HomeMy WebLinkAboutCreekside Lot 21 Code 140 021822.pdfL
VUA Universal
Engineering
Sciences
Company
'``RNATION
INSPECTION RESULTS
Inspection Date: A � 1-2[;z
Project: Z25AZ-2
Address: 3 `) 5 Z G) (.
Check one:
L Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
Permit No.
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: (-'<.. Lic.#:
c3.=:,
OFFICES THROUGHOUT FLORIDA
N ommo ve, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com