HomeMy WebLinkAboutMW-168 Termite CertSt Lucie County Inspections
2300 Virginia Avenue
Ft Pierce, FL 34982
(722)462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT # OB ADDRESS 9406 Pinebark Ct, Fort Pierce, FL 34951-2948
BUILDER GHO Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE # J170001886
We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in
accordance with the standards of the National Pest Control Association.
Sentricon Always Active HD
Square feet of area treated: 340
Chemicals used:
bait
Percentage of solution:.50%
Total gallons used:
Date of treatment: 02/18/22
Time of treatment: AM
FBC104.2.6 Certificate of Protective Treatmentfor prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
® Footing
duplicate Treatment Certificates as each required protective treatment is
®1 st Treatment
completed, providing a copy for the person the poermit is i1sued to and
17 Re
another copyfor the buildingpermli files. The Dvatment Certftcate shall
-treat
provide the product used, identity of the applicator, time and date of the
�- slab
treatment, site location, area treated, chemical used, percent concentration
F7 I Treatment
and number ofgallons used, to establish a verifiable retort! ofprotective
st
treatment. Ifthe soil chemical barrier methodfor termite prevention is used,
Re -treat
final exterior treatment shall be completed prior to final building approval.
Driveway
St Lucie County requires for the final inspection for CO, a Permanent
1-1 st Treatment
Sticker to be placed on the electrical panel box cover, listing all the
17 Re -treat
treatments and dates of applications.
F Pools
17 1 st Treatment
1- Re -treat
Sig ure of exterminator
F. Other
1— 1st Treatment
1- Re -treat
® Perimeter for Final Inspection
NOTE: There must be a completedform far each required treatment or re -treatment and this form must be on the job site to be
picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee
charged