Loading...
HomeMy WebLinkAboutPetroleum Upgrade Plans3108 Industrial 29 Street, Fort Pierce, Saint Lucie County, Florida 34946 7"Top App IDS #14AND 4 • t ii i 1ii • BUILDING CODES THE SYSTEM SHALL BE DESIGNED IN FULL COMPLIANCE WITH 'THE LATEST EDITION OF THE APPLICABLE SECTIONS OF THE FCLLOWING CODES, STANDARDS, AND GUIDELINES. WHERE CONFLICT EXISTS, CONTRACTOR SHALL FOLLOW THE MOST STRINGENT REQUIREMENTS. IN CASE OF A CONFLICT BETWEEN THE UNIFORM FIRE CODE AND THE NATIONAL FIRE PREVENTION ASSOCIATION STANDARDS, THE MOST STRINGENT CONDITION SHALL APPLY: UNDERWRITERS LABORATORY (UL) OR FACTORY MUTUAL (FM) NFPA 70—NATIONAL ELECTRIC CODE 2017 EDITION ���'���i������1 I�I��lr~i17�.ii�E��I r7 IL�[ww�T. . 1:DEP Fac ID . •00Streetil (GENERAL STATEMENT: THE PROPOSED WORK WILL CONSIST OF THE REMOVAL OF THE EXISTING DIESEL FUELING SYSTEM AND THE INSTALLATION OF A NEW ONE. THE EXISTING 12,000 GALLON ABOVE GROUND DIESEL FUEL STORAGE TANK, CANOPY AND RELATED ITEMS WILL BE REMOVED. THE TANK SLAB WILL BE ALTERED. A NEW SYSTEM WITH ONE (1) 12,000 GALLON UL2085 DOUBLE -WALLED ABOVEGROUND FUEL STORAGE TANK WILL BE INSTALLED. NEW TANK TOP FITTINGS INCLUDING HARDWARE AND OVERSPILL PREVENTION WILL BE INSTALLED AS REQUIRED. (NEW PIPING WILL BE INSTALLED FOR THE FUEL AS NECESSARY PER THE PLANS. A NEW CANOPY DESIGNED BY OTHERS WILL IBE INSTALLED. PETROLEUM ENGINEER: STILLWATER TECHNOLOGIES, INC. 1700 North Orange Avenue Suite 100A Orlando, Florida 32804 (407) 206-7222; (407) 206-7223 (fax) Contact: Rick Blecha, P.E. Email: rblecha@stillWatertech.com _ mn-.-rc NnRh "� - For; Fierce A SITE e VICINITY MAP SOUTHERN PUMP & TANK COMPANY 435 CASSAT AVENUE Fort, Pierce, Florida, FL 32254 (904) 680-0860 Contact: Dale Jessup dale.jessup@southei npump.com Digitally signed by Frederick A Blecha DN: c=US, o=Stillwater Technologies Inc., ou=A01410C000001701689322200 011 EFD, cn=Frederick A Blecha Date: 2020.05.15 11:10:02-04'00' This item has been electronically signed and sealed by Frederick A. Blecha, P.E. on the date and time shown using a digital signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. GENERAL NOTES: I. CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH APPLICABLE CITY AND COUNTY CODES AND REGULATIONS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS FOR COMPLETION OF THE PROPOSED WORK. 3.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL APPLICABLE UTILITY CLEARANCES USING PROPER NOTIFICATION PERIODS PRIOR TO CONDUCTING TRENCHING OR EXCAVATION ACTIVITIES. 4. SITE PLAN ELEMENTS SHOWN HEREIN ARE FOR INFORMATION PURPOSES ONLY AND HAVE BEEN ��PAR•�,1 BASED ON A SITE -PLAN DE PROVID BY CONT CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS, PROPERTY BOUNDARIES, SITE GEOMETRY AND EASEMENTS PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL INSTALL ALL ELECTRICAL IN ACCORDANCE WITH NFPA 70 "NATIONAL REVIEWED FOR ELECTRICAL CODE" AND SPECIFICALLY CODE COMPLIANCE CHAPTER 5 ARTICLE 514 (LATEST EDITION). ST. LUCIE COUNT�s socc SHEET # SHEET NAME 1 G01 COVER SHEET 2 PE01 GENERAL SITE, WORK AREA PLAN AND WORK SCOPE 3 PE02 PETROLEUM SYSTEM DEMOLITION AND INSTALLATION PLAN 4 PE03 PIPING PLAN, DIMENSION PLAN AND DETAILS S PE04 ANCHORING, WIND LOAD AND ADDITIONAL DE:TAILS .d L O s_ PJ. E C �N 0 0 0 N C Q N 0 a a m 3 v s u 01 0 0 n. 0 0 0 iu 0 c (D E 7 0 0 m v o} C U m rn .0 s_ GD C C 0 s 09 0 U rn 0 U c �i �s O O C 0 L O Q 0 a 04 -C U) *c a U I41/ZX y\vCo .---. rd * a o; � Z Q C A //II N 11111\�� 43 v :3 -v CLz 4) `o111.0 �^IL Q�c4 CL M M Ir Z O o Z CU 43 (a i ® LvY Z U •Q W F— W a N Lei w w � wU too r = h+� T-4 [q7' q � ° N ¢ 00 00 `O•/ n O iryJV N N °r- �w ° .