Loading...
HomeMy WebLinkAboutEnvironmental ProtectionFLORIDA DEPARTMENT OF Environmental Protection Southeast District Office, 3301 Gun Club Road, MSC 7210-1 West Palm Beach, FL 33406 561-681-6600 November 2, 2021 Nettles Island Outdoor Resorts c/o Rick Grillo 9801 S Ocean Drive Jensen Beach, FL 34957 Sent via e-mail: manag_er(&,,nettlesislandcondo.com Re: File No.: 56-0124866-021,022-EE File Name: Nettles Island Outdoor Resorts Dear Mr. Grillo: Ron DeSands Governor Jeanette Nunez Lt. Governor Shawn Hamilton Secretary 0�3(,7 MIN. SETBACK RED! FRONT _ SIDES CNR SIDES REAR ZNG. TECH. n On September 22, 2021, we received your request for verification of exemption to perform the following activities: 1) install approximately 700 linear ft. of seawall within 18 inches waterward (wetface to wetface) of the existing seawall; and 2) install king piles and approximately 700 linear ft. of new seawall cap overpour. The project is located in the Indian River, Class II Waters, adjacent to 9801 S Ocean Drive, Jensen Beach (Section 2, Township 37 South, Range 41 East), in Saint Lucie County (Latitude N 27' 17' 5.9136", Longitude W -80' 13' 33.528"). Your request has been reviewed to determine whether it qualifies for (1) regulatory exemption, (2) proprietary authorization (related to state-owned submerged lands), and (3) federal approval that may be necessary for work in wetlands or waters of the United States. Your project qualifies for all three. However, this letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. If you change the project from what you submitted, the authorization(s) granted may no longer be valid at the time of commencement of the project. Please contact us prior to beginning your project if you wish to make any changes. If you have any questions regarding this matter, please contact John Tracey at the letterhead address or at 561-681-6717, John.Tracey(a,FloridaDEP.gov. . www.&6612dep.4ov Project No.: 56-0124866-021,022-EE Project Name: Seawall Replace S Grand Canal Page 2 of 5 1. Regulatory Review — VERIFIED Based on the information submitted, the Department has verified that the activities as proposed are exempt, under Chapter 62-330.051(12)(b) and (12)(d), Florida Administrative Code, from the need to obtain a regulatory permit under Part IV of Chapter 373 of the Florida Statutes. This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification may not be valid if site conditions materially change, the project design is modified, or the statutes or rules governing the exempt activity are amended. In the event you need to re -verify the exempt status for the activity, a new request and verification fee will be required. Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required. 2. Proprietary Review- NOT REQUIRED The activity does not require further authorization under chapter 253 of the Florida Statutes, or chapters 18-20 or 18-21 of the Florida Administrative Code. 3. Federal Review - APPROVED Your proposed activity as outlined in your application and attached drawings qualifies for Federal authorization pursuant to the State Programmatic General Permit VI, and a SEPARATE permit or authorization will not be required from the Corps. Please note that the Federal authorization expires on July 27, 2026. However, your authorization may remain in effect for up to 1 additional year, if provisions of Special Condition 15 of the SPGP VI permit instrument are met. You, as permittee, are required to adhere to all General Conditions and Special Conditions that may apply to your project. Special conditions required for your project are attached. A copy of the SPGP VI with all terms and conditions and the General Conditions may be found online in the Jacksonville District Regulatory Division Sourcebook: (bgs://www.sgLj.usace.g,M.mil/Missions/RegulatoDL/S6urce-Boo Authority for review - an agreement with the USACOE entitled "Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit", Section 10 of the Rivers and Harbor Act of 1899,' and Section 404 of the Clean Water Act. Additional Information Please retain this letter. The activities may be inspected by authorized state personnel in the future to ensure compliance with appropriate statutes and administrative codes. If the activities are not in compliance, you may be subject to penalties under Chapter 373, F.S., and Chapter 18- 14, F.A.C. NOTICE OF RIGHTS This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., Project No.: 56-0124866-021,022-EE Project Name: Seawall Replace S Grand Canal Page 3 of 5 before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until further order of the Department. Because the administrative hearing process is designed to formulate final agency action, the hearing process may result in a modification of the agency action or even denial of the application. Petition for Administrative Hearing A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules 28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information: (a) The name and address of each agency affected and each agency's file or identification number, if known; (b) The name, address, any e-mail address, any facsimile number, and telephone number of the petitioner, if the petitioner is not represented by an attorney or a .qualified representative; the name, address, and telephone number of the petitioner's representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner's substantial interests will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate; (e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and (g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency's proposed action. The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing. Time Period for Filing a Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever -occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant Rule 62- 110.106(10)(a). Project No.: 56-0124866-021,022-EE Project Name: Seawall Replace S Grand Canal Page 4 of 5 The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another parry) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action. Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the Department's action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399- 3000, or via electronic correspondence at Agency_Clerk@dep.state.fl.us, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Mediation Mediation is not available in this proceeding. FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when this order is filed with the Clerk of the Department. Judicial Review Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Florida Rules of Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department. Project No.: 56-0124866-021,022-EE Project Name: Seawall Replace S Grand Canal Page 5 of 5 EXECUTION AND CLERKING Executed in West Palm Beach, Florida. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Danielle C. Sattelberger Environmental Manager Southeast District Enclosures: Attachment A: Specific Exemption Rule(s) Special Conditions for Federal Authorization for SPGP VI-R1 General Conditions for Federal Authorization for SPGP VI-Rl Project drawings, 31 pages CERTIFICATE OF SERVICE The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons: FDEP — Danielle Sattelberger, John Tracey U.S. Army Corps of Engineers, spgp(a),usace.army.mil Jeffrey Anton, antonpeaa,comcast.net FILING AND ACKNOWLEDGMENT FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged. Clerk November 2, 2021 Date Attachment A 62-330.051 Exempt Activities. The activities meeting the limitations and restrictions below are exempt from permitting. However, if located in, on, or over state-owned submerged lands, they are subject to a separate authorization under chapters 253 and 258, F.S., as applicable. (12) Construction, Replacement, Restoration, Enhancement, and Repair of Seawall, Riprap, and Other Shoreline Stabilization — (b) The restoration of a seawall or riprap under section 403.813(1)(e), F.S., where: 1. The seawall or riprap has been damaged or destroyed within the last year by a discrete event, such as a storm, flood, accident, or fire or where the seawall or riprap restoration or repair involves only minimal backfilling to level the land directly associated with the restoration or repair and does not involve land reclamation as the primary project purpose. See section 3.2.4 of Volume I for factors used to determine qualification under this provision; 2. Restoration shall be no more than 18 inches waterward of its previous location, as measured from the waterward face of the existing seawall to the face of the restored seawall, or from the waterward slope of the existing riprap to the waterward slope of the restored riprap; and 3. Applicable permits under chapter 161, F.S., are obtained. (d) Installation of batter piles, king piles, or a seawall cap, used exclusively to stabilize and repair seawalls, provided they do not impede navigation. Special Conditions for Federal Authorizations for SPGP VI-R1 1. Authorization, design and construction must adhere to the terms of the SPGP VI instrument including the General Conditions for All Projects, Special Conditions for All Projects, Applicable activity -specific special conditions, Procedure and Work Authorized sections. 