Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2313 N 41st St Roofing Permit Information Sheet
Form RoofInfoFeb21 Rev Feb 18, 2021 ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET Florida Building Code 7th Edition (2020) Based on Section 1525 of the Florida Building Code - Building INSTRUCTION PAGE COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED BELOW: Roof System Required Sections of the Permit Application Form Attachments Required See List Below Low Slope Application A, B, C Prescriptive BUR-RAS 150 A, B, C 2,4,5,6,7 Asphaltic Shingles A, B, D Concrete or Clay Tile A, B, D, E Metal Roofs A, B, D Wood Shingles and Shakes A, B, D Other As Applicable ATTACHMENTS REQUIRED As Applicable): 1. Fire Directory Listing Page 2. From Product Approval: Front Page Specific System Description Specific System Limitations General Limitations Applicable Detail Drawings 3. Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128 4. Other Component of Product Approval 5. Municipal Permit Application 6. Owners Notification for Roofing Considerations (Reroofing Only) 7. Any Required Roof Testing/Calculation Documentation Section A (General Information) Master Permit No. Process No. Contractors Name: ____________________________________ License # _______________________________ Job Address ROOF CATEGORY Low Slope Mechanically Fastened Tile Mortar/Adhesive Set Tiles Asphaltic Shingles Metal Panel/Shingles Wood Shingles/Shakes Prescriptive BUR-RAS 150 ROOF ROOF TYPE New roof Repair Maintenance Reroofing ROOF SYSTEM INFORMATION Recovering Low Slope Roof Area (SF) ________ Steep Sloped Roof Area (SF) _________________ Section B (Roof Plan) Total (SF) _______ Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels, clearly identify dimensions of elevated pressure zones and location of parapets. NEW HORIZONS ROOFING INC CCC1332348 2313 N 41st St, FORT PIERCE FL 34946 X X 0 2000 2000 SEE ROOF REPORT ATTACHED AT THE END Section C (Low Slope Roof) Fill in specific roof assembly components and identify manufacturer (If a component is not used, identify as "NA") System Manufacturer: ________________________ Product Approval No.:________________________ Design Wind Pressures, From RAS 128 Or Calculations: Zone 1': ___ Zone 1: _____ Zone 2: ____Zone 3: _____ Max. Design Pressure, from the specific product approval system: ______________________________________ Deck: Type:___________________________________ Gauge Thickness: _________________________ Slope: __________________________________ Anchor/Base Sheet & No. df Ply(s): _______________ Anchor/Base Sheet Fastener/Bonding Material: ___________________________________________ Insulation Base Layer: _________________________ Base Insultation Size and Thickness: _____________ Base Insulation Fastener/Bonding Material: ___________________________________________ Top Insulation Layer: __________________________ Top Insulation Size and Thickness: _______________ Top Insulation Fastener/Bonding Material: ___________________________________________ Base Sheet(s) & No. of Ply(s): ___________________ Base Sheet Fastener/Bonding Material: ___________________________________________ Ply Sheet(s)' & No. of Ply(s): ____________________ Ply Sheet Fastener/Bonding Material: ___________________________________________ Top Ply: _________________________________ Top Ply Fastener/Bonding Material: Surfacing: ___________________________________ Fastener Spacing for Anchor/Base Sheet Attachment: Zone 1':" oc @ Lap, # Rows Zone 1:" oc @ Lap, # Rows Zone 2:" oc @ Lap, # Rows Zone 3:" oc @ Lap, # Rows Number of Fasteners Per Insulation Board: Zone 1':Zone 1:Zone 2:Zone 3: Illustrate Components Noted and Details as Applicable: Woodblocking, Gutter, Edge Termination, Stripping, Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing, Coping, Etc. Indicate: Mean Roof Height, Parapet Height, Height of Base Flashing, Component Material, Material' Thickness, Fastener Type, Fastener Spacing or Submit Manufacturers Details that Comply with RAS 1 11 and Chapter 16. FT. FT. Parapet Height Mean Roof Height N/A Section D (Steep Slope Roof System) Roof System Manufacturer: Notice of Acceptance Number: Minimum Design Wind Pressures, If Applicable (From RAS 127 or Calculations): Zone 1:Zone 2e:Zone 2n:Zone 2r:Zone 3e:Zone 3r: IKO INDUSTRIES FL30310-R2 194 MPH PLYWOOD/OSB DOUBLE LAYER SYNTHETIC UNDERLAYMENT N/A N/A 4 ON RIDGE VENTS 11FT 1 1/4 INCH SMOOTH SHANK ROOFING NAILS 6 PER SHINGLE N/A N/A ARCHITECTUAL SHINGLES RESIDENTIAL DRIPEDGE 3” Section E (Tile Calculations) For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mf. If the Mf values are greater than or equal to the Mr values, for each area of the roof, then the tile attachment method is acceptable. Method 1 'Moment Based Tile Calculations Per RAS 12T (Zone 1: Product Approval Ml (Zone 2e: Product Approval Mf (Zone 2n: Product Approval Mf (Zone 2r: Product Approval Mf (Zone 3e: Product Approval Mf (Zone 3r: Product Approval Mf Method 2 "Simplified Tile Calculations Per Table Below" Required Moment of Resistance (Mr) From Table Below