� ppppppoo� Z CNN N xf� 0 2 M U Uj rn y Y m Ex Ex N co M 0 f ir o PROJECT #: 347-017 DRAWN: RMH APPROVED: FAB DATE: 03/18/20 SCALE: AS NOTED SHEET NAME: 01 SHEET: H I I g i 9 1 1 i a s d �.•� � �.f.�iHhntr.... �-+�+»4...Aesamrvu.warervml.v .. ...-,.adx.uM,�a.=.+�n.�.om ^ara...aum.._vurrwrvw.m+=.. ..e«.u'�we✓mm� l i S ' wme.:v.w u. +uww,->i nv.:,.A...du*+a S 4 ; : r t' 1 � 1 . PROPOSED WORK AREA k c e � ,i GENERAL PROPOSED i• AREA * k 6 IN Digitally signed by Frederick A Blecha DN: c=US, o=Stillwater Technologies Inc., ou=A01 41 00000001 7016893222 00011 EFD, cn=Frederick A Blecha Date: 2020.05.15 11:08:18-04'00' This item lies been electronically signed and sealed by Frederick A. Blecha, P.E. on the date and time shown using a digital signature. Printed copies of this document are not � considered signed and sealed and the signature must be verified on any electronic copies, p d L Q C ✓�i E pf m L (9 49 C O L G W C Q U 7 Q a m 0 0 a m i G �y 9 0 0 a a L Q C C .c 0 0 0 C 01 E G G SCOPE OF SERVICES: 1. REMOVE EXISTING ABOVEGROUND FUEL TANK AND ALL APPURTENANCES. 2. REMOVE EXISTING DISPENSERS AND CONTAINMENT., 3. REMOVE SELECTED BOLLARDS AS SHOWN ON PLANS, 4. REMOVE EXISTING CANOPY AND COLUMNS. A 5. SAWCUT AND REMOVE CONCRETE AS NECESSARY TO C ACHIEVE PROJECT EXECUTION. 6. EXTEND TANK SLAB AS SHOWN ON FLANS. 7. INSTALL ABOVEGROUND UL2085 STORAGE TANK PER PLANS 8. INSTALL NEW CANOPY DESIGNED BY OTHERS 9. INSTALL REMOTE FILL AND PIPING PER PLAN`.). 10. INSTALL DISPENSERS PER PLAN. u 11. INSTALL ALL RISERS, FITTINGS AND EQUIPMENT FOR A FULL C AND COMPLETE SYSTEM., 12. INSTALL. FUEL MANAGEMENT SYSTEM AND TANK MONITOR SYSTEM COMPONENTS. 13, PURGE, CALIBRATE AND CLEAN UP ALL DEBRIS. L r a '■ I l llti�pz e,\eti\\t11! zz- .�1W r0 p s3 ` a s-WEI 46 Me Y ` o oW ZUj /rgw 2 Z Z ® (LLA Ir '0 i d 0 V �4 y0 CN O •� r^W 4 W f~ WI ,y. y � pp W b z 9 o ram, z o o z� V V , e> f,a C Ir W a o 8 M � W F N W � M 0 0 PROJECT #: 347-017 DRAWN: RM13 APPROVED: FAB DATE: 03/18/20 SCALE: AS NOTED SHEET NAME: P SHEET: N I Digitally signed byFrederick A Blecha ON: c=US, o=Stillwater `�\� GAP • - _ -�'ya �/� Technologies Inc., -z v ou=A01410C00000170168932220 ` 40;ar: 0011 EFD, cn=Frederick A Blecha ,z ° al Date: 2020.05.15 10:59:51-04'00' This Item has been electronically signed and •., sealed by Frederick A. Blecha, P.E. on the date and time shown using a digital signature. y Si/� �'e�/y • • �'��'�' Printed copies of this document are not 't �J/ * 1,� considered signed and sealed and the signature S /`f%� I 1111�e`` must be verified on any electronic copies. 2 d 0 aN+ a Z 4) L0 Cq e W ar"r ZPL C3 ° w rn Z + rn Fa— L. LL o N 'Af LL t c i ;. � ',:.:�•e..:vFwtx°�d..tr rnu.. ,-.w:rra � �w�, ++ " r O OL n , Y CL M �ry APPROXIMATE LIMITS OF RAISED SLAB TO BE REMOVED TO FACILITATE THE PROJECT R NEW 6.0 PIPE BOLLARD (TYPICAL OF ALL AS SHOWN) •� i Vl LIMIT OF 6" THICK 4,OOD PSI CONCRETE TANK SLAB EXTENSION- ° EXISTING PIPE BOLARD TO BE _ {" 0 REMOVED (TYPICAL OF FIVE) 12,000 GALLON DOUBLE -WALLED UL-206S Fi`-1 i�l EXISTING PIPE BOLLARD TO REMAIN IN ABOVEGROUND DIESEL FUEL STORAGE TANK, a PLACE (TYPICAL OF ALL ON EAST SIDE) a ® Fri EXISTING VACUUM TO REMAIN IN PLACE- INSTALL NEW EMERGENCY STOP ON STEEL POST (>20' AND ® = t100' FROM NEAREST DISPENSER) (SEE DETAIL ON SHEET PE03) w EXISTING GROUND FUEL EXISTING PANEL TO REMAIN IN PLACE - STORAGE TANK TO BE REMOVED ° LIMIT OF 6- THICK 4,000 PSI CONCRETE EXISTING DISPENSER TO BE PATCH (TYPICAL OF ALL PATCHES) APPROXIMATE LIMITS OF PAVING TO BE REMOVED TO REMOVED (TYPICAL OF TWO) r-- — ------_—, Q M��•1 FACILITATE THE PROJECT (TYPICAL OF ALL AREAS) NEW 6"0 PIPE BOLLARD (TYPICAL OF ALL AS SHOWN) ° I NEW COLUMN (TYPICAL OF FOUR DESIGNED BY OTHERS) I •- � e I r .at#• APPROXIMATE LIMITS OF PAVING TO BE REMOVED TO I ' 'a«4 °'`a _ _.4' X 16' RAISED ISLAND (TYPICAL OF TWO u, EXISTING CATCH BASIN TO REMAIN + + ) IN PLACE (TYPICAL OF THREE) ' "•v, FACILITATE THE PROJECT (TYPICAL OF ALL AREAS) —FUEL ADDITIVE SHED d o0 0`00 '•.'