2. Design and construction must adhere to the PDCs for In -Water Activities (Attachment 28, from PDCs AP.7 through AP11, inclusive, of JAXBO) (Reference: JAXBO PDC AP.1.). 3. All activities must be performed during daylight hours (Reference: JAXBO PDC AP.6.). 4. For all projects involving the installation of piles, sheet piles, concrete slab walls or boatlift I -beams (Reference Categories A, B and C of JAXBO PDCs for In -Water Noise from Pile and Sheet Pile Installation, page 86): a. Construction methods limited to trench and fill, pilot hole (auger or drop punch), jetting, vibratory, and impact hammer (however, impact hammer limited to installing no more than 5 per day). b. Material limited to wood piles with a 14-inch diameter or less, concrete piles with a 24-inch diameter/width or less, metal pipe piles with a 36-inch diameter or less, metal boatlift I -beams, concrete slab walls, vinyl sheet piles, and metal sheet piles. c. Any installation of metal pipe or metal sheet pile by impact hammer is not authorized (Reference: Categories D and E of JAXBO PDCs for In -Water Noise from Pile and Sheet Pile Installation, page 86.). d. Projects within the boundary of the NOAA Florida Keys National Marine Sanctuary require prior approval from the Sanctuary (Reference: JAXBO PDCs AP.14 and A1.6). 5. The Permittee shall comply with the "Standard Manatee Conditions for In -Water Work — 2011" (Attachment 29). 6. No structure or work shall adversely affect or disturb properties listed in the National Register of Historic Places or those eligible for inclusion in the National Register. Prior to the start of work, the Applicant/Permittee or other party on the Applicant's/Permittee's behalf, shall conduct a search of known historical properties by contracting a professional archaeologist, and contacting the Florida Master Site File at 850-245-6440 or SiteFile@dos.state.fl.us. The Applicant/Permittee can also research sites in the National Register Information System (KRIS). Information can be found at http://www.cr.nps.gov/nr/research. a. If, during the initial ground disturbing activities and construction work, there are archaeological/cultural materials unearthed (which. shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work in the vicinity and notify the Compliance and Review staff of the State Historic Preservation Office at 850-245- 6333 and the Corps Regulatory Archeologist at 904-232-3270 to assess the significance of the discovery and devise appropriate actions, including salvage operations. Based on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend, or revoke the permit in accordance with 33 C.F.R. § 325.7. b. In the unlikely event that human remains are identified, the remains will be treated in accordance with Section 872.05, Florida Statutes; all work in the vicinity shall immediately cease and the local law authority, and the State Archaeologist (850-245- 6444) and the Corps Regulatory Archeologist at 904-232-3270 shall immediately be notified. Such activity shall not resume unless specifically authorized by the State Archaeologist and the Corps. 7. The Permittee is responsible for obtaining any "take" permits required under the U.S. Fish and Wildlife Service's regulations governing compliance with these laws. The Permittee should contact the appropriate local office of the U.S. Fish and Wildlife Service to determine if such "take" permits are required for a particular activity. 8. Mangroves. The design and construction of a Project must comply with the following (Reference: JAXBO PDCs AP.3 and AP.12.): a. All projects must be sited and designed to avoid or minimize impacts to mangroves. b. Mangrove removal must be conducted in a manner that avoids any unnecessary removal and is limited to the following instances: (1) Removal to install up to a 4-ft-wide walkway for a dock. (2) Removal of mangroves above the mean high water line (MHWL) provided that the tree does not have any prop roots that extend into the water below the MHWL. (3) Mangrove trimming. Mangrove trimming refers to the removal (using hand equipment such as chain saws and/or machetes) of lateral branches (i.e., no alteration of the trunk of the tree) in a manner thatensures survival of the tree. (a) Projects with associated mangrove trimming waterward of the MHWL are authorized if the trimming: (a) occurs within the area where the authorized structures are placed or will be placed (i.e., removal of branches that overhang a dock or lift), (b) is necessary to provide temporary construction access, and (c) is conducted in a manner that avoids any unnecessary trimming. (b) Projects proposing to remove red mangrove prop roots waterward of the MHWL are not authorized, except for removal to install the dock walkways as described above. 9. For Projects authorized under this SPGP VI in navigable waters of the U.S., the Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 10. Notifications to the Corps. For all authorizations under this SPGP VI, including Self - Certifications, the Permittee shall provide the following notifications to the Corps: a. Commencement Notification. Within 10 days from the date of initiating the work authorized by this permit the Permittee shall submit a completed "Commencement Notification" form (Attachment 8). b. Corps Self -Certification Statement of Compliance form. Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the "Self -Certification Statement of Compliance" form (Attachment 9) and submit it to the Corps. In the event that the completed work deviates in any manner from the authorized work, the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the "Self -Certification Statement of Compliance" form. The description of any deviations on the "Self- Certification Statement of Compliance" form does not constitute approval of any deviations by the Corps. c. Permit Transfer. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form (Attachment 10). d. Reporting Address. The Permittee shall submit all reports, notifications, documentation, and correspondence required by the general and special conditions of this permit to the following address. (1) For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL, 32232-0019. (2) For electronic mail: SAJ-RD-Enforcement@usace.army.mil (not to exceed 10 MB). The Permittee shall reference this permit number, SAJ-2015-2575 on all submittals. 11. The District Engineer reserves the right to require that any request for authorization under this SPGP VI be evaluated as an Individual Permit. Conformance with the terms, and conditions of the SPGP VI does not automatically guarantee Federal authorization. 12.On a case -by -case basis, the Corps may impose additional Special Conditions which are deemed necessary to minimize adverse environmental impacts. 13. Failure to comply with all conditions of the SPGP VI constitutes a violation of the Federal authorization. 