Product Approval Mf Mr required Moment Resistance* Mean Roof Height Roof Slope 15’ 20’ 25' 30’ 40’ 2:12 34.4 36.5 38.2 39.7 42.2 3:12 32.2 34.4 36.0 37.4 39.8 4:12 30.4 32.2 33.8 35.1 37.3 5:12 28.4 30.1 31.6 32.8 34.9 6:12 26.4 28.0 29.4 30.5 32.4 7:12 24.4 25.9 27.1 28.2 30.0 *Must be used in conjunction with a list of moment based tile systems • For Uplift based tile systems use Method 3. Compare the values for F' with the values for Fr If the F' values are greater than or equal to the Fr values, for each area of the roof, then the tile attachment method is acceptable. Method 3 "Uplift Based Tile Calculations Per RAS 12T (Zone 1: ______x L_____=x W:=______) -W:______ cos r______=Fr1______ Product Approval F’____________ (Zone 2e: ______x L_____=x W:=______) -W:______ cos r______=Fr2e_____ Product Approval F’____________ (Zone 2n: ______x L_____=x W:=______) -W:______ cos r______=Fr2n_____ Product Approval F’____________ (Zone 2r: ______x L_____=x W:=______) -W:______ cos r______=Fr2r_____ Product Approval F’____________ (Zone 3e: ______x L_____=x W:=______) -W:______ cos r______=Fr3e_____ Product Approval F’____________ (Zone 3r: ______x L_____=x W:=______) -W:______ cos r______=Fr3r_____ Product Approval F’____________ Where to Obtain Information Description Symbol Where to find Design Pressure Zones 1, 2e, 2n, 2r, 3e, 3r From applicable table in RAS 127 or by an engineering analysis prepared by PE based on ASCE 7 Mean Roof Height H Job Site Roof Slope θ Job Site Aerodynamic Multiplier ג Product Approval Restoring Moment due to Gravity Mg Product Approval Attachment Resistance Mf Product Approval Required Moment Resistance Mg Calculated Minimum Attachment Resistance F’ Product Approval Required Uplift Resistance Fr Calculated Average Tile Weight W Product Approval Tile Dimensions L = length W = width Product Approval All calculations must be submitted to the building official at the time of permit application. N/A Roof Report 1817 sqftPrepared by Roofr 2 facets Predominant Pitch 4/122313 N 41st St, Fort Pierce, FL 34946, USA Nearmap Nov 25, 2019 This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.1 Prepared by Building Location 2313 N 41st St, Fort Pierce, FL 34946, USA This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.2 Prepared by Diagram 2313 N 41st St, Fort Pierce, FL 34946, USA This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.3 Prepared by Length Measurement Report 2313 N 41st St, Fort Pierce, FL 34946, USA Eaves 85ft 9in Valleys 0ft 0in Hips 0ft 0in Ridges 42ft 10in Rakes 87ft 5in Wall Flashing 0ft 0in Step Flashing 0ft 0in Transitions 0ft 0in Parapet Wall 0ft 0in Unspecified 0ft 0in 432112112221 21 2243 Note: The above diagram contains measurements that have been rounded up. 6 and 9 are written •6 and •9 to avoid confusion. Some edge length totals have been hidden from the diagram to avoid overcrowding. Flashings are depicted as dotted lines. This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.4 Prepared by Area Measurement Report 2313 N 41st St, Fort Pierce, FL 34946, USA Total Roof Area: 1817 sqft Predominant Pitch: 4/12 Pitched Roof Area: 1816 sqft Predominant Pitch Area: 1817 sqft Flat Roof Area: 0 sqft Unspecified Pitch Area: 0 sqft Two Story Area: 0 sqft Two Layer Area: 0 sqft 870 947 Note: The above diagram contains measurements rounded to the nearest whole number. The total at the top of the page is the sum of all the unrounded (exact) measurements, which is then rounded. Flashings are depicted as dotted lines. Deleted facets, which are not labeled with area, (Skylights, Chimneys, AC units) are omitted from area sums. This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.5 Prepared by Pitch & Direction Measurement Report 2313 N 41st St, Fort Pierce, FL 34946, USA 4 4 Note: Flashings are depicted as dotted lines. Deleted facets do not have a pitch and therefore are not labeled. This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.6 Prepared by All Structures Summary 2313 N 41st St, Fort Pierce, FL 34946, USA Measurements Total Roof Area 1817 sqft Total Pitched Area 1816 sqft Total Flat Area 0 sqft Total Roof Facets 2 facets Predominant Pitch 4/12 Total Eaves 85ft 9in Total Valleys 0ft 0in Total Hips 0ft 0in Total Ridges 42ft 10in Total Rakes 87ft 5in Total Wall Flashing 0ft 0in Total Step Flashing 0ft 0in Total Transition 0ft 0in Total Parapet Walls 0ft 0in Total Unspecified 0ft 0in Hips + Ridges 42ft 10in Eaves + Rakes 173ft 2in Pitch 4/12 Area (sqft)1,817 Squares 18.2 Waste %0%10%12%15%17%20%22% Area (sqft)1,817 1,999 2,036 2,090 2,126 2,181 2,217 Squares 18.2 20.0 20.4 20.9 21.3 21.9 22.2We've calculated the waste percentages you might expect for this job. A number of factors are involved in determining which waste percentage to use including: how complex the roof is, and your roof application style. These numbers only include the roof area. You will also need to calculate the quantity of materials you will need for hips, valleys, ridges, and starter lengths. This report was prepared by Roofr. Copyright © 2022 Roofr.com | All rights reserved.7