�°:,. v ��' m •i .• EXISTING CANOPY TO BE REMOVED , .•..'A e . , :. � X `• . ❑ `--_ "----SATELLITE DISPENSER' (IYPICAI OF 1W0) v: }. 4,Y'•s, ',•'i';'•,a•'.r '•..Y,Y ,. •.f 'r .y �,r'' I a EXISTING OIL/WATER SEPARATOR TO REMAIN IN PLACE ,!!y,r,,,,<'t • • ""'-- -.. i L : , T• qo.. ,. ...�..-� I 4 : ® • ti I_--- SJ • r• N N d "• + n a.: +`" �: ?, I aR: :• ia.z : 0 : • I FMS PEDESTAL AND ANTENNA (TYPICAL OF TWO) �p O O o w EXCEPT AS BEING REPLACED TO FACILITATE THE PROJECT, THE EXISTING PROTECTIVE BOLLARD TO REMAIN IN PLACE EXISTING CONCRETE IN THE FUELING AREA IS TO REMAIN IN I c n I w d g ' 0 8 NEW COLUMN (TYPICAL OF FOUR DESIGNED BY OTHERS) res N N PLACE. END RESULT WILL BE IN COMPLIANCE W1Tii FDIC 406.7.E I Z EXISTING CANOPY COLUMN TO L------'------- --� _ �,.-��-��� v.--�/ ��i L � U BE REIGNED (TYPICAL OF TWO) w — NEW C WOPY (DESIGNED BY OTHERS) DRIPLINE (CANOPY SHALL EXISTING DEF TANK TO REMAIN IN PLACE r a HAVE CLEAR, UNOBSTRUCTED HEIGHT` OF NOT LESS THAN 13 c EXCEPT AS BEING REPLACED TO FACILITATE FEET SIX INCHES TO THE LOWEST PROJECTING ELEMENT.) v , THE PROJECT, THE EXISTING CONCRETE IN EXISTING DEF TANK PROTECTIVE THE FUELING AREA IS TO REMAIN IN PLACE `r1 BOLLARDS TO REMAIN IN PLACE 4' X 10' RAISED ISLAND FORMS MASTER DISPENSER (TYPICAL OF TWO) �LidLEi _ REMOTE FILL e ' CONTRACTOR SHALL SAVE ALL ELECTRICAL CONDUITS $ IN ANTICIPATION OF ADJUSTMENT AND REUSE. NOTE: ` �.P.t N CONTRACTOR SHALL ADJUST EXISTING o ELECTRICAL CONDUITS TO FACILITATE THE O c INSTALLATION OF THE NEW EQUIPMENT. , r , d n W d 1 - - - , . �' i'�- 0 a c - .. _ x C C EL � ♦— N N L aa O i REVIEWS "" PROJECT #: 347-017 e ( coE. " ..�J6 BRAWN: ItMH z 0 h •- :di,n:fvn::Y.,�Gb'�,b�±3 'b P:Ks..'=x."xe.z"9F".Ys. . ."rtr"C:"R�fx'. ' .- �°' ° Bocc ° APPROVED i �13 x DATE: 03/18/20 SCALE: AS NOTED v o' 2 40' 0' 20� ' FILE SHEET NAME: ESCALE: 1" = 20' SCALE: 1" = 20' ■ n�°j a 1 PETROLEUM SYSTEM DEMOLITION PLAN PETROLEUM SY" STEM INSTALLATION PLAN SHEET; 1"=20' 1"=20' r-o- •I e • e •I1 0 10 • ------------------------------------ I� ISLOO 1 PETROLEUM DIMENSION + e a M Z O cv) 6"0 ROUND SCH 40 STEEL FILLED WITH CONCRETE: PAINT SAFETY YELLOW ELASTOMERIC SEALANT YARD OR SLAB SURFACE AS OCCURS 24"0 CONCRETE FOOTING 2" NORMALLY CLOSED SOLENOID VALVE 21"0 THREADED 2'0 UNION 200 (EXTEND TO INSTALL LEAK DETECTOR TEE AND MECHANICAL LEAK DETECTOR 2"0 THREADED NIPPLE 0° 10' 20' SCALE: 1" = 10' THREADED NIPPLE F2' EMERGENCY SHUT OFF VALVE 2" X 3" THREADED NIPPLE 2.0 90` (BACK TO HORIZONTAL) 2"0 THREADED NIPPLE ,�--2"0 90' (TURNED DOWN) � OUTSIDE WALL OF TANK NOTE: INSTALL PRESSURE RELIEF PER PEI RECOMMENDATIONS THREADED NIPPLE BALL VALVE THREADED NIPPLE BINS PUMP 300 BLACK STEEL ABOVE GROUND DIESEL FILL MASTER DISPENSER f 2"0 DOUBLE WALLED UNDERGROUND PIPING • I • ° / �~ -- - I----- ------- -- SATELLITE DISPENSER i •a +: .®."• I "' w . • 4e p .e 4. El ir 11j ,i .�.• a sy . !,, M, I t ❑ C7 I I ------------------------------- PETROLEUM PIPING LAYOUT t i , EMERGENCY SHUT-OFF ,PUS BUTTON. •r".. 