14. The SPGP VI will be valid through the expiration date unless suspended or revoked by issuance of a public notice by the District Engineer. The Corps, in conjunction with the Federal resource agencies, will conduct periodic reviews to ensure that continuation of the permit during the period ending expiration date, is not contrary to the public interest. The SPGP VI will not be extended beyond the expiration date but may be replaced by a new SPGP. If revocation occurs, all future applications for activities covered by the SPGP VI will be evaluated by the Corps. 15. If the SPGP VI expires, is revoked, or is terminated prior to completion of the authorized work, authorization of activities which have commenced or are under contract to commence in reliance upon the SPGP VI will remain in effect provided the activity is completed within 12 months of the date the SPGP VI expired or was revoked. Special Conditions for Shoreline Stabilization activities. 16. Shoreline stabilization structures other than vertical seawalls shall be no steeper than a 2 horizontal:I vertical slope (Reference: JAXBO PDC Al.1.4.). 17. Placement of backfill is limited to those situations where it is necessary to level the land behind seawalls or riprap. 18. Living shoreline structures and permanent wave attenuation structures can only be constructed out of the following materials: oyster breakwaters, clean limestone boulders or stone (sometimes contained in metal baskets or cages to contain the material), small mangrove islands, biologs, coir, rock sills, and pre -fabricated structures made of concrete and rebar that are designed in a manner so that they do not trap sea turtles, smalltooth .sawfish, or sturgeon (Reference: JAXBO PDC A7.5.). a. Reef balls or similar structures are authorized if they are not open on the bottom, are open -bottom structures with a top opening of at least 4 ft, or are pre -fabricated structures, such as reef discs stacked on a pile, and are designed in a manner that would not entrap sea turtles. b. Oyster reef materials shall be placed and constructed in a manner that ensures that materials will remain stable and that prevents movement of materials to surrounding areas (e.g., oysters will be contained in bags or attached to mats and loose cultch must be surrounded by contained or bagged oysters or another stabilizing feature) (Reference: JAXBO PDC A7.2.). c. Oyster reef materials shall be placed in designated locations only (i.e., the materials shall not be indiscriminately dumped or allowed to spread outside of the reef structure) (Reference: JAXBO PDC A7.3.) d. Wave attenuation structures must have 5 ft gaps at least every 75 ft in length as measured parallel to the shoreline and at the sea floor, to allow for tidal flushing and species movement (Reference: JAXBO PDC A7.6.). e. Other materials are not authorized by this SPGP VI (Reference: JAXBO PDC A7.5.). General Conditions for All Projects: 1. The time limit for completing the work authorized ends on July 27,2026. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner on the enclosed form (Attachment 10) and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted projector uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by oron behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or Construction deficiencies associated with the permittedwork. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form. 7. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation or alteration. Department of the Army Permit Transfer for SPGP VI-R1 PERMITEE: PERMIT NUMBER: ADDRESS/LOCATION OF PROJECT: DATE: (Subdivision) (Lot) (Block) When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire. To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Branch, Post Office Box 4970, Jacksonville, FL 32232-0019. (Transferee Signature) (Date) (Name Printed) (Street address) (Mailing address) (City, State, Zip Code) STANDARD MANATEE CONDITIONS FOR IN -WATER WORK 2011 The permittee shall comply with the following conditions intended to protect manatees from direct project effects: a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act. b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. d. All on -site project personnel are responsible for observing water -related activities for the presence of manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving. e. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772- 562-3909) for south Florida, and to FWC at ImperiledSpeciesAmyFWC.com f. Temporary signs concerning manatees shall be posted prior to and during all in -water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used (see MyFWC.com/manatee). One sign which reads Caution: Boaters must be posted. A second sign measuring at least 81/2" by I I" explaining the requirements for "Idle Speed/No Wake" and the shut down of in -water operations must be posted in a location prominently visible to all personnel engaged in water -related activities. Questions concerning these signs can be sent to the email address listed above. CAUTION: MANATEE HABITAT All project vessels IDLE SPEED/NO WAKE When a manatee is within 50 feet of work all in -water activities must SHUT DOWN Report any collision with or injury to a manatee: . ,.,�__ µ. Wildlife Alert: i�' . 1-888-404-FWCC (3922) cell * FWC or #FWC ,ENT OF UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701 SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS The permittee shall comply with the following protected species construction conditions: a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water -related activities for the presence of these species. b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg, Florida. d. All vessels associated with the construction project shall operate at "no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will preferentially follow deep -water routes (e.g., marked channels) whenever possible. e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation. h. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (727-824-5312). i. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takereport.nmfsser(a�noaa. gov. j. Sea turtle and marine stranding/rescue organizations' contact information is available by region at httv://www.nmfs.noaa.goy/i)r/health/networks.htm. k. Smalltooth sawfish encounters shall be reported to http://www. flmnh.ufl. edu/fish/sharks/sawfish/sawfishencounters.html. 1. All work must occur during daylight hours. SCOPE OF WORK NEW COMPOSITE SEAWALL 1. MOBILIZE 2. DEMO EXISTING DOCKS BY OWNER — CSM TO COORDINATE 3. CUT 6' OFF EXISTING CONCRETE CAP 4. DRIVE NEW SEAWALL PANEL SYSTEM 5. INSTALL NEW KING PILE & WALE SYSTEM 6. CUT/REMOVE EXISTING CONCRETE CAP AND DISCARD 7. INSTALL 157 STONE INFILL BETWEEN SEAWALLS 8, FORM AND POUR NEW CAP 9. REPAIR LANDSCAPING 10. DEMOBILIZE 11. RECONSTRUCT/REPAIR DOCKS BY OWNER — CSM TO COORDINATE CONiRACfOR SHALL BE RESPONSIBLE FOR HURRICANE PREPAREDNESS WEIGHT LIMIT 5 TONS r pF ENY$O,YAt ermit Number r 56-0124866-021,022-EE a 1 'A p p Southeast District y d y 0?� �0 d0 eavys' SCOPE OF WORK AREA 4 = GRAND CANAL - SOUTH SIDE NETTLES ISLAND GRAND CANAL - SOUTH SIDE - NEW SEAWALL SYSTEM i LOCATION MAP NOT TO SCALE AERIAL VIEW NOT TO SCALE -SCOPE OF WORK LOCATION MAP 1164• - 1 •-0• NEW SEAWALL SYSTEM FDEP STATEMENT (OCTOBER 26. 2021): GRAND CANAL - SOUTH SIDE THESE PLANS ARE SUBMITTED TO FDEP FOR REVIEW OF THE NETTLES ISLAND SEAWALL VERIFICATION OF EXEMPTION ONLY. 9803 S. OCEAN DRIVE REFERENCE TO DOCK RECONSTRUCTION EXEMPTIONS ARE JENSEN BEACH• R 34957 SUBJECT TO SEPARATE VERIFICATION IF NEEDED. SHEET DESCRIPTION S-1 COVER SHEET S-1.1 ADDITIONAL MAPS S-2 GENERAL NOTES S-2.1 VIBRATION CONTROL & MONITORING NOTES S-2.2 CONCRETE RESTORATION NOTES S-3 LOT 1050 PLAN AND ELEVATION S-4 LOT 1051 PLAN AND ELEVATION S-5 LOT 1052 PLAN AND ELEVATION S-6 LOT 1053 PLAN AND ELEVATION S-7 LOT 1054 PLAN AND ELEVATION S-8 LOT 1055 PLAN AND ELEVATION S-9 LOT 1056 PLAN AND ELEVATION S-10 LOT 1057 PLAN AND ELEVATION S-11 LOT 105E PLAN AND ELEVATION S-12 LOT 1059 PLAN AND ELEVATION S-13 LOT 1060 PLAN AND ELEVATION S-14 LOT 1061 PLAN AND ELEVATION S-15. LOT 1062 PLAN AND ELEVATION S-16 LOT 1063 PLAN AND ELEVATION S-17 LOT 1064 PLAN AND ELEVATION S-1B LOT 1065 PLAN AND ELEVATION S-19 LOT 1066 PLAN AND ELEVATION S-20 LOT 1067— PLAN AND ELEVATION S-21 LOT 1067 PLAN AND ELEVATION D-1 COMPONENT SPECFICATIONS D-2 COMPONENT SPECIFICATIONS D-3 SEAWALL DETAILS D-4 SEAWALL DETAILS — OPTION A D-5 SEAWALL DETAILS — OPTION A D-6 SEAWALL DETAILS — OPTION A D-7 SEAWALL DETAILS — OPTION B CATEGORY QUANTITY EXISTING CONCRETE CAP 700 LF EXISTING CONCRETE SEAWALL 700 LF TIMBER DOCK DEMO 4300 SF TIMBER DOCK RECONSTRUCTION 4300 SF (18) LOTS WITH TIMBER DOCKS REQUIRING DEMO & RECONSTRUCTION I=SM ENGINEERING CIVIL - STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW OCEAN BOULEVARD STUART• FLDRIDA 34994 772-220-46U I —.CSM.E.NET CERTIFICATE OF AIONORUJOION: 29057 >K oRxBR Ium �T w� mROI ua wlmrt No tmu emmT RaIIs xNo EO ooRae ATA Tor m a Rromm aN®. oiFR a 1®RR ID Ad T6D MOT N AII IWI4i RMhT xIV9D01 a1M fi6T RORRx M 0RE9 xOml RERd501 ND tt191R 0' l81 O61®N411G 6 N 16�1M �FS9MR SID1y B N6lWTr�6 M�nr���rx�Rorour�oc� ax NRlomool a m DR+amAi ue I.vI III'iE91; BR ovnmv r� PERMIT SET 10-26-2021 ```AlIL1LLLI�rLi��� � •�` ES A••�OF'', �� VcENSF'•-.