HomeMy WebLinkAboutLetter (Finished Floor Waiver)s-r.�uciE
Board of County
Commissioners
Chris Dzadovsky
DISTRICT 1
Chair
Sean Mitchell
DISTRICT 2
Vice -Chair
Linda Bartz
DISTRICT 3
Frannie Hutchinson
DISTRICT 4
Cathy Townsend
DISTRICT 5
Administration
Howard Tipton
COUNTY
ADMINISTRATOR
Dan McIntyre
COUNTY ATTORNEY
December 17, 2021
Abraham Chabab Inc.
Attn. Abraham Chabab
1391 NW St. Lucie West Blvd. # 411
Port St. Lucie, FL 34986
RE: Finished ;Floor Waiver
Dear Mr. Chabab,
All) C.)Obr)\
gobs
Please accept this letter in response to your request received December 16, 2021, to waive
the required finished floor elevation of 18" above the crown of the adjacent road. The waiver
request is for two proposed warehouses for Kings Hwy Industrial Park located at 7506 &
7510 Commercial Circle, Fort Pierce
Pursuant to Section 7.04.0l.C.3 of the St Lucie County Land Development Code, the
Planning and Development Services Director has the authority to grant administrative relief,
when topographical conditions are such that compliance with this subsection would be
impracticable nor cause grade level conditions detrimental to adjacent or nearby property,
consistent with the intent of the Flood Protection regulations and any other applicable portion
of this Code.
i
The Planning and Development Services Director has granted your request for administrative
relief of the finished floor elevation based on the following determinations:
1. The property is located within flood zone X.
2. The proposed finished floor elevation is 17.5' based on the SFWMD requirements, 1.02'
NAVD above center line of Commercial Circle.
3. The elevation of the center line of the adjacent road is 16.48' NAVD (highest point).
This approval does not in any way constitute authorization to begin construction. Prior to the
commencement of any construction on this property, an application for specific building
permit must be obtained from this department.
Please feel free to contact me at (772) 462-2822 if you have any questions.
Sincere ,
P1
iesAn,ACP
Planning and Development Services Director
cc: Monica Graziani, Building and Code Compliance Manager
Doug Harvey, Building Official
Melissa Brubaker, Zoning Supervisor
Planning and Development Services Department Building & Code Division Myassara@stlucieco.o
drg
1"23oo Virginia Avenue I Fort Pierce, FL 34982 � (772) 462-2134 12 (772) 462-1553 10 (772) 462-1578 ewww.stlucieco.gov