11 f�1 F4 a6 fi4, l lKY➢ai" 1.1..'t11. ' ° 1 1 PILLA MODEL ST120ESO (Emergency Shut -tiff) RUSH BUTTON STATION Aft NO SCALE BOLLARD DETAIL (TYPICAL) N® 54E STP DISCHARGE PIPING DETAIL (TYPICAL) NO SCALE Digitally signed by Frederick A Blecha DN: c=US, o=Stillwater Technologies Inc., ou=AO1410C000001701689322200 011 EFD, cn=Frederick A Blecha Date: 2020.05.15 11:09:07-04'00' This item has been electronically signed and sealed by Frederick A. Blecha, P.E. on the date and time shown using a digital signature. ffi Printed copies of this document are not =• considered signed and sealed and the signature must be verified on any electronic copies. L N - DIESEL FILL WITH POSITIVE SHUT OFF DROP TUBE E - DIESEL STP c _---- LEVEL PROBE - - 2"0 BLACK STEEL ABOVE GROUND DISCHARGE PIPING o PRIMARY EMERGENCY VENT +' rn �— INTERSTICE SENSOR U -- MANWAY Vf 0 STANDARD 300 VENT - SECONDARY EMERGENCY VENT a CLOCK GAUGE �- SATELLITE DISPENSER i a MASTER DISPENSER 2 a- �a d t a. °c U �- 200 DOUBLE WALLED UNDERGROUND PIPING L 0 m N Q C n �- DIESEL REMOTE CONTAINER 0 FILL .N 0 0' 10' 20' 1-4 4tLS SCALE": 1" = 10' r NOTE: PUSH BUTTON ASSEMiBLY TO BE MOUNTED TO A zi FLAT STEEL PLATE ATTACHED TO A 2"0 STEEL POST EMERGENCY STOP DETAL U �x R --------------------- t � � 2; I t M irM1 • .L" A i r � M" i`• • 0. � Y t e r y � 3 0 ss*f r T xat� 1 MI �.' x. " I: C�Ou ,•.9 .,b rya �,- 0 lit � O �. Q + wa to CIL. r— z 0) �y LO �d <V"N fL M w- I) Q Z U 0) V) Q. =Lj Z n ~ 0 CL L O Q ® 1-- M L - °- (A ep � W • pot I� "0101 Id M � V C fp3v.1' Fri � A M� F�1 N N � oo 00 p M � g o� CNN „ f k rA' Y' �4 F 0 U IL o in U K ir x W L0 O O 9 f� O PROJECT #: 347-017 DRAWN: RMI-1 APPROVED: FAB DATE: 03/18/20 SCALE: AS NOTED SHEET NAME: P SHEET: i e G J --DISPENSER Digitally signed by Frederick A Ble ha DNcc=US, o=Stillwater Technologies Inc., &..'"'✓ ? ou _ �~a UCT 011 FD, cn0 FOrederick A Blecha 200 = 4 ,z 0 ; BREAKAWAY j 3" BLACK STEEL FILL Date: 2020.05.15 11:06:17 -04'00' O- x G PIPE, CHECK VALVE, This item has been electronically signed and j �'� a to 'k" AND BALL VALVE °. sealed by Frederick A. Blecha, P.E. on the date NOZZLE AND SPLASH + andtimeshown using a digital signature. GUARD Printed copies of this document are not 4\\ considered signed and sealed and the signature ;Cp must be verified on any electronic copies, C HOSE REMOTE FILL BOX Ad EXISTING YARD SURFACE AS OCCURS- a .� °- z 0) 0 In 3/4" CHAMFER D " = _ i4 ALL SIDES (TYP.) #4 REBARS AT 12" NEW 8THICK 4,000 PSI °L0 ,o E O.C. EACH WAY3 REINFORCED CONCRETE SLAB ,, +1 urn n- ,F ® C7 rn o Z V N C) SWIVEL ! e. 4 O o = Y Q m -0 Z G.3 tl 's on g = Q p ® Ld ® ~ ®ii ° ° -III-III-III-III-III-III-III-III III -III III -III -III -III -III -III -III -III `� `t `_ DISPENSER PEDESTAL WITH SUMP SHEAR VALVE 6 o EXISTING COMPACTED BASE MATERIAL TO ° ° REMAIN U PRODUCT PIPE ENTRY BOOT ° ° EXISTING SUBGRADE TO REMAIN o �I CONCRETE ISLAND ° ° CL :A a e - .! < 4 4.. CL TYPICAL DISPENSER DETAIL (PIPE TURNED 900 FOR CLARITY) 5 REMOTE FILL DETAIL (TYPICAL) 6 TYPICAL TANK SLAB EXTENSION SECTION „c) NO SCALE B NO SCALE NO SCALE Force, F=AxPxCd 6 •• F + I�aj A Area of Item RIGID PIPING SPECIFICATIONS 0 0 ® -0 ° v P Design Wind Pressure (psf) .00256xVelocity Squared 2.1 VENT & VAPOR RECOVERY PIPING 3 Z H �y A. PIPING: Gd Drag Coefficient 2,0 for fiat plates, 1.2 for long cylinders 0.4 1. STEEL PIPE: (GALVANIZED) ALL PIPING SHALL SLOPE BACK TO TANKS (1% MIN.). o Fastest Wind Velocity 170 mph B. HANDLING OF PIPE & FITTINGS: ^ Facter Assumed to get to 3-Second Gust 1.214 ALL PIPING INSTALLATIONS SHALL CONFORM TO PIPE MANUFACTURER'S SPECIFICATIONS AND INSTALLATION GUIDELINES, CL 1. FIBERGLASS PIPE: PROTECT AGAINST ABRASION FROM SHARP OR HARD OBJECTS: IMPACT ItAMAGE FROM IMPROPER STORAGE, a y...� Therefore 3-Second Gust Is 206.38 mph TRANSPORTING, LAYING OR BACKFILLING. INSPECT ALL PIPE FOR DAMAGE PRIOR TO USING IN THE PIPING SYSTEM. Wind Speed Used For Calculation 210 mph 2. STEEL PIPE AND FITTINGS: PROTECT AGAINST DAMAGE TO THE PROTECTIVE COATING. 