HomeMy WebLinkAboutDMF Construction feeDMF CONSTRUCTION INC
N, Stack 1
a— Oceanrise Condo-'
ITEM DESCRIPTION
Unit
Measur.
Unit Price
Total
Permit fees (lump sum)
EA
S 2,500.00
3 2,500.00
Mobilization (lump sum)S LOB Each Swing Stage per month/ Installation 6 uninstell 12,009.00
5.000.00
$ 5,000.00
Storage for Shuttlers and SOD
EA
S 1,590.D0
8 1.500.00
Dumpster 31.309.00 each
EA
$ 1.390.091
3 2.600110
flnnr_rRt RRnnirs
I. Edge Repairs for full depth(+/-12 inches width)**
tF
150
S 110.00
$ ROAD
2. Half Deck repairs ( +/- 3 inches depth) (surface of deck)
SF
350
S 75.00
S 26,250.00
Mobilization for missileniuns stuff, container and portable Toiled S 5,000.09
3. Full Depth repairs
SF
80
S 80.09
S WHO
** Items 2 and 3 ABOVE will he utilized to determine cost for Item 1
(measurements greater than 12 inches wide)
4. #5 Steel dowel up to 12 inches in length epoxied into existing concrete.
EA
70
S 59.00
S 3,500.00
5. Reinforcement; # 3 bars MMFX
LF
0
S 1.90
S
B. Reinforcement: # 4 bars MMFX
LF
0
S 1.25
$ -
7. Reinforcement #5 bars MMFX
LF
2500
S 1.60
S 4,900,90
8. Reinforcement #6 bars MMFX
LF
0
$ 2.80
S -
9. Reinforcement #7 bars MMFX
LF
0
S 3.90
S -
10. Ceiling Spoils .
SF
13
$ 85.00
$ 1,105.00
11. Beam Spalls K x F x 6")
LF
0
$ 100.00
$ -
12. Column Spalls K x 6" x 6")
Cu
10
$ 280.00
$ 2.800.00
13. Stucco Repairs (< to 5/8")
SF
1,586
$ 10.00
S 16,800.00
r-
n
0
r
+®' m
m
3 o
14. Shutter Removal (by others)
LF
96
S 18.99
$ 1,728.00
ITEM DESCRIPTION
Unit
Measur.
Unit Price
Toth!
15. Shutters Reinstall (by others)
LF
96
S 18.90
S 1,728.90
10. Door Frame Removal 9 reinstall
LF
72
$ 60.00
S 4,321.DD
17. Door Frame bottom track replc.
LF
0
$ 15.00
S -
ft Tile removal
SF
810
$ 1.50
S 1,215.00
19, Rust Spots
EA
29
S 30.00
S 870.00
20. Wall crevcks
LF
0
$ 5D0
it
S -
21. Guardrail Post Pocket re airs
EA
0
S 35.00
. $ -
22. Interior Dust Wall Inst 6 Removal
LF
128
40.00
S 5,120:00
23. Guardrail removal
LF
72
9 10.00
S 720.00
24. Guardrail Reinstallation
LF
72
S 15.00
S 1,080.00
25. Guardrail Replacement
LF
0
S 85.00
S -
26. Concrete Beam repair
Cu
0
S 260.00
$ -
27. Concrete column.Repair
Cu
0
S 2G0.00
S -
28. Grinding Decks
BID
$ 1.50
S 1,215.00
29, Balcony Screen or glass enclosure removal and reinstallation
LF
0
S 25.00
S -
30. Drip Edge Installation
LF
60
$ 1.59
S 90.09
31. Window and frame removal and reinstall
LF
0
S 45.00
S -
32. Window Replacement and Door Replacement (BY OTHERS)
LF
0-
33. RES. Exterior
SF
0
S 20.00
S -
34. Temporary window 9 moisture barriers for openings to meet
EA
0
S 24.00
S -
current 2610 FOC codes (for hurricane protection)
35. Cathodic Protection
EA
0
S 40.DD
$ -
w
W
a
PAINT
Paint repair areas including the balcony's ceiling and afl walls once concrete repairs are done.
SF
0
S 7 4.20
3 '
Waterprnnfing
SF
BID
% 4.50
S 3,645.0
Wall spells 1
260.00
t
Deck Crack LF 0
20.09
$
The quantities can change bese on engenier request
1- Contractor to provide his own power source or verify that existing power supply & location is adequate for work.
w 2-All work to be performed by exterior access
a 3- Scaffolding where required to be provided by contractor. 4- All work per O.S.H.A.
5- All new steel to be MMFX, Grade 100 steel (minimum)
6- Contractor to supply material specifications that willbe used in the concrete restoration if different from those specified,
Wong with their product approvals.
Steel corrosion inhibitor if not in bondingagent.
• Bonding Agent
* Concrete patch materials for overhead and shallow deckrepairs
* Concrete material used for full depth & edge repairs
01
m
I
M
n
M
:V
y
9
a
-a
* Column concrete patch material
* Deck coating manufacturer
Luciano Diaz
DMF Construction Inc.
General Contractor Lic. # CGGC1524718
Oceanri ondorqfnum n^
Signature: D.
Name: Mnht r � Title: �5 f✓
Thank you for your business) I
m
w