�. '� No. 76910 _ pQ� •.• STATE OF •• :(/�� SZONAL E?G`�. OPM A DAM M DUE COVER SHEET S-1 A CONCRETE CLOSURE 50.00 UC-75, KING PILES ® 4'O.C. MAX 650.00 SG-950, KING PILES 0.8'O.C. MAX rytp55 t tOBt t06R i0.59 t -7 QS 10 "'I T T ,rco CQ C N r� ENLARGED SITE MAP NOT TO SCALE ���5 OT sht• e O Permit Number 56.0124866-021,022-EE R p Southeast District EXISTING DOCKS TO BE REMOVED, STORED, REINSTALLED/REPLACED t� TOP OF CAP TO CENTERLINE OF CANAL TOP OF CAP TO MUDLINE 12'- ' MUDLINE: 8'-0" 696.49 ENLARGED CANAL RIGHT OF WAY NOT TO SCALE jr 4�.- �' N �`_�. I '� i •J—.,L V` I / 1, r -� I ^• F I 6V p AERIAL MAP - LOTS 1050-1 067 NOT TO SCALE - NEW SEAWALL SYSTEM GRAND CANAL. SOUTH SIDE NETTLES ISLAND 9803 S. OCEAN DRIVE JEISEN BEACH. FL 34957 I=Sm ENGINEERING CIVIL • STRUCTURAL • MARINE GSM ENGINEERING, LLC 208 SW OCEAN BODUVMD DTLtART, FwRl A 34994 77Z-220-4601 W W W.CBM-E.NET CERm FlCATEDi A0 0RLZATI0N: 29057 1R I1B@A RctDr... Ml RE916R 16601 p1RA w wnnD ND Imm RApRmf RBIR R MY NC NO A1E Imm a R;;o� m RW 11w R1Wf N Iri 1ROI pt WllA OIVSLLLflI ®IOIf RbT m01l0811E RIffR4 elnd RR®1 /1D f061D 6 C31 DRREDRfI IIG 11D RRNmR. TIE CM W M— RIMMUE) RDOL DIiEF—R ASNRUC 40 B mMUh4 QRYLBaIIl U' 6RRRRiR ®1 DRq IR N aoE OI • iIR WI M ORRII fl06f RADII M BORTI NIIIQYROI li BI OOfW411G = DIRRDMi a armllD=) mom a rn6mRIS PAR �� No. 76910 �� pQ STATE OF•�(/�� 70NAl- L�?``�� CINRES A DNmfll A DUE wDLTIONw I111P5 s-1.1 STRUCTURAL DESIGN CRITERIA: 4 COMPLIES WITH THE REQUIRMNIS OF THE 2017 FLORIDA BUILDING CODE WIND LOAD FBC 2017 OWPIIERS 1, 2, 26, & 28 OF ASCE 7-10 WIND VELOCITY 160 MPH ULTIMATE WIND SPEED EXPOSURE b' LOAD COMBINATIONS ASCE 7-10 CHAPTER 2.4. DL+LL., DL+0.5WL• .60L+0.5WL INTERNAL PRESSURE COEFFICIENT +/-0.00 PER TABLE 26.11-1 OPEN SOUD WALL DESIGN RISK CATEGORY B RIGID JINN FRAME MAXIMUM PRESSURE (HORIZONTAL) +120 PSF UNIFORM SURCHARGE BEHIND WALL +200 PSF DESIGN BASED ON LOOSE FINE SANDS DEMOLITION: 1. ALL PILES, DECK BOARDS, JOIST, AND BEAMS TO BE REMOVED WITHIN 10'-0' OF SEAWALL 2. ALL DEBRIS SHALL BE CONTAINED WITH A MOBILE TURBIDITY CURTAIN 3. DEBRIS FROM DEMOLITION AND ITEMS INDICATED TO BE REMOVED SHALL BE REMOVED FROM OWNERS PROPERTY AND PROPERLY DISPOSED OF BY THE CONTRACTOR IN A PERMITTED LANDFILL 4. CONTRACTOR SHALL IMMEDIATELY REMOVE AND PROPERLY DISPOSE OF ANY DEBRIS THAT ENTERS THE WATER DURING THE DEMOLITION OF THE INDICATED STRUCTURES. BACKFILL NOTES: 1. BACUU-11179K BEHIND WALL SHALL CONSIST OF CLEAN GRANULAR SAND WITH LESS THAN 5% FINES PASSING THE US NO 200 SIEVE PLACE BACKFILL MATERIAL IN LOOSE UFTS OF 1Y IN THICKNESS AND COMPACT EACH LIFT TO NO LESS THAN 98 PERCENT OF ITS MODIFIED DRY PROCTOR VALUE (ASTM D 1557). CONSTRUCTION SAFETY: 1. LOADS GREATER IRAN THE APPLICABLE DESIGN LOADS SHALL NOT BE PLACED ON THE STRUCTURE PROVISIONS SHALL BE MADE FOR ADEQUATE BRACING AND SUPPORT OF ADJACENT CONSTRUCTION, UTILITIES AND EXCAVATIONS. JOB SITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE RESPONSIBILITY OF THE CONTRACTOR. PILE DRIVING: 1. OPROCEDURES AND EQUIPMENT SHALL BE IN ACCORDANCE WTIH'FDOT STANDARD SPECIFICATIONS 455-5 AND A455-5. SEE MBRATION CONTROL & MONITORING NOTES. 2 CONTRACTOR SHALL PROVIDE INFORMATION OF PILE DRIVING HAMMER AND ACCESSORIES SHALL BE USED ON THIS JOB TO THE OWNER FOR APPROVAL 3. IF THE PILES ARE JETTED INTO PLACE. THE PILES MAY BE JETTED THE FIRST FIVE FEET MAXIMUM AND DRMN THE REMAINING LENGTH WITH A HAMMER MEETING FDOT SPECIFICATION A455-33. JETTING MUST CONFORM TO PERMIT REQUIREMENTS. 4. PILE DRMNG LOGS FOR ALL PILES TO BE PROVIDED BY OTHERS. PILE DRIVING LOGS SHALL BE SUPPLIED WITHIN ONE WEE( OF DRIVING EACH PILE PILE LOG TO BE SIGNED AND SEALED BY GEOTECHNICAL ENGINEER. SUBMIT ONE COPY TO THE FOLLOWING: 4.1. LOCAL JURISDICTION ISSUING PERMIT 42. ENGINEER OF RECORD 43. OWNER CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER OF ANY PILE THAT DOES NOT REACH THE REQUIRED PILE TIP ELEVATION. STRUCTURAL AND MISCELLANEOUS STEEL: 1. -ALL HARDWARE SHALL BE STAINLESS OR HOT DIPPED GALVANIZED UNLESS OTHERWISE NOTED. 1.1. STAINLESS BOLTS ARE RECOMMENDED DUE TO THE SALTWATER ENVIRONMENT. 1.2. HOT DIPPED GALVANIZED TIEBACK RODS PVC SLEEVED ARE RECOMMENDED 2. ALL STEEL WORK SHALL BE EXECUTED IN ACCORDANCE TO RISC SPECIFICATIONS FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS. ALL WELDING SHALL BE IN CONFORMANCE WITH AWS D1.1-2010. 3. MATERIAL SHALL CONFORM TO THE FOLLOWING, UNLESS OTHERWISE NOTED: A SHAPES, BARS, AND PLATES ASTM A 572 B. BOLTS, NUTS, AND WASHERS ASTM A 325 4. ALL STRUCTURAL AND MISCELLANEOUS STEEL SHALLBEGALVANIZED BY THE HOT -DIPPED PROCESS IN ACCORDANCE WITH ASTM A 123. A 153, GRADE 90 GUIDELINES AFTER FABRICATION. 5. FIELD TREAT ALL DAMAGED GALVANIZED FINISH AND EXPOSED SURFACES WITH TWO CCATS OF ZINC RICH PAINT OR COLD GALVANIZING COMPOUND CONFORMING TO ASTM A 780. CONCRETE AND REINFORCING STEEL: 1. CONCRETE CHAIRS 0 36 ON CENTER, MAXIMUM EACH WAY 2 NO EXPANSION JOINTS SHALL BE INSTALLED WITHIN 20 FEET OF WALL CORNERS. 3. ALL REBAR ST HOOKS ARE TO BE EKIERDED 24' MIN BEYOND THE TURN FIELD BENDS ARE TO BE DONE COLD AND THE DIAMETER OF THE BEND, MEASURED ON THE INSIDE OF THE BAR, IS NOT TO BE LESS THAN (36) BAR DIAMETERS. 4. CONCRETE CAP SHALL HAVE A DENSITY OF 144 PCF, AND SHALL CONFORM TO ACI 301-99. 5. CEMENT SHALL CONFORM TO ASTM C 94. 6. COURSE AGGREGATE SHALL CONFORM TO ASTM C 33, W TO Ar' NOMINAL AGGREGATE 7. REINFORCING SLED. SHALL CONFORM TO ASIM A 615, GR 60. 8. DCI CORROSION INHIBITOR, ASTM C 494 ADMIXTURE, SHALL BE ADDED AT 3.0 GAL/CY AS MANUFACTURED BY W.R. GRACE & CO. OR APPROVED EQUAL 9. CONTRACTOR SHALL REPAIR ALL SURFACE BLEMISHES (CHIPS, CRACKS, HONEYCOMBS, ETC) IN CONCRETE WITHIN 24 HOURS AFTER FORM REMOVAL 10. ALL CONSTRUCTION JOINTS BERM CASEIN -PLACE CONCRETE TO BE BONDED WAFT EPDXY BONDING AGENT & CLEANED WITH A ROUGHED SURFACE OFY' AMPLITUDE 11. REINFORCING STEEL SHALL CONFORM TO ASDJ SPECIFICATION A615, GRADE 60 FOR BARS AND ASTM SPECIFICATION A185 FOR WELDED WIRE MESH (W.W.M.). FABRICATION, INCLUDING ACCESSORIES, ALLOWANCE FOR CONCRETE PROTECTION AND MINIMUM AREA OF STEEL REQUIRED, SHALL BE IN ACCORDANCE WITH THE A.C.I. BUILDING CODE AND CRSI MANUAL OF STANDARD PRACTICE 8. CAP CONCRETE SHALL BE MINIMUM 5.000 PSI AT 28 DAY STRENGTH W/C RATIO = 0.4 9. DEADMAN CONCRETE SHALL BE MINIMUM 3,000 PSI AT 28 DAY STRENGTH W/C RATIO = 0.5 (IF APPUCABLL) 10. MIX DESIGNS 10.1. TYPE II NORMAL WEIGHT PORDAND CEMENT 10.2. SIUCA FUME (MICROSIL.ICA)CEMENTI110US ADDITIVE 10.3. ADMU(NRES FOR _ 10.3.1. SHRINKAGE REDUCTION 10.3.2 CORROSION INHIBITION 103.3. HIGH RANGE WATER REDUCTION 103.4. WATER CEMENT RATIO PER /8 & 9 10.3.5. POZZOLAN IS NOT TO BE USED IN THE MIX B. TO ENSURE COMPATIBILITY OF PRODUCTS, SILICA FUME AND HIGH RANGE WATER REDUCER SHALL BE FROM THE SAME MANUFACTURER 9. TO RETARD THE CURING RATE FOR THE REPLACED LANDSCAPE WALL CAP THE CONTRACTOR SHALL KEEP THE CONCRETE SURFACE MOIST FOR A CURING PERIOD OF 7 DAYS. 10. WATER FOR MIXING AND CURING SHALL BE FRESH, CLEAN, POTABLE AND FREE OF INJURIOUS AMOUNTS OF OIL, ACID, SALT OR ALKALI. 11. A BONDING AGENT SHALL BE USED OVER SURFACES WHERE FRESH CONCRETE MEETS HARDENED CONCRETE THE APPUDATION OF THE BONDING COMPOUND SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. 