0 r } 2.2 INSTALLATION REQUIREMENTS: 2 Length of Object 35.67 feet A. LAYING OF PIPE: U) H Height of Object 9 feet 1. INTERIOR SURFACE OF ALL PIPE AND FITTINGS MUST BE FREE FROM DIRT, SCALE, METAL, FIBERGLASS PARTICLES, ETC., BEFORE c �% Area of Object 321.03 sq. feet CONNECTING. Wind Pressure 112.896 psf 2. DO NOT SUPPORT PIPING WITH FOREIGN OBJECTS, SUCH AS SCRAPS OF WOOD, PIPE, ETC. USE MAJOR OIL APPROVED PIPING SUPPORT B. CUTTING OF PIPE: Drag Coefficient Applied 2.00 1. CUT PIPE TO ENSURE A SQUARE CUT END. CUT PIPE END MUST BE WITHIN 1/8" OF SQUARE. G Force 72486.01 lbs C. TAPERING & REAMING: ti 1. FIBERGLASS PIPE: ALL CUT ENDS MUST BE TAPERED PER PIPE MANUFACTURER. PROTECT PIPE DURING TAPERING TO PREVENT DAMAGE TO v Weight Of Object 32370 1bSPIPE. THE FINISH TAPER SHALL BE SMOOTH, CLEAN, AND FREE FROM SURFACE DEFECTS. THE LENGTH CF TAPER FOR 2" DIAMETER PIPE c ��] Shear Force of Ech Anchor (3,000 psi cone) 22030 Ibis IS 1 5/8" AND FOR 3" DIAMETER PIPE IS 1 3/4". FOR OTHER SIZE PIPE, CONSULT PIPE MANUFACTURER'S INSTRUCTIONS. a c00 Pull Out Force of Ech Anchor (3,000 psi cone 14340 Ibs 2. STEEL PIPE ENDS ARE TO BE REAMED PER INDUSTRY STANDARDS. E ' r D. BONDING & ADHESIVE SYSTEMS (AMERON FIBERGLASS PIPE): o I O o N N d Number of Anchors 4 1. ALL FIBERGLASS PIPE SURFACES TO BE BONDED SHALL BE CLEANED WITH SOLVENT AS RECOMENDED BY MANUFACTURER. APPLY -0 r;,l z Resistance to Lateral Movement 88120 Ibs PRESSURE UNTIL MECHANICAL LOCK IS ACHIEVED. BACK AXIAL PRESSURE SHOULD BE MAINTAINED ON A_L PREVIOUSLY ASSEMBLED JOINTS ^I�" Z d N N Resistance to Uplift 89730 TO REDUCE THE CHANCE OF SEPARATION. •�� rz i, o 2. INSPECT ALL FITTINGS FOR PROPER ALIGNMENT AND POSSIBLE "'BACK OUT" AT THE JOINTS. � C r rn O 1 1bS 3. FOLLOW PIPE MANUFACTURER'S RECOMMENDATIONS ON CURE TIME BEFORE DISTURBING JOINTS OR TESTING. Safety Factor to Sliding 1.22 E. THREADED JOINTS: THREADED JOINTS MUST BE REAMED AND HAVE CLEAN CUT, PERFECT THREADS AND BE MADE UP WITH N04-HARDENING JOINT COMPOUND Safety Factor to Uplift 1.24 INSOLUBLE IN PETROLEUM PRODUCTS. DO NOT USE ADHESIVE FDR iHR Fb CONN d 1 FAO nowa F. FIBERGLASS TO STEEL PIPE CONNECTIONS: N 9 FIBERGLASS THREADED END ADAPTERS ARE TO BE THREADED INTO THE STEEL PIPE OR FITTING BEFORE BONDING ONTO THE FIBERGLASS PIPE. t 4 1 " EMERGENCY SHUTOFF VALVE INSTALLED ALL FLEXIBLE CONNECTORS ARE MADE FEMALE. THE FEMALE END CONNECTS TO THE FIBERGLASS PIPING. 11J) NOT USE ADHESIVE FOR °' I F PER MANUFACTURER'S INSTRUCTIONS THREADED CONNECTIONS. `' F ELECTRICAL CONDUITFOR POWER G. SPECIAL FITTINGS: v < r' REQUIRED AT EACH DISPENSER POSITION THE VALVE SO THAT THE LINE TEST PORT PLUG IS ACCESSIBLE. ® 4 H. SETTING & BEDDING PIPE: ELECTRICAL CONDUIT FOR DATA / ISLAND SURFACE 1. PIPING SHALL BE PLACED ON PREPARED BED IN SUCH A MANNER AS TO MINIMIZE POINTS AT WHICH ONE PIPE MAY CROSS OVER c TANK SADDLE UL-2085 12,000, ANOTHER PIPE, AT POINTS WHERE PIPING MUST CROSSOVER, A MINIMUM OF 4 INCHES MUST SEPARATE 'THE PIPES. (TYPICAL OF 2) GALLON 2. WHEN PIPING IS PLACED ON THE BED, PROCEED TO "FIRST TEST" (BELOW) PRIOR TO BACKFILLING TRENCHES. or DOUBLE -WALL :. ;'.':? .; • :,.: I. CLEANING SOLVENTS: a ABOVEGROUND . REMOVE ANY ACCUMULATION OR ACCIDENTAL SPILL OF PIPE CLEANING SOLVENTS ON THE TANK IMMEDIATELY WITH A CLEAN CLOTH. AFTER p ` ` +� THE PIPING IS COMPLETE, INSPECT THE CONTAINMENT SUMP AND OTHER COLLECTION POINTS FOR PIPING CLEANING SOLVENTS. STORAGE TANK PROVIDE 3/4a:d WEDGE TYPE /_ ANCHORS (RED HEAD TRUBOLT OR BACKFILL J. FLEX CONNECTOR BOOTS: � ENCASE ALL FLEX CONNECTORS IN AN ISOLATION BOOT WHEN IN CONTACT WITH SOIL OR BACKFILL MATERIAL. MOVE THE ISOLATION TO 'G EQUAL) EMBEDDED 6.625" INTO �� . MATERIAL INSPECT AND TEST ALL PRIMARY PIPING AND FLEX CONNECTOR. 