HomeMy WebLinkAbout19 Concrete Placement - North Bldg (2-10-22)607 NW Commodity Cove, Port St. Lucie, Florida 34986 [-I-] U N I V E R S A L Phone: (772) 924-3575 Fax: (772) 924-3580
ENGINEERING SCIENCES
GFA PROJECT# 3310.2100058,0000
PROJECT Cristelle Cay Condos North Bldg.
4804 North Al
LOCATION Fort Pierce. Floriuda 34949
PERMIT NO.
1908-0215
OWNER
Cardinal Ocean Development,LLC
CONTRACTOR
Cardinal Ocean Development, LLC
ARCHITECT
Frank C. Snedaker
ENGINEER
Stirling & Wilbur Engineering
WEATHER
TEMPERATURE
WIND
HUMIDITY
CONCRETE PLACEMENT
INSPECTION REPORT
DATE Thursday, February 10, 2022
DAY
S
M
T
W
TH
F
S
I
I
I
I X
I
I
BRIGHTSUN
CLEAR
OVERCAST
RAIN
X
BELOW 60
60-75
75-90
ABOVE90
X
LOW
MODERATE
HIGH
X
Report No
LOW
MODERATE
HIGH
19
X
MEMBERS/AREA INSPECTED: Concrete Placement monitor 2nd floor stem walls for the north and south stairways.
THE FOLLOWING HAVE BEEN INSPECTED FOR COMPLIANCE WITH THE APPROVED
CONTRACT DOCUMENTS AND ACCEPTED PRACTICES.
COMPLIES
YES NO N/A
X 1 SPARE VIBRATOR ON HAND
X 2 FORMS WETTED/OILED
X 3 CONCRETE TICKET SHOWS CORRECT MIX DESIGN (SEE TABLE BELOW)
X 4 CONCRETE SLUMP ON TRUCKS WITHIN SPECIFICATIONS (SEE TABLE BELOW)
X 5 TEST CYLINDERS MADE EVERY 50 YARDS OR DAY'S POUR
X 6 PLACEMENTS COMPLETED WITHIN 90 MINUTES FROM BATCH TIME
X 7 CONCRETE DISCHARGE HEIGHT ADHERED TO 8 FEET
X 8 SUFFICIENT VIBRATION PERFORMED
X 9 STEEL REMAINED IN PLACE DURING POUR
X 10 P/T CABLES REMAINED IN PLACE AND WITHOUT SHARP BENDS
Disposition of Inspection
RX Section / Area Observed Re -Inspection
Work In Progress RRe-Inspection Required
COMMENTS/ACTION REQUIRED: ��
Inspection Performed
Inspection Certified
PI auL03nforth, P.E. V
Registered Professional No:P.P.E. 44653
Certified Special Inspector No: S11103 -
FBPE Certificate No: 4930
cn—chin emai • eorecria., • �onsuucnen ms enais iesting • speci i s i nresnold inspections • wan review n code compliance,
Florida's Leading Engineering Source -