Loading...
HomeMy WebLinkAboutCompaction TestingREPORTFIELD PROJECT #: C>,s�✓/� �' f> �2 6,7 DATE: goo, CLIENT: WEATHER: CONTACT: - ARRIVAL TIME: DEPARTURE TIME: ON SITE TIME: ® TRAVEL TIME: / LAB TI E: , lJN 9 2020 EQUIPMENT CHARGE: TRAVEL CHARGE: MILEAGE:ST. IMCIE County, 9 SCOPE OF FIELD WORK: - _ = GENERAL As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of EARTHWORK As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of Earthwork Testing for the As requested, the technician observed the general condition of the areas) to be tested and performed soil density test(s). All test(s) were performed in accordance with t . (nucle r�g'uge / drive sleeve / sand cone) method and were found to ( ee / not meet / pending proctor) the project compaction requirements of % of the maximum dry density per-(ASTM D / D698) (AASHTO T-180 / T-99) (with the exception of test number(s) that failed to meet the project compaction requirements due to CONCRETE/GROUT/MORTAR As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of (Concrete I Grout / Mortar) (Monitoring / Testing) for the While on site, the technician observed the general condition of the area(s) to be teste and cast sets of (cylinders /beams /prisms / cubes) for (compressive / flexural strength) testing. The (concrete / gY ut /, mortar) (t sted / observed) on this day was found to be in accordance with the project plans and specifications with regard to batch time, tempera ure and slp (with the exception of the concrete batch referenced by ticket number , which was found to exceed tolerance for s � Universal Engineering Sciences, Inc. 820 Brevard Avenue Rockledge, FL 32955 321.638.0808 phone 321.638.0978 fax ON SITE TIME: -/ 0 LESS # SETS x-X 1 HR: LESS # IPDS dt X .25 HR: STAND BY TIME: BILLING: TECHNICIAN: �� CONTACT: REPORTFIELD PROJECT: ;� Gl.�/'~,ri'�,�-�5' PROJECT #: DATE: CLIENT: �C�yi�i-yc A'fis�� �o••b.� WEATHER: CONTACT: ARRIVAL TIME: /��'�P �i1�i DEPARTURE TIME: UU APi - - -_-""- ON SITE TIME: TRAVEL TIME: LAB TIME EQUIPMENT CHARGE: TRAVEL CHARGE: MILEAGE: J U N 2 9 6022,0 SCOPE OF FIELD WORK: ST. Lucie County. GENERAL As requecst�ed, a Universal Engineering Technician was present at the above referenced location for the purpose of 1 EARTHWORK As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of Earthwork Testing for the As requested, the technician observed the general condition f�f the area(s) to be tested and performed soil density test(s). All test(s) were performed in accordance with the (nuclear gauge /drive sleeve (` § nd cone) method and were found to (meet /not meet /pending proctor) the project compaction requirements of % of the maximum dry derisit per (ASTM D1557 / D698) (AASHTO T-180 / T-99) (with the exception of test number(s) that failed to meet the project compaction req i ements due to CONCRETE/GROUT/MORTAR As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of (Concrete / Grout / Mortar) (Monitoring / Testing) for the While on site, the technician observed the general condition of the area(s) to be tested and cast sets of (cylinders / beams / prisms / cubes) for (compressive / flexural strength) testing. The (c6 crete /grout / mortar) (tested / observed) on this day was found to be in accordance with the project plans and specifications with regard to batch tfi , temperature and slum with the exception of the concrete batch referenced by ticket number , which was found to exceed tolerance for KZ Universal Engineering Sciences, Inc. 820 Brevard Avenue EB Rockledge, FL 32955 321.638.0808 phone 321.638.0978 fax ON SITE TIME: LESS # SETS K X 1 HR: LESS # IPDS -<X .25 HR: STAND BY TIME: BILLING: A TECHNICIAN: CONTACT: