HomeMy WebLinkAboutBuilding Plana
GENERAL NOTES
All work shall comply with the strictest requirements of the State of Florida Building
Code and all applicable codes whether specifically stated or not.
All work Shall conform with the strictest interpretation of State and Local codes,
laws, rules and regulations of all authorities having jurisdiction over the project,
whether specifically shown, or not.
Where the contract, construction notes or drawings call for any work of a more
stringent nature than that required by code or any other department having
jurisdiction over the work, the work of the more stringent nature called for by the
contract, construction notes or drawings shall be furnished.
The Contractor shall vist the site prior to submitting a bid. The Contractor will be
responsible for the verification of all dimensions and conditions. All discrepancies
shall be brought to the attention of the Architect before proceeding.
All drawings and notes are complimentary, and what is called for by either will be
binding as if called for by all. Any work shown or referred to on any one set of
drawings shall be provided as though shown on all related drawings.
The drawings are not to be scaled at any time. Only written dimensions and notes
are to be used. All dimensions are given to finishes_ All dimensional discrepancies
shall be immediately brought to the attention of the Architect. All dimensions shall
be verified before starting work by the respective Contractor, who shall be held
responsible for his phase of the work.
All "Plus -Minus" dimensions are provided in situations where existing conditions
exist. Such dimensions shall be verified in the field by the Contractor.
All work listed on the construction notes sheets and shown or implied on all
drawings shall be supplied and installed by the Contractor, unless otherwise noted.
The Contractor shall notify the Architect in writing immediately if he cannot comply
with all notes contained within the Contract Documents.
The Contractor shall notify the Architect in writing immediately of any discrepancies
between the drawings, the notes and field conditions before commencing any work
to request clarification.
The Contractor shall be responsible for all damage to existing property as a result
of his work, his workmanship and subcontractors. The Contractor shall provide
adequate protection for his work, and shall be responsible for the same. The
Contractor shall restore to original condition and existing element damaged as a
result of his work.
Where a product is specified by a particular manufacturer, the Contractor shall
furnish and install the product in accordance with the strictest specifications set
forth by the manufacturers best standards.
The General Conditions of the contract for construction of Buildings, the Standard
form of the American Institute of Architects (AIA), latest edition of Form A-201,
inclusive as it pertains to this project, are part of these Contract Documents.
Work included in this conroct shall be all labor, material and equipment required to
complete the proposed construction as shown or inplied in the Contract Documents.
Work included in this contract shall be according to the true intent of these
drawings and shall be first class in all respects.
The Contractor is responsible for dimensions to be confirmed and correlated at the
job site and for information that pertains to the fabrication process, and/or to
techniques for construction and coordination of the work of all trades.
The Architect shall be the sole judge as to the adequacy of any work performed.
The Architect shall have the right to order the removal of defective work and
material, and its replacement without any additional cost to the Owner.
All work to comply with governing State and Local Building Codes.
All plumbing to comply with governing State and Local Plumbing Codes.
All Electrical work to comply with governing National and Local Electrical Codes.
The Contractor shall assume full responsibility for the confirmation of actual field
dimensions as they pertain to the fabrication and installation of any materials
and/or equipment requiring such.
The General Contractor shall exceroise strict control over job cleaning to prevent
any debris, dust or dirt from leaving the job site and adjacent finished areas.
The Contractor shall properly protect all adjoining property or work or work and
any damage to the some caused by his work or workmen must be made good
without delay. Patching and and replacing or damaged work shall be done by the
Contractor who is responsible for the damage.
The Contractor shall provide all necessary protection for his work until it is turned
over to the Owner.
The Construction Drawings and/or notes are supplied to illustrate the design and
general type of construction desired and are intended to imply the finest quality
construction materials and craftsmanship throughout.
The Contractor, upon acceptance of these drawings, assumes full responsibility for
the construction, materials and workmanship of the of the work described in these
notes and drawings, and he will be expected to comply woth the spirit, as well as
with the letter in which they were written and drawn.
Controlled tests required by those having jurisdiction over the project shall be
executed and paid for by the Contractor.
Patching and Cutting:
The General Contractor shall survey all existing finished surfaces to include
comer beads, stops, existing construction to remain, etc. for chips, cracks,
holes, damaged surfaces and any other surfaces and defects causing an
appearance different from a new finished first-class installation. These
defective surfaces shall be repaired, or if beyond repairing, then the General
Contractor shall remove existing and install new surfaces to the satisfaction
of the Architect.
Construction:
All wood framing members shall be select structural grade Douglas Fir in
accordance with the latest edition of A.I.T.C. Design specifications for stress grade
lumber. Minimum E-1,4000,000; f-1400.
All landings to be in accordance with RCNYS R311.5.4 for stairways and R311.4.3
for exterior doors.
Unless otherwise specified in these documents, all openings in wall shall receive
(2)2x12 wood headers. This includes, but is not limited to, all doors and
windows.
All walls and ceilings shall receive 1/2" thick, tapered edge gypsum wall board,
except Bathrooms, which shall receive 1/2" thick moisture resistant wall board
and/or 1/2" thick 'Wonderboard", in accordance with finishes selected by the
Owner. Such variations shall be coordinated by the Contractor with the Owner.
All interior surfaces shall be taped three (3) times and sanded smooth for
paint.
All windows, doors and transition spaces (i.e. openings without doors) shall
recieve a point grade colonial wood trim as selected by the Owner, and
approved by the Architect.
All interior walls and ceilings shall receive 1 coat of latex primer and two
coats of latex flat finish house paint. Colors as selected by the Owner.
Paint as manufactured by "Benjamin Moore", or approved equal.
All interior wood trim shall receive 1 coat of latex primer and 2 coats of latex
semi -gloss flat finish trim paint. Colors as selected by the Owner. Paint as
manufactured by 'Benjamin Moore", or approved equal.
All exterior wood shall be painted. All surfaces shall receive 1 coot of exterior
oil primer, and 2 coots of exterior oil house or trim paint. All surfaces shall
receive o "White finish. Paint as manufactured by 'Benjamin Moore', or
approved equal.
All existing exterior wood trim shall be painted. All surfaces shall receive 1
coat of exterior oil primer, and 2 coats of exterior oil house or trim paint.
All surfaces shall receive a 'White" finish. Paint as manufactured by 'Benjamin
Moore", or approved equal.
New asphalt roofing to shall match the existing in color in size. Contractor to
summit sample to the Owner for they appoval.
Insulation as manufactured by Owens Corning. Thickness as specified in
drawings.
Unless otherwise noted, all dimensions for partitions are from finish
material -to -finish material.
All flashing shall be aluminum or copper, unless specified otherwise.
Asbestos Removal:
The Architect shall not be responsible for the uncovering of, or identification
thereof, any asbestos, asbestos -related materials, lead, lead -paints or any other
pollutants of any kind. The Architect is not responsible for the perforamance of
any services in connection with or related to such materials, and the Contractor
Shall retain an expert(s) to arrange for the prompt identification of, and the
removal or treatment of such potentionally harmful materials, and indemnify and
hold the Architect and its consultants harmless from any claims, injuries or
expenses incurred by Architect in any manner related to the existance of such
materials on the project.
Firest000ina
Firestopping consisting of 2" lumber, minimum 23/32" structural panel or
approved non-combustible materials shall be provided at the ceiling line in
concealed spaces of stud walls/partitions, including furred or studded -off spaces
of concrete foundation walls and at soffits, dropped ceilings and similar spaces.
CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA
GROUND
WIND DESIGN
I SEISMIC
SUBJECT TO DAMAGE FROM
WINTER
ICE SHIELD
FLOOD
SNOW
DESIGN
CATEGORY
DESIGN
TEMP
UNDERLAYMENT
REQUIRED
HAZARD!
WIND
TOPOGRAPH.
SPECIAL
IND-BORNE
WEATHERING
FROST LINE
TERMITE
DECAY
LOAD
SPEED
EFFECTS
WIND REG.
DEB. ZONE
DEPTH
N/A
160
N/A
NEGLIGIBLE
N/A
VERY
---
N/A
N/A
--
HEAVY
CODE INFORMATION -------------------
lYPE
APPLICABLE CODES
ARCHITECTURAL
2017 FLORIDA BUILDING CODE
ENERGY
2015 ENERGY CONSERVATION CONSTRUCTION CODE
CATEGORY
REQUIREMENT
REFERENCE
CLASSIFICATION OF WORK
ALTERATION - LEVEL 2
ADDITION
SECTION AJ304
SECTION AJ306
OCCUPANCY CLASSIFICATION
GROUP R2 - APARTMENT
SECTION 310
CONSTRUCTION CLASS.
1YPE 5B -WOOD FRAME
SECTION 601
DESIGN FLOOR LOADS
ROOF 40 LOS LIVE LOAD
DESIGN
PRESSURE
ROOF
ZONE 1- 38.2
ZONE 2- 53.9
ZONE 3- 101
DOOR
ZONE 4- 47.9
ZONE 5- 57.5
PRODUCT CODE: FL1654-R26
S
I
SYSTEM j W-207
I
ALL BEYOND
PATCH EIFS
AS REQ.
I
FLASHING 0 ROOF
APPROXIMATE SAW -CUT
I
WALL INTERSECRON
LINE OF EXISTING BPS.
POLYFLEX PEEL & STICK
I PATCH AS REQUIRED
TAPERED INSULATION
SLOPE 1/4" PER FOOT
FLASHING
I
EIFS ON WIRE LATH ON
DENSGLASS ATTACHED _
2x8 R.R.
EPLACED AND/OR
TO RT. WD. FURRNG
REPAIRED
REQ.
