Loading...
HomeMy WebLinkAboutAPPROVED Structural - 121716_ Henao, FranciscoRE:CERTIFICATION LETTER Project Address: FRANCISCO HENAO RESIDENCE 6506 PENSACOLA RD FORT PIERCE, FL 34951 Design Criteria: - Applicable Codes = 2020 FLBC/FLEBC 7th Edition, 2020 FLRC 7th Edition, 2018 IEBC/IBC, ASCE 7-16 and 2018 NDS - Risk Category = II - Wind Speed = 158 mph, Exposure Category C, Partially/Fully Enclosed Method - Ground Snow Load = 0 psf - Roof 1&2 : 2 x 4 @ 24" OC, Roof DL = 9 psf, Roof LL/SL = 19 psf (Non-PV), Roof LL/SL = 0 psf (PV) To Whom It May Concern, Sincerely, February 12, 2022 Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, the PV module assembly including attachment hardware has been reviewed to be in accordance with the manufacturer’s specifications and to meet and/or exceed the requirements set forth by the referenced codes. A job site survey of the existing framing system of the address indicated above was performed . All structural evaluation is based on the site inspection observations and the design criteria listed above. Existing roof structural framing has been reviewed for additional loading due to installation of PV Solar System on the roof. The structural review applies to the sections of roof that is directly supporting the solar PV system. Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 1/5 Roof 1&2 23°OK IEBC IMPACT CHECK MOUNTING PLANE Roof 1&2 RESULTS SUMMARYBARUN CORP FRANCISCO HENAO RESIDENCE, 6506 PENSACOLA RD, FORT PIERCE, FL 34951 RESULTMOUNTING PLANE ROOF PITCH (deg.)GOVERNING ANALYSIS MOUNTING PLANE STRUCTURAL EVALUATION STANDOFF HARDWARE EVALUATION FOR WIND UPLIFT UPLIFT DCR 95.5% Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 2/5 PV module weight 2.50 psf Hardware assembly weight 0.50 psf Total PV System Dead Load PV-DL =3.00 psf Existing Roofing Material 2 Layer(s)5.00 psf Underlayment 0.50 psf Plywood Sheathing 1.50 psf Framing Weight 0.73 psf Vaulted ceiling No 0.00 psf Miscellaneous 1.50 psf Total Roof Dead Load R-DL =9.23 psf EXPRESSION Roof Live Load Lo 20.00 psf Member Tributary Area At < 200 sf Roof 1&2 Pitch 5/12 or 23° Trubutary Area Reduction R1 1.00 Slope Roof Reduction R2 0.95 Reduced Roof Live Load Lr = Lo (R1) (R2) =19.00 psf Ground Snow Load pg =0.00 Effective Roof Slope 23° Snow Importance Factor Is =1.00 Snow Exposure Factor Ce =1.00 Snow Thermal Factor Ct =1.10 Minimum Flat Roof Snow Load pf-min =0.00 Flat Roof Snow Load pf =0.00 psf Roof Slope Factor Cs-roof =1.00 Sloped Roof Snow Load on Roof ps-roof =0.00 psf Roof Slope Factor Cs-pv =0.78 Sloped Roof Snow Load on PV Panel ps-pv =0.00 psf REDUCED ROOF LIVE LOAD (Lr) VALUE MATERIAL/ROOFING DETAILS VALUEROOF DEAD LOAD (R-DL) 2 x 4 @ 24 in. O.C. VALUE Composite Shingle Roof SNOW LOAD BARUN CORP Roof 1&2 LOAD CALCULATION FRANCISCO HENAO RESIDENCE, 6506 PENSACOLA RD, FORT PIERCE, FL 34951 VALUE PV SYSTEM DEAD LOAD (PV-DL) SLOPED ROOF SNOW LOAD ON PV PANEL (Unobstructed Slippery Surfaces) SLOPED ROOF SNOW LOAD ON ROOF (Non-Slippery Surfaces) VALUE VALUE Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 3/5 EXISTING 9.23 psf 19.00 psf 0.00 psf EXISTING 22.58 psf 8.03 psf 22.58 psf -39.83%OK 2018 BARUN CORP IEBC IMPACT CHECK Roof 1&2 Roof Snow Load (SL) = The requirements of section 806.2 of 2018 IEBC are met and the structure is permitted to remain unaltered. IEBC Provision : Load Increase (%) = (DL + Lr)/Cd =13.59 (DL + SL)/Cd =10.63 Maximum Gravity Load =13.59 0.00 WITH PV PANEL WITH PV PANEL Roof Dead Load (DL) =12.23 FRANCISCO HENAO RESIDENCE, 6506 PENSACOLA RD, FORT PIERCE, FL 34951 Roof Live Load (Lr) =0.00 Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 4/5 158 23° II Gable C 0.85 20 1 3.00 0.90 982.50 lbs 4.00 3.30 4.00 3.30 4.00 3.30 ROOF ZONE GCp (-) UPLIFT 1 & 2e -1.50 2n - 3e -2.37 3r -2.75 Max. Y - Spacing (ft) (Zone 3r)13.20 -71.08 938.19 UPLIFT PRESSURE (psf) PULLOUT FORCE (lbs) -38.03 501.95 -60.95 804.52 * Wind calculation is based on ASCE 7-16, 29.4 - C&C, LC#7: 0.6D + 0.6W used. Max. Y - Spacing (ft) (Zone 2n - 3e)13.20 Max. X - Spacing (ft) (Zone 3r)Effective Wind Area (ft2) Solar Array Pressure Eq. Factor (γa) =0.60 Allowable Load =S. Pine, 2.5" lag embedment Max. X - Spacing (ft) (Zone 1 & 2e)Effective Wind Area (ft2) Max. Y - Spacing (ft) (Zone 1 & 2e)13.20 Max. X - Spacing (ft) (Zone 2n - 3e)Effective Wind Area (ft2) BARUN CORP WIND UPLIFT CALCULATION Roof 1&2 FRANCISCO HENAO RESIDENCE, 6506 PENSACOLA RD, FORT PIERCE, FL 34951 Ultimate Wind Speed (mph) =Roof Pitch (deg.) = SITE INFORMATION Risk Category =Roof Type = Array Edge Factor (γE) =1.50 Exposure Category =Kd = Mean Roof Height (ft) =Kzt = Solar Array Dead Load (psf) =Kz = DESIGN CALCULATIONS Wind Velocity Press. (qh) = 0.00256*Kz*Kzt*Kd*Ke*V2 =48.99 psf a (ft) =4.50 Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 5/5 PLAN FIGURE 30.3-2C Components and Cladding [h ≤60 ft (h ≤18.3 m)]: External Pressure Coefficients, (GCp ), for Enclosed and Partially Enclosed Buildings—Gable Roofs, 20°<θ ≤27°