12. THE SLUMP SHALL BE MEASURED FOR EACH TRUCK ON CONCRETE AND THE SLUMP SHALL NOT EXCEED 5 INCHES FOR THE CAP CONCRETE AND 6 INCHES FOR THE REMAINING CONCRETE NO ADDITIONAL WATER MAY BE ADDED TO THE CONCRETE AFTER SLUMP MEASUREMENT UNLESS THE SLUMP IS LESS THAN THAT SPECIFIED ABOVE. 13. A QUALIFIED TESTING LABORATORY SHALL BE RETAINED TO PERFORM THE FOLLOWING TESL (ONE COPY OF ALL TEST REPORTS SHALL BE SENT DIRECTLY TO STRUCTURAL ENGINEER AND OWNER) 13.1. CYLINDER STRENGTH TESTS - ASTM C39: ONE SET OF FOUR CYLINDERS FOR EACH 50 CUBIC YARDS OR FRACTION THEREOF. TEST ONE CYLINDER AT 7 DAYS AND TWO AT 28 DAYS HOLD THE FINAL CYLINDER IN RESERVE.TEXr 13.2. SLUMP TESTS - ASIN C143 14. IMMEDIATELY AFTER PLACEMENT, THE LANDSCAPE WALL CAP SHALL BE PROTECTED FROM PREMATURE DRYING. 15. THE REPLACEMENT LANDSCAPE WALL CAP SHALL BE MAINTAINED CONTINUOUSLY WET FOR A PERIOD OF 7 DAYS AFTER POURING. 16. EITHER PERVIOUS (BURLAP OR COTTON) MATS OVER IMPERVIOUS (PLASTIC COATED BURLAP) SHEETING MAY BE USED BUT POLYTHENE SHEETING SHALL NOT BE USED. THE SHEETING SHALL BE SECURED SO AS TO KEEP THE EXPOSED SURFACE OF THE CAP IN A MOIST CONDITION. 17. THE MATS SHALL BE KEPT WET BY EITHER MANUAL OR DRIP IRRIGATION AND THE SHEETING SHALL BE INSPECTED AT LEAST ONCE EVERY 8 HOURS TO ENSURE THAT THE SHEETING HAS NOT DRIED OUT. SHOP DRAWINGS AND FORM WORK PLANS: IZE AND STRENGTH OF FORM WORK, SEQUENCE OF CONSTRUCTION, AND DETAILED PLANS OF FORM WORK REMOVAL AND RE -SHORING. 2. ALL FORM WORK FOR CONCRETE SHALL CONFORM TO THE REQUIREMENT OF ACI SPECIAL PUBLICATION NO. 4, 'FORM WORK FOR CONCRETE' AND 'STANDARD RECOMMENDED PRACTICE FOR CONCRETE FORM WORK', ACI 347, LATEST EDITION. 3. CONTRACTOR SHALL SUBMIT THE DESIGN AND DETAILS OF ALL FORM WORK, DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER FOR REVIEW BY THE STRUCTURAL ENGINEER. 4. THE GENERAL CONTRACTOR SHALL REVIEW ALL SHOP DRAWINGS BEFORE SUBMISSION TO THE ENGINEER AND MAKE ALL CORRECTIONS AS HE DEEMS NECESSARY. 5. DRAWINGS SHOWING ALL OPENINGS AND SLEEVES SHALL BE SUBMITTED BY THE CONTRACTOR FOR REVIEW BY THE ENGINEER. 6. SLEEVES, BOXES AND OTHER OPENINGS WILL NOT BE PERMITTED UNLESS SHOWN ON THE DRAWINGS SUBMITTED FOR REVIEW. pF Ehjt 4O m O Permit Number 56-0124866-021,022-EE 1 d p Southeast District O _a �o �O a a v I 7 r NEW SEAWALL SYSTEM GRAND CANAL • SOUTH SIDE NETTLES ISLAND 9803 S. OCEAN DRIVE JLNSEN BEACH, FL 34957 rm S M ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SIN OCEAN SOULEVARU STUART, F-1-34994 772-220-4601 -.CSM•E.NRT , CERTIFICATE CIFALITHORIZATION: 29DS7 ne 111i1W FE®r mw.mr Rmen xs I�m meol W ME mvnNOORLER9 TR61W RIVE xO mlal� � xR TO LE RRmpm, EN®. NRA m A� m 9r nw IYRR x An IRRI w Rxxs RS@TI MD LUCENT 6=F#1ILIK l �� IFS DDORml. 9E DAS x L®E 1 I®G S M NRRLRM Q fi✓xL®I( SA4E E RR{49T ff m Fnmaa uc uoswrroaug4xno[mx %lO I9i AW OMIT RCFCf 0OM iK RRmM xrMxR�avl a m F>aRDac ue ml oxma A uz CRSirt = IRIDES a U' No.76910 Q •••. STATE OF s!ONA� LET:`` CWIOES A DARDEN A DATE GENERAL NOTES S-2 VIBRATION CONTROL & MONITORING 5. THE AMPUTUDE/FREQUENCY VIBRATION MONITOR SHAH. BE FOOT APPROVED. THIS INSTRUMENT SWV1 BE CAPABLE OF NEW SEAWALL SYSTEM 1. THE FOLLOWING PROVISIONS DO NOT RELIEVE CONTRACTOR OF ANY RESPONSIBILITY FOR DAMAGE CAUSED BY HIS MEASURING, RECORDING AND PRODUCING A HARD COPY OF THE FREQUENCY AND PEAK PARTICLE VELOCITY IN THREE MUTUALLY PERPENDICULAR AXES. ('VECTOR SUM' INSTRUMENTS ARE NOT ACCEPTABLE). THIS INSTRUMENT SHALT. BE GRAND CANAL -SOUTH SIDE OPERATIONS, NOR DO THEY RELIEVE CONTRACTOR FROM COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, COUNTY AND CAPABLE OF NETTLES ISLAND CITY CODES RELATIVE TO THE USE AND STORAGE OF EXPLOSIVES. IN THE EVENT THAT A CONFLICT OCCURS BETWEEN THIS MEASURING LINEAR SCALE ( OB-L) SOUND LEVELS. 9803 S. OCEAN DRIVE SPECIFICATION AND OTHER CODES, IT SHALL BE RESOLVED BY THE ENGINEER. PUBLIC RELATIONS JENSEN BEACH, FL 34957 SUSCEPTIBILITY STUDY 1. CONTRACTORIFFMIRED TO HAVE BOTH LETTER AND PERSONAL CONTACT WITH RESIDENTS AND OWNERS OR OPERATORS 1. S BE PREPARED FOR OWNER BY CONTRACTOR. THIS REPORT C INCLUDE AN EVALUATION THE BUILDINGS THAT ARE ADJACENT TO THEE AREA OR NEAR ENOUGH FOR GROUND VIBRATIONS S AN OF BUILDINGS AND STRUCTURES ON PROXIMITY TO THE PROJECT AND AN EVALUATION OF THEIR SUSCEPTIBILITY TO HEIR FROM FROM CONSTRUCTION OPERATIONS TO AFFECT THE PERSONAL PROPERTY, DISPLAYS OR MERCHANDISE OF THESE BUILDINGS. PERSONAL ER H CONSTRUCTION VIBRATION DAMAGE THE VIBRATION CRITERIA FOR THIS PROJECT IS BASED ON THIS STUDY. THIS CONTACT WILL BE MADE PRIOR TO THE BEGINNING OF ANY VIBRATION PRODUCING ACTIVITY. CONTRACTOR WILL FURNISH C S M A LIST OF THOSE CONTACTED TO ENGINEER. CONDITION SURVEY 2. AS DESCRIBED ELSEWHERE IN THESE PROVISIONS, THE GROUND VIBRATION RESULTING FROM CONSTRUCTION WORK WILL BE S 1. A CONDITION SURVEY WILL BE (OR H BEEN) PERFORMED FOR BUILDINGS IN PROXIMITY TO THE PROJECT. THIS SURVEY MONITORED BY OTHERS GEOTECH WILL MEASURE THE MAGNITUDE OF EACH VIBRATION EVENT WITH AT LEAST TWO VIBRATION E N G I N E E R I N G WILL DOCUMENT THE EXISTING EXTERIOR AND INTERIOR CONDITIONS OF THESE BUILDINGS. INSTRUMENTS, GENERALLY LOCATED ADJACENT TO THE CLOSEST OR MOST CRITICAL STRUCTURES. CIVIL • STRUCTURAL • MARINE CBM ENGINEERING, LLC 2. THE SURVEY WILL INCLUDE DOCUMENTATION OF INTERIOR SUB -GRADE AND ABOVE GRADE ACCESSIBLE WALLS, CEILINGS. RECORD KEEPING FLOORS, ROOF, AND VISIBLE EXTERIOR AS VIEWED FROM THE GRADE LEVEL IT WILL DETAIL (BY ENGINEERING SKETCHES. MAINTAIN A LOG OF ALL VIBRATION -PRODUCING ACTIVITIES AT WHICH GROUND VIBRATIONS WERE z0e sw acuN BOYLEVARD VIDEO TAPE, PHOTOGRAPHS, AND/OR NOTES) THE EXISTING STRUCTURAL, COSMETIC, PLUMBING AND ELECTRICAL DAMAGE MEASURED. THE LOG SHALL INCLUDE THE MAXIMUM PEN( PARTICLE VELOCITY AND ITS ASSOCIATED FREQUENCY, TYPE AND STUART. R Rl A 34994 BUT WILL NOT NECESSARILY BE LIMITED TO AREAS IN BUILDINGS SHOWING EXISTING DAMAGE LOCATION OF THE VIBRATION PRODUCING EVENT, LOCATION OF THE GEOPHONES AND CLOSEST DISTANCE FROM THE �7z•zz0.4c01 3. CRACK DISPLACEMENT MONITORING GAGES WILL BE INSTALLED AS APPROPRIATE ACROSS ANY SIGNIFICANT EXISTING CRACKS VIBRATION -PRODUCING DENT TO THE NE WHEN VIBRATION -PRODUCING ACTIVITIES ARE IN PROGRESS, .c` M�E.Ner CERl1fICATE Of AIITHORIZATON: 2905'/ TO HELP VERIFY ANY ADDITIONAL BUILDING DISTRESS, SHOULD IT DEVELOP. THE CAGES WILL BE READ PRIOR TO CONTRACTOR SHALL SUBMIT DAILY REPORTS ENGINEER REPORTS 7 ENGINEER WHICH INCLUDE ALL THE VIBRATION LOG DATA FROM THAT WAY. M�Rw Nmr �TR+�tS mRol a�R Al onRx RaLmr Balls Nile NO COMMENCEMENT OF VIBRATION PRODUCING ACTIVITIES, AS WELL AS DURING THESE ACTMTIES. RESULTS OF THIS MONITORING THESE REPORTS SHALL BE SUBMITTED AT THE END OF EACH DAY, AND NO FURTHER VIBRATION PRODUCING ACTIVITY WILL E WILL BE WE AVAILABLE TO THE CONTRACTOR BE ALLOWED UNTIL SUCH REPORTS ARE RECEIVED BY ENGINEER raa� m a ��•• �• a 2 CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL VIBRATION RECORDS PRODUCE) BY THE VIBRATION INSTRUMENTS �n mMort'�00m oNwsa llE�OwRaiRImI GROUND VIBRATION CONTROLS AND ATTACHING THEM TO THE CORRESPONDING BLAST LOG FOR SUBMITTAL TO ENGINEER /S PART OF THE DAILY REPORT. mmrtvml DONE .m 1. THE FOLLOWING VIBRATION TTS ARE APPLICABLE FOR ALL CONSTRUCTION WORK, INCLUDING BUT NOT LIMITED CONTRACTOR SHALL MAINTAIN A COMPLAINT LOG OF ALL VIBRATION RELATED COMPLAINTS, CONTACTS AND ACTIONS, AND ���•�+'��� TO BLASTING, PILE DRIVING, COMPACTION, RIPPING, CHIPPING, AND HAULING ACTIVITIES SfVLL1 FURNISH COPIES TO ENGINEER ON REQUEST. R N RsvaLmrt 0 RnOmri aaR 6 RRRPII V 61N 2. CONTRACTOR IS ADVISED THAT THE GROUND VIBRATION CONTROL LIMITS DEFINED HEREIN MAY RESTRICT HIS CONSTRUCTION wme°ml"Mroou �Rc6T mnr�9EUR�RIIgOE PRACTICES, AND THAT HE SHOULD CONSIDER THESE LIMITATIONS IN PREPARING HIS BID. 3. IF CONTRACTOR EXCEEDS 90% OF THE GROUND VIBRATION LIMIT AS GIVEN BELOW, FOR ANY CONSTRUCTION ACTIVITY, HE C"I tea Uca zml) SHALL CEASE THAT ACTNW AND SUBMIT A REPORT. THE REPORT SHALL GIVE THE CONSTRUCTION PARAMETER DATA AND INCLUDE A PROPOSAL FOR CORRECTIVE ACTION NECESSARY TO ENSURE THAT THE SPECIFIED UNIT IS NOT EXCEEDED FOR FUTURE ACTIVITIES. THIS REPORT SHALL BE SUBMITTED TO