8.3 102.4 102.5 12.5 99.9% Yes 4 { 5 i 6 7 8 9 10 j 11 12 13 14 Remarks: See Reverse Side(Page 2 of 2)for Additional Information for Disclaimer j This is a Compaction Test only on the top 12"of the pool deck and is not a verification of Soil Bearing Capacity. . I Legend for Elevation: PR=Proofroll 1,2,3= 1st;2nd,3rd Lift Submitted by: ► '/e �---� SL=Springline FL=Final Lift Keith LeBlanc,P.E. SG=Subgrade BG=Below Grade Federal Engineering&Testing', Ific. . BC=Basecourse BOF=Bottom of Footing Florida Reg. No.59394,- - i TOP=Top of Pipe FG=Finished Grade Certificate of Authorization_-#54Ti As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authori�tion for publicgtion p!,statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.A density test determines the degree of comiSiction of the tested layer`"o'f'n3aterial only.A density does not replace a soil bearing capacity determination.These density tests do not certify the,underlying soil materials below to proposed'structure:The results do not preclude or guarantee that future settlement and cracking will not occur.A soil boring test is required to certify that the underlying soils=wil�support tfie•propoosed structure _ without settlement.If no soil borings have been performed to verify the underlying soils,we recommend that soil borings be performed to evaluateShe-suitability of the underlying soil to support the proposed structure.After laying dormant for a period of 90 days or after heavy rain/storms,retesting must be performed on this wbry,, - -,,.f•Imo.� —��— i .�•r ,..r PAGE 1 f f Compacted Soils Method ®-6936 Disclaimer Pursuant to your request, Federal Engineering &Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify underlying subsoil conditions. Our scope of services only included testing the top 12" of the pool bottom pad material. FET was not contracted to perform supervision of the pool pad preparation or excavation to verify if undermining of the building foundation has occurred. This testing of the fill material does not include an analysis of the underlying soil conditions and materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12" of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building and pool foundations. If different specifications are required, Federal Engineering &Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas of the site or other dates. Any subsequent site disturbances due to water erosion, rain, construction activities, excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re-compacted and re- tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved our reports is reserved pending our written approval. It has been a pleasure working with you and look forward to do so in the near future. Page 2 of 2