Loading...
HomeMy WebLinkAbout30 Day Temporary Power ReleasePlanning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2165 ' Fax 772-462-6443 Request for 30-Day Temporary Power Release Date! 3/1 3/1 7 Permit Number: I i�, Project Address: 3005, NW Radcliffe Way, Palm City, FL 34990 THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE_OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A:FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY,ACKNOWLEDGE AND AGREEAS FOLLOWS: 1. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we hereby agree to abide by all terms and ''conditions of this agreement, including Building Division Policy, which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document:entitled "Requirements for 30 Day Rower for Testing have been fulfilled and the premise is ready for compliance. inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS -OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION O.F THIS AGREEMENT. VP_ 5?� (1 '17 1 Y� OWNER SIGNATURE DA GENERAL CONTRACTOR SIGNATURE DATE LECTRICAL ONTRACTOR SIGNATURE- DATE