ENGINEER, AND HIS PERMISSION MUST BE OBTAINED PRIOR TO THE CONDNUATON, OR BEGINNING OF ANY FUTURE VIBRATION PRODUCING CONSTRUCTION ACTIVITIES 4. IF CONTRACTOR EXCEEDS THE GROUND VIBRATION LIMIT FOR ANY CONSTRUCTION ACITIM, ENGINEER WILL DIRECT THAT ALL O F E My ACTIVITIES RELATED TO THOSE CAUSING THE VIBRATION BE STOPPED. CONTRACTOR SHALL SUBMIT TO ENGINEER A REPORT tii� vt� GIVING THE CONSTRUCTION PARAMETER DATA AND INCLUDE THE PROPOSED CORRECTIVE ACTION FOR FUTURE CONSTRUCTIONS O� CAMS. IN ORDER TO PROCEED WITH ANY FURTHER VIBRATION PRODUCING ACTIVITIES, WRITTEN PERMISSION MUST BE OBTAINED FROM ENGINEER @ DEFINITIONS 1. THE FOLLOWING DEFINITIONS SHALL APPLY TO THE VIBRATION CONTROLS: 'q a xoRs a 0m0mils I I.I. PEAK PARTICLE DISPLACEMENT - THE PEAK PARTICLE DISPLACEMENT IS THE MAXIMUM MOVEMENT INDUCED BY THE A Permit Number 9 VIBRATION. THE DISPLACEMENT AMPLITUDES ARE IN UNITS OF MILS (0.001 INCH) ZERO TO PEN( AMPLITUDE �" R 1.2. PEAK PARTICLE VELOCITY - THE PEAK PARTICLE VELOCITY IS THE MAXIMUM RATE OF CHANGE WITH RESPECT TO TIME S OF THE PARTICLE DISPLACEMENT. THE VELOCITY AMPLITUDES ARE IN UNITS OF INCHES PER SECOND (IPS), ZERO TO 56-0124866-021,022-EE ti PEAK AMPLITUDE L R 1.3. FREQUENCY - THE FREQUENCY OF THE VIBRATION IS THE NUMBER OF OSCILLATIONS WHICH OCCUR IN ONE SECOND. Ml uoFS U9vua WG®NMI=— THE FREQUENCY UNITS ME GIVEN IN HERTZ (HZ) WHERE ONE HZ EQUALS ONE CYCLE PER SECOND. p Southeast District y° GROUND VIBRATION CONTROL LIMIT 9% O mauma ��BS REta®Elm nE xs sr� N9LVlD R1aN m ntlr NOR 1. THE GROUND VIBRATION CONTROLS ARE APPLICABLE TO EXTERNAL LOCATIONS ADJACENT TO AFFECTED BUILDINGS OR '�� STRUCTURES. THE MAXIMUM SINGLE COMPONENT PEN( PARTICLE VELOCITY RESULTING FROM CONSTRUCTION AMMIY SHALL 01y NOT EXCEED 0.2IN/S. y sae ,s 9m NaRLT R p •L v 9 - INSTRUMENTATION ,L 1. DURING AR VIBRATION PROSHALL DUCING ACTIVITIES THAT COULD, IN THENTAIN AND OPERATE THREE TUDGMENT OF ON MONITORS (AMPLITUDEENCY SENSITIVE) ENGINEER,AEAND PRODUE MEASURABLE GROUND GROUND VIBRATIONS. IN THE EVENT THAT CONTRACTOR CHOOSES TO HAVE CONCURRENT VIBRATION PRODUCING ACTIVITIES �:•' ENSF 'r4; AT MORE THAN ONE LOCATION ON THE CONSTRUCTION SITE, HE SHALL NOTIFY ENGINEER IN WRITING AT LEAST TWO WEEKS `� v PRIOR TO THE COMMENCEMENT OF SUCH ACTIVITIES. ENGINEER MAY REQUIRE ADDITIONAL VIBRATION MONITORING V;' '•� INSTRUMENTS AT EACH LOCATION DEPENDING ON SITE PARAMETERS. No. 76910 2. NO VIBRATION PRODUCING ACTIVITIES MAY BE STARTED UNTIL THE APPROPRIATE INSTRUMENTATION IS PROVIDED BY CONTRACTOR AND APPROVED BY ENGINEER ALL VIBRATION INSTRUMENTS SHALL BE POWERED WITH RECHARGEABLE BATTERIES, AND CONTRACTOR SHALL SUPPLY EXTENSION GEOPHONE AND MICROPHONE CABLES SO THAT THE INSTRUMENTS CAN BE PLACED WITHIN STRUCTURES IF OUTSIDE TEMPERATURES DROP BELOW 32 DEGREES FAHRENHER. •'•, 3. ALL VIBRATION INSTRUMENTS SHALL BE SUPPLIED WITH CURRENT CALIBRATION DOCUMENTS AND SHALL BE RECAUBMTED ON APPROXIMATELY ASIX-MONTH USE INTERVAL AT A MINIMUM, INSTRUMENT SPECIFIC CALIBRATION CURVES OF PEAK Q STATE OF •' !(�� i�(C •'•.fZOR V •G\��� PARTICLE VELOCITY INPUT TO PEAK PARTICLE VELOCITY OUTPUT SHALL BE PROVIDED OVER THE SPECIFIED FREQUENCY �'i S'S RANGES AT BOTH 0.5 AND 1.0 IPS FOR EACH INSTRUMENT. 'Z/A� 0NAL, 4. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTRUMENT MAINTENANCE IF CONTRACTOR DOES NOT MAINTAIN A SUFFICIENT NUMBER OF INSTRUMENTS TO MONITOR THE BUILDINGS/STRUCTURES ADJACENT TD THE VIBRATION PRODUCING ACTVTY, a ARLES A DAM A DUE ENGINEER MAY DIRECT THAT ALL VIBRATION ACIMTIES CEASE UNTIL A SUFFICIENT NUMBER ARE WORKING. RECORDING TAPE SHALL BE SUPPLIED BY CONTRACTOR AND AT LEAST A TWD-WEIX SUPPLY MAINTAINED. CONTRACTOR SHALL DESIGNATE AN INDIVIDUAL IN HIS ORGANIZATION OR UNDER CONTRACT TO HIM, WHO WILL BE RESPONSIBLE FOR "MATION CONTROL & MONTITXBNG NGTES INSTRUMENT COORDINATION. CONTRACTOR WILL BE RESPONSIBLE FOR PLACING THE INSTRUMENTS AT MEASURING LOCATIONS DESIGNATED BY ENGINEER, AND READING AND RECORDING THE PERTINENT VIBRATION EVENT DATA CONTRACTOR WALL —0 REPORT THE DATA TO ENGINEER AT THE COMPLETION OF EACH VIBRATION EVENT. S-2.1 MIXING AND CONVEYANCE E MIXED IN ACCORDANCE WITH ACI 304 AND DELIVERED IN ACCORDANCE WITH ASHY C94. 2. SELECT PROPORRONS FOR NORMAL WDGHT CONCRETE IN ACCORDANCE WITH ACT 301. 3. CONCRETE SWILL BE CONVEYED FROM MIXER TO PLACE OF INL DEPOSIT BY METHODS THAT WILL PREVENT SEPARATION OR LOSS OF MATERIAL C CONVEYING EQUIPMENT SHALL BE CAPABLE OF PROVIDING A SUPPLY OF CONCRETE AT THE SITE OF PLACEMENT WITHOUT SEPARATION OF INGREDIENTS AND WITHOUT INTERRUPTIONS SUFFICIENT TO PERMIT LOSS OF PLASTICITY BETWEEN SUCCESSIVE INCREMENTS 5. DURING HOT WEATHER, PROPER ATTENTION SWILL BE GIVEN TO INOffOEN15, PRODUCTION METHODS, IW7DUNG, PLACING, PROTECTION AND CURING TO PREVENT EXCESSIVE CONCRETE TEMPERATURES OR WATER EVAPOPAT10N THAT MAY NAIR REQUIRED STRENGTH OR SERVICEABILITY OF THE MEMBER STRUCTURE: CURING OF CONCRETE 1. ALL REPAIR AREAS SOUL. RECEIVE AN APPLICATION OF BURKE 'AQUA RESIN' MEMBRANE CURING COMPOUND AFTER FINISHING IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS 2. ALL CONCRETE SHALL CURE A MINIMUM OF 28 MI5 PRIOR TO APPLICATION OF ANY COATINGS OR FLASHES. 3. AN OBSERVATION SULL BE CONDUCTED BY THE ENGINEER PRIOR TO APPLICATION OF ANY COATINGS ON THE CONCRETE ANY CRACKS IN THE REPAIR AREAS SHALL BE REPAIRED IN ACCORDANCE WITH THE REWPSENTS FOR CRACK REPAS. REPAIR OF CRICKS SHALL BE AT NO ADDITIONAL COST TO THE OWNER. INSPECTION PLAN 1. G"'M I.I. ENWOiA SNAIL REVIEW ANY WORK UNDERWAY. AS APPROPRIATE ALL STRUCTURAL REPAIRS, INCLUDING REINFORCED CONCRETE REPAIRS AT EACH LOCATION REWIRE SPECIFIC ENGINEERING INSPECTIONS AND APPROVALS. NON-STRIICNRAL WORK, SUCH AS STUCCO, OVERIAYS, WATERPROOFING, AND All NON -REINFORCED CONCRETE PLACEMENTS DO NOT REQUIRE INSPECTIONS AND APPROVALS AT EACH PHASE OF WORK. BUT WILL BE SUBJECT TO ONGOING ENGINEERING OBSERVATIONS AND APPROVALS DURING THE WORK. U CONDUCTOR SHALL NOTIFY ENGINEER AT HEIST 2 BUSINESS DAYS PRIOR TO ANY REWIRED INSPECTION. 13. DURING THE ONSITE INSPECTIONS, ENGINEER SHILL MIEN ANY WORK UNDERWAY, REGARDING WORK LOCATIONS. METHODS SHORING. FORMS, SAFETY. PROPERTY PROTECTION, CONCRETE PLACEMENTS, PROPER CURING OF NOW PLACED CONCRETE, OWNER CONCERNS, OR ANY OTHER HENS AS APPROPRIATE IA. CONTRACTORS SITE SUPERINTENDENT SHWL MAINTAIN A SET OF INSPECTION DRAWINGS AND SPREADSHEETS MARKED UP TO INDICATE THE CURRENT WORK STATUS THESES SHALL BE AVAILABLE FOR RENEW BY ENGINEER AND OWNER UPON REQUEST. 15. ENG NEER SHALL SUBMIT A WRITTEN REPORT TO THE BUILDING DEPARTMENT AT THE END OF CONSTRUCTION. 2. CONCRETE RESTORATION LT. ENGNEE R SHALL IDENTIFY AND MAR( OUT ALL ARRAS TO BE INVESTIGATED AND / OR EXCAVATED BY CONTRACTOR PRIOR ANY EXCAVATION BEING PERFORMED. 22 EXCAVATION UMOIS ENGINEER SKULL INSPECT ARID APPROVE, AS RENTED, ALL LIMITS OF CONCRETE REMOVAL AND ALL STEEL REINFORCEMENT REPAIRS FNG3M SAL VERIFY CONTRACTOR MEASUREMENTS AND APPROVE OR DISAPPROVE AS REWIRED. ALL CONTRACT CHARGEABLE QUANTITIES FOR ALL REPAIR. 2.3. APPROVAL TO PLACE CONCEMB ENGINEER SHALL INSPECT ALL AREAS PRIOR TO CONCRETE PLACEMENT AND GIVE APPROVAL. AS REWIRED. FOR ALL CONCRETE PLACEMENTS. ENGINEER STALL INSPECT ALL PREP WORK, INCLUDING FORMS SHORING. SAFETY, STEEL RAN REPAIRS, SHEATHING INSULATION AND ANY ADJUSTMENTS TO EXCAVATION LIMITS. 24. PLACEMENT OF CONCRETE ALL DESIGN MIX TRUCK PLACEMENTS OF CONCRETE REWIRE ON SITE ENGINEERING AND SHALL SP INSPECTED BY ENGINEER DURING HACFMENIS. APPROVAL GS DESGN MIX P ACIEMENT BASED ON SLUMP RESULTS, ENVIRONMENTAL CONDITIONS, ETC. SHALL BE AT THE DISCRETION OF ENGINEER ENGINEER MAY ALSO REWIRE INSPECTIONS OF BAG GCODS CONCRETE PLACEMENTS 25. FINAL ENGINEER SHALL INSPECT AND APPROVE, AS REQUIRED, THE COMPLETION OF ALL REPAIRS, INCLUDING ANY CWRECTION OR PUNCH LIST BENS FOR EACH WOK AREA AS APPROPRIATE 3. ENGINEERING APPROVALS 3.1. ENGINEER SHALL APPROVE ALL WORK COMPLETED. 3.2. ENGINEER STALL APPROVE OR DISAPPROVE, AS REQUIRED, SPECIFICATIONS FOR ALL CONDUC DR -SUPPLIED MATERIALS AT (FAST 7 DAYS PRIOR TO PLANNED MATERIAL USE OR PLACEMENT. 