2.3 TESTING OF PIPING: L CONCRETE (TOTAL 4 AT TANK �'� A. NOTIFY THE OWNER'S REP., WHO SHOULD OBSERVE ALL TESTS, AT LEAST 24 HOURS IN ADVANCE OF ANY 'TESTS. CONTRACTOR TO ca „ SEALING FITTINGS LEGS) (SEE NOTE FOR WIND LOAD) FLEXIBLE CONNECTOR COORDINATE TESTING WITH LOCAL INSPECTORS AND OWNER'S REP. c tin PROPOSED 8 THICK (OPTIONAL) B. RESPONSIBILITY: CONCRETE SLAB THE CONTRACTOR IS RESPONSIBLE FOR ALL LABOR, MATERIAL, AND EQUIPMENT TO CONDUCT PRESSURE TESTS (AIR OR HYDROSTATIC) OF 01 v ir CONTAINMENT SUMP ALL PRODUCT, VENT A14D VAPOR RECOVERY PIPING. 0 - CONDUIT FOR DATA 0 C, TESTING DEVIATIONS: � � g DO NOT DEVIATE FROM THE FOLLOWING TESTING PROCEDURES. PERFORM ALTERNATE TESTING PROCEDURES REQUIRED BY LOCAL INSPECTORS cci ¢ of AFTER OWNER'S TESTS ARE COMPLETED AND DOCUMENTED. H N N CONDUIT FOR DISPENSER) 2ELBOW 1. FIRST TEST (PRIOR TO BACK FILLING PIPE TRENCHES): 00 NOT CONNECT PIPING TO TANKS, REMOTE PUMPS OR DISPENSERS. DO NOT `. °D POWER SEAL OR INSTALL SECONDARY CONTAINMENT FITTINGS UNTIL PRIMARY PIPING IS TESTED. TEST THE ENTIRE PIPING SYSTEM, I.E., PRODUCT, , o VENT AND VAPOR RECOVERY (WHERE APPLICABLE) IN ACCORDANCE WITH THE FOLLOWING PROCEDURE, A. STEP ONE: INSTALL PRESSURE APPLICATION SYSTEM THAT INCLUDES TWO PRESSURE GAUGES (15 PSI MAXIMUM). APPLY 10 PSI Vir c PRESSURE TO EACH PIPING SYSTEM. SOAP ALL JOINTS USING APPROVED SOAP SOLUTION. CAREFULLY OBSERVE EACH JOINT FOR EVIDENCE OF LEAKS. NEW DOUBLE-WALB. STEP LED O PROJECT : 347-017 NATIVE SOIL TWO: PROTECT AREA AROUND PIPING SYSTEMS TO BE TESTED TO PREVENT WORKMEN, PASSERS-BY, ETC., FROM ENTRY. N PRODUCT PIPE (PRODUCT PIPE INSTALL PRESSURE APPLICATION SYSTEM THAT INCLUDES TWO PRESSURE GAUGES (75 PSI MAXIMU!4). APPLY 60 PSI PRESSURE TO7T'!PRIMIMARY EST BOT EACH PRODUCT PIPING PRIMARY SYSTEM ONLY. ALL OTHER SYSTEMS SECONDARY. VENT & VAPOR & TANK TESTS AT 5 PSI MAX.vWE DRAWN: RMI-1 PRODUCT PIPE ENTRY FITTING RECORD ALL TEST RESULTS. THE CONTRACTOR SHALL BACKFILL ALL TRENCHES TO SUBGRADE, MIND LOAD: D. TESTING EQUIPMENT:OVED FAB 1. FLORIDA BUILDING CODE 2017 AND ASCE 7-10 TEST LINES USING PETRO TITE HYDROSTATIC LINE TESTING EQUIPMENT OR APPROVED EQUAL. TEST FLUID SHALL BE ASSIGNED, DLEC' 1E Y DIESEL FUEL. CONTRACTOR TO COMPLY FULLY WITH THE PROCEDURE MANUAL FOR THE OPERATION OF LINE, TESTER. TEST PRESSURE SH pTE: 03/18J21) 2. ROOF LIVE LOAD - N.A. TE'e 3. IND - 1 0 PH. TANK AND APPURTENANCES WEIGH APPROXIMATELY 32,370 LBS. BASED BE (1.5 TIMES OPERATING PRESSURE - 150%) FOR A REMOTE PUMP SYSTEM WITH AN ALLOWABLE TOLERANCE OF 0.010 GAL/HR. VENT LINES (No PHASE II VAPOR RECOVERY): IS CA EG Y - II ON WIND LOAD FOR SAINT LUCIE COUNTY AT 170 MPH PER ASCE 7-10 E. UNLESS REQUIRED BY LOCAL AGENCY, NO SECOND TEST REQUIRED. SCALE: AS NOT1 D 5. INTERNAL PRESSURE COEFFICIENT - N.A. TANK IS STABLE WITH A FACTOR OF SAFETY IN EXCESS OF 1.1 6COMPONENTS AND CLADDING - ASSUME 81 PSF. F. VENT LINES AND VAPOR RECOVERY PIPING (WITH PHASE II VAPOR RECOVERY): - 7,, SOIL CAPACITY 2000 PSF ASSUMED. CONTRACTOR IS RESPONSIBLE FOR VENT AND VAPOR RECOVERY PIPING SYSTEMS PASSING ANY LOCALLY IMPOSEC TESTS. SHEET NAME: 8. TANK WEIGHS APPROXIMATELY 32,370 LBS. FILE COP 9. TANK IS STABLE WITH A FACTOR OF SAFETY >1.1 WITH ANCHORAGE. P TANK WIND LOAD AND ANCHORING 2 DISPENSER SUMP DETAIL (TYPICAL) NOTES SHEET: NO SCALE NO SCALE NO SCALE 0 0 o I I i f 1 I I i Ss'-o o GENERAL NOTES DECK � 1L 5 L11/2xI'/2x1/g L13/gx15/gx'c6GA 46'-0 4 -p 3 0 FOUNDAMONS: 7 FASCIA BRACE \� 54'-0 V-0 04'-oo/c w/ w THE SOIL BEARING VALUE SHALL NOT BE LESS THAN 2000 7' GUTTER TIE TRACK PSF. THE BEARING VALUE SHALL BE