ON WIRE LATH ON
X y
VITS
NSGLASS ATTACHED
ITO PT. WD. FURRING
HURRICANE CUPS AS
I
REQ. SEE CHART FOR
PRE
-MANUFACTURED
FASTENING REQ.
TR
SS BY KOST TRUSS,
("'P)
GALVANIZED STWWPING
I ' OSB MR SHEATHING
TRUSS
SIMPSON JCMST14ATTACH
AND AR�CHTO
TTtAMING
(2 EACH COLUMN)
I
w/3' CONCRETE SCREWS
c c
O
I
2' x 4' WOOD - ----
_ ___�
-
FRAMED 0 16' O.C. _ ..._
� _... _... ,_ � ,.
O
2 2'z4' BLOCKING
IX. COLUMN CAPR
ATTACH TO WALL
TO REMAIN
x 5-1/2' HILTI
UNE OF ARCHED
EIFS ON WIRE LATH ON
ANCHORS
OPENING
DENSGLASS ATTACHED
FLA
ODEIAILr
(CONCRETE
SOFFIT VENT
SEE ARC
TO PT. WD. FURRING
LINE OF COLUMN
J
BEYOND
— _ — — — —
/// LINE OF EXTERIOR
[ WALL
2 )OVERHANG DETAIL
1 J SCALE: 1/1"="-O'
WALL BEYOND/
m
m
�
®
s
i
u
u
0
0
0
O
H70
0
H25A
'.sew Sex elOw.eet es sa to rm rwrnawa
tx t tawxe wet m
sweat teoeteE xu�.
2 w10w9E 1�10x NE NI aE l/lalal A IwfeY RIi1eR
x10eF5x 6 Y tn' Mer
ff I WI Nxx016 ew exastm pt FMI Sff (i 11E Jo6T ele at xE SA1E
F
aanErue
N.
SIMPSON STRONG -TIE, SEISMIC/ HURRICANE TIES
Yooa �
�
rumme
�T a� M.
ssllsAs ni uvw es
xtawea °�
uxrr xors wm
w .1tR ttNs
Uss • toD1
awls twe m xuw�sx tasty
Istsr xsrs wiz
. t tR xtxs
WA
tla •wet
tear
unrirr
uxts¢
to rvtvs ites
m taws
to rnles
h
rx
n
r:
lay,
to
s-eu
sae
-
ttu
ON
ea ns
no
+eo
wo
sxf
no
no
4e0
mo
to
1112
eat . t tR
-
ma
tm
ees ees
ets
-
tea
eeo
m
tea
-
REPAIR EIFS
ON WALL A5 REQ.
NOTE:
SHOP/DESIGN DRAWINGS BY T. STILES PEEP, PE IS AN
INTEGRAL PART OF THESE PLANS
TOP CHORDS: 20 SP f2
BOTTOM CHORDS: 20 SP 12
WEBS 20 SP 13
TRUSSES
TO BE INSTALLED TOP CHORD UP
PATCH EIFS
AS REQ.
FLASHING 0 ROOF
WALL INffRSECffON�
POLYFLIX PEEL g STICK
ROOF INSTALLED PER
MANUFACTURER
TAPERED INSULATION
SLOPE 1/4' PER FOOT
FLASHING
EIFS ON WIRE LATH ON I
DENSGLASS ATTACHED
TO PT. WD. FURRING
GALVANIZED
SNtAPPINaG
SIMPSON #CMST14 I
(2 EACH COLUMN) I
w/3• CONCRETE SCREWS �
PRODUCT CODE: FL1654-R26
SYSTEM J W-207
TRUSS SUPPORT
AREA OF WO
SCALE: N.T.S
FACE OF ARCH. _
(ATTACHED TO TRU
EIFS ON EXPOSED
1CD
3
REPLACE W/SAME
ti
AN
EIFS FINISH ON LU
00
ARCHED OPENING ABOVE
- � � TRUSS HEADER TO BE
w REMOVED AND REPLACED
LINE OF EX.
OVERHANG PROPOSED FLOOR PLAN
EXISTING 16" 1 SCALE: 3/4•=1'-0'
CONCRETE COLUMN
+Cf� fi1651-R28
� TRUSS BY T. STILES PER PE.
SEE SHOP CUTS
I
EIFS ON WIRE LATH ON
DENSGLASS ATTACHED
TO PT. WD. FURRING
20 WOOD FRAMED I
ARCH WITH }' OSB MR �
SHEATHING
IX15T. COLUMN
CAPITAL TO REMAIN
4 SECTION
SCALE: 1/2'=1'-0'
J.,... ...tt
U.
a
Z
�
Ci
LIJ
cv £
W
rUJI y
� 11
�.J
W
C
J
CC
J
� w
z
JLL
C_
Z
F
O
❑
0
0
�
G
Of
LL
u
Z �
W 0 Z
o I
2Gi7$-OSSS J�UQ�
COUNTY OF ST LUCIE V
PERMIT NUMBER: 2005-0558