3.3. ENMIEER SHALL DETERMINE ANY DISPUTES REGARDING REASONABLENESS OF REPAIRS INVOLVING STRUCTURAL INTEGRITY. NEW SEAWALL SYSTEM GRAND CANAL- SOUTH SIDE NEITLFS &AND 98M S. OCEAN DRIVE JENSEN BEACH, FL 34957 I == S M ENGINEERING 0 F 8IV ` rR CIVIL • STRUCTURAL • MARINE p + C5M ENGINEERING, LLC 208 SW OCEAN BOUL[vRO •� +¢ STU—, FLORIOA 34994 4T 772-220-4601 y WNW.CSM-E.nCT 4 CERTIFICATE OF ANTNCRIZATION: 29057 L` a Permit Number 9 4 L4 NN61E ARE Wm B: BAmam. ft_x-6,q NID®.-T- NWT N - RNI 14 RAINS 56-0124866-021,022-EE 11E[dIR11 ■W911fl1 N0 03 nEf1P"m VG"'�`MU` b 1!6 RNiYpT, iNi R1K N0 NsOB L IR:TLA I .b IS M N9NRmP Q NOLS�IL 4ALE 6 RRNWI N' N�A� M a00tA R6¢f ®�Ildt 9E WIfN� OI N p Southeast District AV wm° j I* C910R♦IfSiIR JIG 0�1wR Y� ova y �o apti �avxS- ®ER RE0Na6 RNm W: m 08 a®erawaa mm �T. a smI TRISECT k ``\\II111111AAAA/'' ESA=°qfOF''% C, ••.� No.76910 Q STATE OF : •!(/�` � '•• FGORIOP. •'' \�� ZONAL E?�`� AAAAAILHII\\\ CJWRFS A BARDEN ,W DUE II ---CONCRETE RESTORATION NOTES 11 S-2.2 (n�5640124866-021,022-EE N��'�RENOYE & REPLACE NEW VINYL ORENTIRE CAP qNG PILECOMPOSITE SEAWALL NEW WALER' (OPTION A) 0 W-0'O.C. MAX INSTALLED IN FRONT OF e• OPTION A EXISTING CONCRETE WALL tiTOP CAp _ yp 0 WATERLINE NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NEW ISIANO 9803 S. OCEAN DRIVE JMB BEACH. FL 3057 C S M ENGINEERING CIVIL • STRUCTURAL • MARINE CS ENGINEERING, LLC 208 SW OCEAN BOULEVARD ST—, R Rlm 34994 772.220• 601 —CBM.E.— U® �[ 11E DPS NO ®B I[OS�Y IBEIL b /A R6iRAB11 V BY®W.498E 6 PRFM V LSI oamoE; uc Ao B m ro a 1Era � Txu m II m a m o�umRa°ri RRrn11 e91 DGKM UC OP 1420 a Js�0% RECONSINuOCTION A�BFOAg �O +trla- = 250 SOFT `�.•���cj A•,Dq�IOF',/.,�' �\CENSF'•..�i �• v No. 76910 E L E VAT I O N NOT TO SCALE ='O 0:� ��0�'•. STATE OF i,��`s•••.�OR.....• `U, `\�� DWCf.S A MI�11 At BtIE xm®Iola® sBTRc LOT 1050 Rme 5-3 CAP ?71 - WATERLINE ERLINE PLAN VIEW NOT TO SCALE REMOVE & REPLACE BORE CAP KNG PILE NEW WATER (OPTION A) `8•-C`O.C. MAX / ;PDON A) a A z 4 ELEVATION NOT TO SCALE EXISTING DOCK AS L USE EXISTING TO RECONSTRUCT r5&0124866-021,022-EE NEW VRM ORCOMPOSITE SEAWALL INSTALLED IN FRONT OF qEXISTING CONCRETE WALL ASSUMED DOCK DEMO & ?s c RECONSTRUCTION AREA- = 200 SOFT 11 NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NETRES ISLAND 9803 S. OCEAN DRIVE JENSEN BEACH, FL 34957 CSM ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 8W 0— BOULEVARD STUART, FLDRIDA 34994 772-220-4601 —.CSM•E.RRT CERTIFICATE OFALITHORIZATION! 29057 IRE Do® N9ERf F)diL9f A4A+E516A014Y�1 aaO�OdR IDf N ff I�ml ORmlT�E0R4 W Aram m xa nsn Rmr � Rrt Rev a RRea rlwsmER �RDIIf RdT maeRs ra B➢Id4 R1iQld RTG6YI /1B D]NMf 6 L511 OW➢Ri. UL TIB EODRd[ ra DELS /,n ®os LAB. 0 MRIL s /A ImRRnR v Rar®u� s2¢ s Rtmm v Lsl Doman uc Ros mroausa■wrmn EAe WI Mr MR11 RCmf Rmoa ra mro11 RIIIICQmO 6 L91 Dom9c. 11C OI owam u � caiRl Rolm W.D Rvao1 IRaN BR 1aIT ams araan RraLLv[s RRmI swE s RDM Rmta k `\111111111lI//// A Li n 1CiQ O�/y� No. 76910 �p�•.. FATE P ;•�<v� //S TONAL 1, rHYM A OMM A 6a[ .m RRe LOT 1051 RDA S-4 40 REMOVE & e ENTIRE CAP NEW VINYL OR a -KING PILE COMPOSffE SEAWALL y Permit Number > W NEW WATER (OPTION A) 0 G PILE .MAX ItE4TAl1ID IN FRONT OF EXISTING CONCRETE WALL z OPTION A 56-0124866.021,022-EE „ YTOP OF CAP 1 w < o Southeast District y o q WATERLINE ERLINE ELEVATION NOT TO SCALE ASSUMED DOCK DEMO 4 - ♦a RECONSTRUCBON AREA X < v s a - = 200 SOFT NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NEW ISLAND 9803 S. OCEAN DMIE JENSEN BEACH, FL 3057 IMMSM ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW 0— SauLcv4nD STUART, FLORIDA 34994 772.2213 4601 _.CSM•E.— To w.un, rle t014 m LRQ6 RrID0DGa1 RFmL 11 b M IERRIW V �FSmVI STLRL 6 fllRlfff CRI D®R4 UP /ID S Q W S INA III—. RN WI Rtl rRG UO[GfROIf K Qiml AA1[It000 � pl0!>Slt4 u< = DOmm uC aPI1RLU 02® MnES R mDems I A' t p ` ft- , ` �GENSe v No. 76910 0 STATE OF i •.!-CORIOP.•.\�� ZONAL LOT 1052 S-5 w TOP OF CAP 0 a WATERLINE ERLINE REMOVE EXISTING DOCK AS REQUIRED. USE EXISTING MEMBERS TO RECONSTRUCT f: PLAN VIEW NOT TO SCALE REMOVE & REPLACE NEW VINYL OR ENTIRE CAP IONG PILE COMPOSITE SEAWALL NEW WAIFN (OPTION A) —0 8INSTALLEDC. MAX INSTALIN FRONT OF / (OPTION A) EXISTING CONCRETE WALL ELEVATION NOT TO SCALE ' NEW SEAWALL SYSTEM "RAND CANAL - SDUTH SIDE NETTLES MMD 9803 S. OCEAN DRIVE JENSEN BEACH, FE 34957 C S M ENGINEERING CIVIL - STRUCTURAL - MARINE CSM ENGINEERING, LLC 20B SW 01— I'll— I STUART, tt Ron 34994 777W2-220.4601 .CSM.E.NET CERTIFICATE OFAUINCRUATION: 29057 M UOmI N4®f 061ES4T x9RN 16A61 �Rm IAL dart«° R110 ROBM aRRi 11�xxs xa Ro16 ME ICE ro ff icimlOA.91 0m CT O .69vm ro A TW x M1 mlcl OI x4rJ11 RNi�1Tii Rmour Iv mRRee M Oa® iBml R7ae301 MI m16Rf 6 C91 OamiG UL 116 mCiI�L M C0.j NO ®6 N6FAV0IfiIDL a xl xaxnsT v aOe�x. v� a aavm v m ua®mCmxBSlCfma119AxRIYLax xxn aacn V = Down Lc uG = 00RUM UC Lvnmrt OM OT e y � a Permit Number > o r 56-0124866-021,022-EE L i O p Southeast District y d A Y ASSUMED DOCK DEMO &�O, RECONSTRUCf10N AREA = 300 SQFi NOBS A achomns A.AGENSE'•.• ✓ i No. 76910 �0, STATE OF •:(/�� sSZ�NA1 E�G QVR6 A a1R0FN 11 6OE xr rc LOT 1053 cop 5-6 WATERLINE PLAN VIEW 140T TO SCALE REMOVE & REPLACE ENTIRE CAP KING PRE NEW WALLET (OPTION A) �m B' MAX (OPTION A) ELEVATION NOT TO SCALE EgSTNG DOCK AS I. USE DOSW i 70 RECONSTRUCT NEW VNYL OR COMPOSITE SEAWALL INSTAUED IN FRONT OF DWNG CONCRETE WALLS a 0 Permit Number 56-0124866.021,022-EE Southeast District �+ 1 0�� Y .O 110y . >l3 •A1� ASSUMED DOCK DEMO & RECONSTRUCTION AREA = 250 SOFT NEW SEAWALL SYSTEM BRAND CANAL - SOUTH SIDE NETBES ISLAND 9805 S. OCEAN DRIVE JENSEN BEACH. FL 34957 C S m ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW OCEAN BOULEVARD STUART, n R— 34994 772.220.4601 —v.CSM-E.NET rls Rcl0u[ IY a s IRle ND llm. ts008m Ri2A lemenolt v R>itt90N DI6q s RSFTIf or ISY ums3a4 ue RD D v 1D fE uRa o NSL DI M DIR Pll AA Oeol flL6T �ROR 9E g1ID1 lMIWI®R B10OR9C UL BI SSG YC �®If t3® Im A W0E7/1S ��,'.•' ,CENSF'• FiL � •v V' No. 76910 j_ �Q•'• STATEOF•L(,�Z .!�iOR.... ZONAL Y'e OPR6 A WIZOEEII Jt WE mr TAT 1054 m� S-7 WATERLINE REQUIRED. 0511N USE E7G MEMBERS TO RECONSTRUCT PLAN VIEW NOT TO SCALE REMOVE & REPLACE ENTIRE TAP IONG PILE NEW WALER (OPTION A) �® 8•-o'O.C. MAX (OPTION A) ELEVATION NOT TO SCALE NEW WM OR COMPOSITE SEAWALL INSTNIID IN FRONT OF E]OSTING CONCRETE WALL UR AY S i r Permit Number 4 56-0124866-021,022-EE \ �\ Southeast District AMUM DOCI( DEMO RECONSTRUCTION AREA - 250 SOFT ti NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NETRES &MD 9803 S. OCEAN ORNE JENSEN BEACH, FL 3057 CSM ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW OCEAN RGYLEVMR ST—T, FWRIOA 34994 772.220.4601 _.CSM-E.NET CERTIFICATE Or AUTNORLEATION: 29057 M RGIE01 lO®f lERRT x3A45IMRA OROI IR1R)�RAQ IN N H ROfIDCG. OWT>9tIFS� W ®m urMm Rxlr x ar RAI OI Y41RA Rw9nol R00R IR4 Rr)Nc M [m®sRiml RA6301 xo mma v m OOmRq u< T16 omlm¢ M m14 RR ®8Im0011om I6RL M ld rswsmR v RO1090R aWiE 6 TW WI v mlRoaoc ue AORxs•m vumAreuEur R9 IUI M CRRI IW I SKL M rRmII MIC4lAO1 v dl OrROAO.UG BI O�R4 UL !»RIDR l3® ®oI R:OWCE pYia f46N R: 101T LaB M R:OWCLS E S9110 AS SORT I RR.¢r A ```IIA1111117f///'/ A. DARO V' No.76910 i�Q••• STATE OF ���(/�� GWEFS A OI.M JR WE LOT 1055 .er S-8 CAP WATERLINE ERLINE REMOVE DUSTING DOCK AS REQUIRED. USE E)OSTING PLAN VIEW NOT TO SCALE REMOVE & REPLACE NEW "M OR ENTIRE CAP COMPOSITE SEAWALL LONG PRE �NLl4 WAIFR (OPTION A)�( 8'-0'O.C. MA% EXISTING IN FRONT OF WALL A) EXISTING CONCRETE WALL E LEVATI O N NOT TO SCALE S V• e a a Permit Number 0 w 56-0124866-021,022-EE - e 2 o Southeast District RECONASSUMSTRUCTION DOCK OARS & � RECONSTRUCTION AREA a g 4 Y= 9— = 250 SOFT NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NER ES ISLAND 9803 S. OCEAN DRIVE JENSEN BEACH. FL 34957 I MMS M ENGINEERING CIVIL - STRUCTURAL . MARINE CSM ENGINEERING, LLC 204 SW C— BOULEVARD STUART' FLO— 34994 V•/2.220-4Gal —.CSM•E.RET CERTIFICATE OF AUTHORIZATION: 29057 M ECNEI N9ER! EPaRT IFSrAS IaMR 000I —,Rf- ,RE 1G,amEx,N, 11iQ MIa MO macsm LEIIDRER wwf sol DyfA QI � m Ert>IEn nor ■ w RRRI u RR®1 wwenxR Rmwr rw mvnm nE oTxss mmt {6]® MO 0®If 6 ®I OOmSf uC i16 RmYIIG M ml5 Rl1®a LE'JdrpAFD 16IDL AS MI IaRRdf 6 RdEER,91�l 9aLF a RERWT Q a oommr uR RE a m ro a Lau a ILEu d■ FXH RR MT OCd D,N m R[ RdlRil uRwRo v m dam. uc Tat ENOMM a L I= 1120"RED RFOLYR6 51I9EI ptvl BF lva me am®aeM E sAe As sod Baer k ......... ��.