VERIFIED BY THE G.C. B 3mm AGM FOOTINGS SHALL BEAR IN UNDISTURBED SOIL. ALL T/FOOT. BEAM MAIN FASCIA I ELEVATION ARE TO BE THE SAME UNLESS SHOWN OTHERWISE. _ L1x1x1/8 1i 1/2„ LIP 2 IF ELEVATIONS ARE NOT THE SAME, CHAPMAN CANOPIES MUST BE INSTRUCTED OF ELEV. S IN WRITING WHEN CANOPY W1Sx35 ORDER IS PLACED. FOOTINGS DESIGN COMPLIES W/ACI-318. f GUTTER 4-4- _ I REINFORCING _STEF.I TY "� a ALL DEFORMED BARS SHALL COMPLY w ASTM A615 FY-60 AND V 1/6 f° SHALL BE WIRE TIED AT ALL JOINTS. RUSTY, OILY, OR DIRTY 1 I I I I I I STEEL SHALL NOT BE USED. I i I 1 I W18x35 I I I STAGG. DECK ANCHOR BOLTS: FASCIA TO BE CLIPS PURLIN 3mm A.C.M. L93/gxl5igx16GA 24 GA SCUPPER TO MATCH GUTTER ANCHOR BOLTS MUST BE INSTALLED WITH A TEMPLATE AROUND ENTIRE CANOPY RIVET TO GUTTER AND WITHIN 1/8-INCH OF MEASUREMENTS OF THE BASE PLATE OR COLUMN WILL NOT FIT. CONCRETE CONTRACTOR FLAT PAN DECK IS RESPONSIBLE FOR RECESSING FOOTINGS 10 - INCHES L11/2x11/2x1/g BELOW FINISH GRADE AND FOR EXTENDING ANCHOR BOLTS W1Sx35 CI SCUPPER IP 5 - INCHES ABOVE FOOTINGS IN ORDER FOR CANOPY TO DECK P-16 TO BE 22 GA CUTTERo V J7" 1- ERECT PROPERLY. ANCHOR BOLTS SHALL BE ASTM F1554 f i I i i w (PERIMETER) GRADE 36. 1 D I I I I B 99NCWSECTION _ FIN. DRIVE LEVEL TYPIYALRIDING - ALL CONCRETE SHALL BE 3000 PSI IN 28 DAYS. ALL CONIC. W18x35 L1 /2x1 /2x /g SHALL BE PLACED IN ACCORDANCE WITH ACI-318. L1 /22x�1 /2_x / AT1£ACH W16x26 MUCTURAL STEEL PUf IN 4-% DIA. A324N ALL STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH AISC SPECIFICATIONS. W-SHAPES SHALL BE ASTM A992. MISCELLANEOUS STEEL, PLATES, ANGLES, AND CHANNELS ARE W1Sx35 ROOF FRAMING PLAN SCALE: 1/8 1'-0 n a'-n Ox5/t6 ...�.......,., ..,Oxs/16 � FOUNDATION PLAN 2 SCALE: 1/8 = 1'-0 TYP. �_ -- - PAVEMENT - 406.7.2 CANOPIES. CANOPIES UNDER WHICH FUELS ARE DISPENSED SHALL HAVE A CLEAR, UNOBSTRUCTED HEIGHT OF NOT LESS THAN 13 FEET 6 INCHES (4115 MM) TO THE LOWEST PROJECTING ELEMENT IN THE VEHICLE DRIVE -THROUGH AREA. CANOPIES AND THEIR SUPPORTS OVER PUMPS SHALL BE OF NONCOMBUSTIBLE MATERIALS, FIRE -RETARDANT -TREATED WOOD COMPLYING WITH CHAPTER 23, WOOD OF TYPE IV SIZES OR OF CONSTRUCTION PROVIDING 1-HOUR FIR17 RESISTANCE. COMBUSTIBLE MATERIALS USED IN OR I ON A CANOPY SHALL COM PLY WITH ONE OFTHE FOLLOWING: o a 1. SHIELDED FROM THE PUMPS BY A NONCOMBUSTIBLE ELEMENT OF THE CANOPY, OR WOOD OF TYPE IV SIZES; ui 2. PLASTICS COVERED BY ALUMINUM FACING' HAVING A THICKNESS OF NOT LESS THAN 0.010 INCH (0.30 MM) OR CORROSION -RESISTANT STEEL HAVING A BASE METAL THICKNESS OF NOT LESS THAN 0.016 INCH (0.41 MM). THE PLASTIC SHALL HAVE A FLAME SPREAD INDEX OF 25 OR LESS AND A SMOKE DEVELOPED INDEX OF 450 OR LESS WHEN TESTED IN THE FOOTING SCHEDULE MARK DIMENSIONS. LxWxD AT T P Q 80TTOM TOP ANC BO TOM TAP �M REMARKS F5 5'-0x5'-0x5'-0 4 o c E.W 5010o c E,W 6012o c E.W #4, #5, AND #6 OPTIONS ALL STEEL SHOWN IS TO BE PLACED EACH WAY. '!g " px 2x g PROOF OF WELDERS CERTIFICATION SHALL BE AVAILABLE 1 BRIDGING TYP. ON REQUEST. ALL BOLTS SHALL BE IN ACCORDANCE w/ASTM A325. OTHER CONCRETE ITEMS OTHER CONCRETE ITEMS SUCH AS DRIVE THRU SLAB, BUILDING SLAB, PERIMETER FOOTING AND LOAD BEARING FOOTINGS NOT USED FOR THE CANOPY ARE TO BE AT THE SAME ELEVATION UNLESS SHOWN OTHERWISE. IF W18x35 ELEVATIONS ARE TO VARY, CHAPMAN CANOPIES MUST BE INSTRUCTED OF ELEVATIONS IN WRITING WHEN ORDER IS PLACED. SECTION ONON E FOUNDATION NOTE \ W FOOTINGS PROVIDED BY CUSTOMER. CHAPMAN CAN. IS NOT RESPONSIBLE OR LIABLE FOR THE USE OF EXIST. FOOTINGS. NOTE: THIS CANOPY IS DESIGNED PER ASCE 7-16 LOADS STRUCTURE LOADSSEE FIG. 27.3-4, UNBALANCED WIND LOAD A CODE REFERENCE TOP MAT (SEE SCH.) PARAMETER 2017 FLORIDA CODE CASE A 1.20(53.03) 6th EDITION 3O(13.26) (� D LOAD 4.0 PSF 1606.1 #4 EA. CORNER CASE B uv, , vm twin, .w. ,q LIVE LOAD 0.0 ESE (w/APP. REDJ 160 .1 2.1 SNQW MID 1.9 ESF+ T WIND SPEED 159.0 MPH 3 SEC. GUST 49,11 PS 26-29 CATEGORY 11 Iw 1.0 EXP. C V RT. ROOF PRESSURE e A w Cnl Case B C w Cn! ASCE 7 FIG. 27.3-4 * CLEAR WIND FLOW 0 53.0 30 13.26 -1. 0 -48.61 -.10 -4.42 - 14 * PLACE ANCHOR BOLTS NOTES: F 1 PRESSURE EXP. C ON 14 IN, G/C 1. THESE LOADS HAVE BEEN APPLIED TO STRUCTURE Qgse A & 9 Cfz Cfx ASCE 7 FIG. 9.3- IN ACCORDANCE WITH ASCE 7-16 CHAPTER 2 2.4.1 ,D31 GUSSETS EACH BASIC COMBINATIONS FOR ALLOWABLE STRESS.93) 1187(91.92) SIDE OF COLUMNS SEISMIC DATA C 7-1 2. THESE STEEL MEMBERS HAVE BEEN SIZED BASED ON STEEL TUBE w/ 30I ASD, AISC 14th EDITION. SEISMIC DESIGN SE S ECTRUM RESPONSE,Ss 0.0560 FIG. 22.1 BASF F1x18x1'-6 L CATEGORY C U R 0.0 22.2 4-1 / DIA. x 34 A.B 4 TAB. 11.6(1)(2) 11/ " NON -SHRINK GROUT 3. ANALYSIS OF THIS STRUCTURE HAS BEEN ACCOMPLISHED LONG EffiigD RANSITI P ft 71 8 FIG. 2 -14 UNdER BASE P_ USING THE LATEST GENERATION OF MATRIX BASED R (GROUT BY OTHERS) RISK p SOFTWARE. 11 TAB, 1.5-1 S ISMIC F CT R I 1.00 TAB. 1,5- 4. COLUMN SLENDERNESS FACTORS ARE 94SED ON I CHAPTER C, DIRECT ANALYSIS METHOD. TE CO CIE TAB. 11.4-1 I I Kx = 1.0 SITE COEFFICIENT, Fv 2.40 TAB. 1.4- I I Kz = 1.0 SITE CLASSIFICATIOND TAB. .3- SEE PLAN 5, BASES ARE FIXED. SITE ADJUSTMENT COEFFICENT S s 010896 11.4-1 SITEE C EFF T m1 0,0696 . 11.4-2 #4 EACH CORNER DESI S CT RESPONSE, S 0. 8 E. 11.4- 63/ 63/ 3 DESIGN SPECTRAL PO 1 0. 46 E 11. -4 F I��'L.--'TWE/ �ED i TO BEAM FS 1' FORM INTENDED FOR USE IN ACCORDANCE WITH ASTM E84 OR UL 723 AND A SELF -IGNITION TEMPERATURE OF 650-F (343•C) f OR GREATER WHEN TESTED IN ACCORDANCE WITH ASTM D1929; OR SEE PLAN N 3. PANELS CONSTRUCTED OF LIGHT -TRANSMITTING PLASTIC MATERIALS SHALL BE PERMITTED TO BE INSTALLED IN CANOPIES o ERECTED OVER MOTOR VEHICLE FUEL -DISPENSING STATION FUEL DISPENSERS, PROVIDED THE PANELS ARE LOCATED NOT LESS DETAIL C THAN 10 FEET (3048 MM) FROM ANY BUILDING ON THE SAME LOT AND FACE YARDS OR STREETS NOT LESS THAN 40 FEET (12 192 MM) IN WIDTH ON THE OTHER SIDES. THE AGGREGATE AREAS OF PLASTICS SHALL BE NOT GREATER THAN 1,000 SQUARE TYp i W15x26 Ga. = 9/4 FEET (93 M2). THE MAXIMUM AREA OF ANY INDIVIDUAL PANEL SHALL BE NOT GREATER THAN 100 SQUARE FEET (9.JTHE 5/t8�1/4 STIFF I I Fi'ix11x1'-4 406.7,21 CANOPIES USED TO SUPPORT GASEOUS HYDROGEN SYSTEMS. CTRD ON WELDED To COLUMN Digitally ANGLE I ON 4 SIDES CANOPIES THAT ARE USED TO SHELTER DISPENSING OPERATIONS WHERE FLAMMABLE COMPRESSED GASES ARE LOCAT4-1 DIA. A325 BOLTS ROOF OF THE CANOPY SHALL BE IN ACCORDANCE WITH THE FOLLOWING: Signed by i I 2-EACH SIDE Gregor R Hss1oxlox5/16 1. THE CANOPY SHALL MEET OR EXCEED TYPE I CONSTRUCTION REQUIREMENTS. g y Miller 2. OPERATIONS LOCATED UNDER CANOPIES SHALL BE UNITED TO REFUELING ONLY. N0• DATE: 3, THE CANOPY SHALL BE CONSTRUCTED IN A MANNER THAT PREVENTS THE ACCUMULATION OF HYDROGEN GAS, Date' SECTION D A .4/15/2020 2020.05.13 _ 2 .5/12/2020 - 12:49:28 05,00, CARTER MILLER SANSING: DATE: ZRESPONSE MODIFICATION FACTOR, R 3.00 .2 . 12.2-1 i 1 L-� M OD 0 NA YSI - UNA ENT LATERAL ORC V® W 12.8 XBASE SHEAR. Ki 1 _1 PREPARED BY,• CARTER -MI ER-SAN I G P.O,B 4324.MERIDIAN, MS 39304 601-483- 601 U GREGOR CHAPMAN CANOPY, INC. FLLORIDAORIDA(CAA 31480) 201 PATRICIA STREET/P.O. BOX 3527/HUEYTOWN, AL 35023 FL REG. 5033$ PHONE: 1-(205) 491-4845 obflagn000aeooapoo CUSTOMER: BY: 00m0� .,� M.. SPATCO g 0.0503,]> ScuE NOTED WA,WN: o cTE: C STATE ODA F o $ 10IDOp : age' APPROVED BY. Mom LOC3207 AnON: . Q.IALa� o �}t�`� FORT Pit-D+2UCERI�` 27TH ST. •024 DWIFING NG !2/20 CERTIFICATIO 19317-014