• VCENSF'•.• v V' No.76910 �Q •'• _ .STATE OF •' !(/�� ONAL CWAES A 10.®F11 .dt lWE n Ivm LOT 1056 RETk S-9 NEW SEAWALL SYSTEM '1, ` �3�"�' �;•, $r rr.5 T {` •` ��� \`e GRAND CANAL - SOUTH SIDE NETTLES ISLAND '. l-L�-..'; - I Z, .�/ ae `� - 9803 S. OCEAN DRIVE 1.- i;--C-+•Ef,4'`iv..�.. JEFLSEN BEACH, FL 34957 rm S M }rry"4 ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC - V f 208 SW MCRAN 90ULE-RO STUART, FL— A 34994 772:220.4601 www.0 SM-E.HET _ CERi1RCATE OF AUTHORIZATION: Z9057 f VE 9v°P NT®!OR\SS4T xr7AE GEYC]RW LLr �91D ORfll ROHHT IRilli RN6 RO m�xa xE Inr ro a RnmRm avmn, ma. a I:� � 1 � � i � A�muxxnwMmxwxRaalrxa - , nw9sn vlWr R>ff RRagG 11E 05II9 Rz1ERx t .p j R11�1 NO G16r16 CR19FH�04 9C •� _ •• - -\ ' � � � , _.. / � ,9 3� � 3 T6 000YMt 11E m4 A`>J ®6.@�FU IE16)L it !y 9 at•u�c luoA1°a�iorroa�6x maEms REMOVE EMUNG DOCK AS a • x \. Ana "'isml mEm ucr°� "r3 ! REQUIRED. USE EYJSRNG \� MEMBERS TO RECONSTRUCT \�\\ al 9o®e. ue osnmlr e2nR xmes a eaL�xls PLAN VIEW , NOT TO SCALE tN•c ° x 4 �rQO 2 R� * 3 e s REMOVE & REPLACE NEW VINYL OR M KING PILE ENRRE GP COMPOSITE SEAWALL "ON q Permit Number > xL mcm 3Ru 9: wsEnxnr ROR Inc NEW WALER (OPTION A) ®8•ON A) MAXCOMPOSITE IN FRONT OF ° v'�iu ummaR �r Rx °E (OA) EXSTING CONCRETE WALL = 56.012486ti-021,022-EE ti > > d arias xxosm ruwlro u'EIT`xau TOPS CAP p Southeast District y y„ n. � A styU a 3Em1 15sEQ A AMED DOCK DEMO & a A °°� \�S1 E DA S"RNSTRUCRON ....... = 300 SQFT QS' ocENSF' .Fili i No. 76910 WATERLINE ELEVATION STATE OF NOT TO SCALE A1.fill1""�.�` C1WEi5 A [W�Fa AL 6eE LOT 1057 �A S-10 r PLAN VIEW NOT TO SCALE REMOVE 4 REPLACE NEW VINYL OR BORE CAP COMPOSITE SEAWALL p NEW WPM (OPOON A) INS,ALIID IN FRONT OF 9 EASHNG CONCREIE WALL/O TOP OF CAPI a 0 a WATERLINE ELEVATION NOT TO SCALE LC56-01248666-021,022-EE vtmber'ILE D'O.C. MAX i ,022-EEXAistrictalASSUMED DOCK DEMs - RECONSTRUCOON AREA = 200 SOFT v NEW SEAWALL SYSTEM GRAND CANAL- SO LITH SIOE NETRES ISLAND 9803 S. OCEAN DRIVE JBISEN BEACH, FL 34957 rm S M ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW OORAH BoutE— Ro ST—, RORIOA 34994 772-220-4601 W Ww.CSM-E.RET CERTIFlCATE Or AUTHORIZATION: 29C57 vEIN 9[ItDI NAO! OiHIIT RS@hT O1RO1 NENE I•R IO ff BISmIRq C/i4A NIIt OI NO ANil9IID 2pRNMT NEI QI YNQ pY�t➢ o 03 Ef4 TSI D OE M U , R]I®1 //0 0ff1T ff B10l9IBRG IIG w LOOMM M Q1K p0 ®a ocam= a= tl M E6LRICP ff aRFS911141M[ IT R61AiR ff OABllIIC N0 NNaID p:l�NpYE CI■ PART 0.WG NLnOB®1 T CRdDOE®p11Wf 11E It0N1 0C =D-10a ILLS • NaTES A C0100 S amm eeoRRo ai�R a"r• soup RLFIIR ```AAL1111111f/,f�, V' No.76910 �Q �•• STATE OF �.((,�� CKYM A DNW A a11E R»® Rptma mm LOT 1058 r S-11 PLAN VIEW OV env NOT TO SCALE S;yrt ,�O* or e y REMOVE & REPLACE NEW VINYL OR ENTIRE CAP RNG PILE COMPOSE SEAWALL q Permit Number r• A 8'—O.O.C. MAX NEW WALFR (OPTION A) INSTALLED IN FRONT OF z 56-0124866-021,022-EE ti - Z3 _ OPDON A E)(6RNC CONCRETE WALL � 1 p TIP OF CAP 2=- ^_'d -- _ -< _-- - - _ - - - - - a-. - - WATERLINE ELEVATION NOT TO SCALE NEW SEAWALL SYSTEM GRAND CANAL- SOUTH SIDE NETTLES ISLAND 9803 S. OCEAN DRIVE JENSEN BEACH, FL 34957 cSM ENGINEERING CIVIL - STRUCTURAL • MARINE CSM ENGINEERING, LLC 209 SW Dc" SOUL-- STDA0.T, FWRIDA 34994 772.220.4601 —.3M-E.- 116 W1DD. M DDS Ml lfiD6 RInNiRR ISmI p M 16NROR R (RD69lG 4RYLy D (RStRII li OI B[✓ImOR' UC M] D Icf ID ff USeA M !p! 01 ■ M�IIIa ®1 O BI SO®fq IIG �ff = Doom uC TIPIImU.]C10 Isms A CalomMa 11 01 Sout east st et y � aw Rf.ILVWt9 oMnM y y nine pam I rtMk °ti ASSUMED DOCK DEMO & RECONSTRUCTION AREA\• 0S ,.... •. ROF ''.: =150SOFT •'�10ENSF'•., v No. 76910 ' LY; �Q •'• STATE OF .: �,41 IORION ''7,,; ZONAL E \\\\ =: A DVmNM M 69E LOT 1059 �R S-12 REMOVE & REPLACE ENTIRE CAP 10 TOP OF CAP WATERLINE PLAN VIEW NOT TO SCALE -aNG PILE 0 'OC. MAX NEW WALER (OPTION A) 8'-0. (OPTION A) _ _ -� 7 ELEVATION NOT TO SCALE NEW VNYL OR COMPOSITE SEAWALL INSRM IN FRONT OF EXISRNG CONCRETE WALL NEW SEAWALL SYSTEM GRAND CANAL- SOUTH SIDE NETTLES ISLAND 98D3 S. OCEAN DRIVE JENSEN REACH. FL 3057 CSM ENGINEERING CIVIL STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 BW OCEAN BOULEVARD STUARr, MORIDA 34994 772.220.4601 VAV csm-E.Nn cm IACATEOFAUTHOR=TION; 29057 M OOOf IOFRf fW[sYY ROLNE INi(II mIM IA 0>RWY211D wDRWII ROIR M4 RN6 ND orre 4c xm m v RORmIDL ommL msm, v ASmm) m AYT VRD RAr s RxT mlR1 a INRmI Ale�Ol �IIOR 1R6f ®D1R0 M OAN RIm611 RAa�l4D mmU v m 0®44 u< ➢6 ORORQC M OBS AlO p®B I�Am MAIL, a r IBIIRRIR n Rn15mRL �mG D RY4AT v m Oaml4 UC Roe mmBL U:RMRIGLW a ILA Idi IMT m W RUST. tORRFItdo,M RRiml 4mnmRa v Buc m BU(lA Uc DNIWI elm ASSUMED DOCK DEMO & `\\\A` p, s PAVV/�i� 0�( �i RECONSTRUCTION AFRA = 250 SOFT �� ``�-,.•... `t`'' V,IOENSF'••,� • v V;' o• sH �i 6�t' No.76910 _ ~ +a �pQ ••• M Permit Number STATE OF •' ((�� • �� '•.,F(ORIDP, o •' \�� 56.0124866-021,022-EE 1 < o p Southeast District y CU96 A MWI A adE 0 p y bo Flo®a �a a0ti EDT 1060 t.r v i a- RmA S-13 F t. 1 k ij --�' REMOVE EXISTING DOCK AS Fi . --^- - REQUIRED. USE EXSTING MEMBERS TO RECONSTRUCT n S !!! l ° I i REMOVE & REPLACE ME CAP RING PRE ® B'-0'O.C. MAX OPTION A WATERLINE PLAN VIEW NOT TO SCALE /-NEW WALER (OPTION A) d _ m .` - ELEVATION NOT TO SCALE NEW VIM OR COMPOSITE SEAWALL NSTAL ED IN FRONT OF DMG CONCRETE WALL a 0 Permit Number 56-0124866-021.022-EE i p Southeast District � A OT�.o Apr Y rit1R' ASSUYm DOCX "NO & RESONSLRUCIION AREA = 200 SQFr NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NETTLES ISLAND 9803 S. OCEAN DRIVE MISEN BEACH, FL 34957 rm S m ENGNEEING CIVIL • SRUCTURAL• MARINE CSM ENGINEERINGI LLC 208 BIN OCEAN BOULEVARD STUART, FLonIOA 34994 7•r2.2Z0.4601 m moRUG E EDPS Do o®s RmammR lW1 Ds DR ImRIOR a' Boamua so-s¢ a EI6We v 49111Yf8A6, uc AO a m m a lHq ■ Rwr 6111 Rie BP AR RROI BORR Woolf E tATRR RmOo.VW w m Essamusf = M DGIEIM U[: l!>Yimv — u NUO A COIORIIS I `\\\111111JJJJJ \•10ENSF'•.• No. 76910 STATE OF : • !(A�� ewers A Iwae11 sl naE I RIo1IE>Dli➢IY�I® F]Ym LOT 1061 Im! 5-14 WATERLINE— PLAN VIEW NOT TO SCALE t °'"�. REMOVE & REPLACE ENTIRE CAP LONG PILE NEW WALER (OPTION A) 0 8'-D'D.C. MAX (OPTION A) ELEVATION NOT TO SCALE NEW VINYL OR COMPOSITE SEAWALL INSTALLED IN FRONT OF DUTWG CONCRETE WALL v e 4 v Permit Number 0 56-0124866-021,022-EE t Southeast District \i ASSUMED DOCK OEM & Qo r., ♦ t e RECONSTRUCTION AREA = 200 SOFT NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NEFILES ISLAND 9ED3 S. OCEAN DRIVE JD6EN BEACH, FL 3057 IMMSM ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 20B 9W 0_ BOULE-RO 9T—T, FLORIo4 34994 772-220.4601 —.09M-E.RET CERTIRCATE OFAUTHORIZATION: 29057 M FMR10 RIERI' F8mi2! E59n61611a OYCL OOi6 N[N[ le 10 g R31m6A LLIRmlM40AA OI 4S97ER m Rn n®Rmr E Re Rai a eMRU ■I®LII Tmolf iF6T wlTEO M - A•7� R0 0®If 6 C910Om]611G b6 �L M W4 RO ®B I�MPm NR1. .0 M E9 R6®RL SfRR[ 81�tIDi 6 ml O-M Oc ND O ERWf LIm BE 19A E eEl[ al E 1/m RR RpRAELT�0E Lllml AmR16UL1W aI eomRE. UA Im6 & Comm ) a® eEou9D rum svc a 9fll IfNII k PL ............ `c qi' No. 76910 -0 �13Q,E�•'•. STATE OFZONAL ��i� 'S1 '.F<OR1OP. •' G�� IIIIIIIIWO OVRES A LWSDI R LINE LOT 1062 Rmk S-15 WATERLINE PLAN VIEW NOT TO SCALE REMOVE & REPLACE NEW VIN11. OR ENTIRE CAP IGNG POE COMPOSITE SEAWALL NEN WALER (OPTION A) O' 8'-O'O.C. MAX DISTAl1ED IN FRONT OF (OPTION A) EXISTING CONCRETE WALL ELEVATION NOT TO SCALE T►`�S O ■ It h a • a At Permit Number a 56-0124866-021,022-EE 1 { p Southeast District O' ASSUMED DOCK DEMO & ♦o 'TA r a �' RECONSTRUCTION AREA = 300 SOFT NEW SEAWALL SYSTEM BRAND CANAL - SOUTH SIDE NETTLES ISLAND 9803 S. OCEAN DRIVE JENSEN BECK FL 34957 C rm M ENGINEERING CIVIL • STRUCTURAL - MARINE CS ENGINEERING, LLC 208 SW OCEAN BOULEVARD S'UART, RORIDA 34994 772-220-4601 —.CSM-E.NCT CERTIFICATE Or AUTHORISATION: 29037 1H9 �L 11E 004 NO ®S I�OiOD IOq e w 14iRIBlf v matffiaE �TL a R6LWf v e9l Bomaa ue RDammauRlL�wEv■ nu w Re mER RBm Rnor 1a Emm Amvmml v ml tnlEoacD. uc LSI DCFEUK UC U—a tolls A CaBetnS aE1m v:olraa RIIm sJle As aul RAEO k `�`n�Qs. A•. aARp '�. ���•' VCENSF'• �iji �� V' No.76910 ' Qr FAQ STATE OF '7,',, 70NAl- CUIM A S{M .R 09E I m� LOT 10E'3 mk 5-18 NEW SEAWALL SYSTEM GRAND CANAL -SOUTH SIDE ISLAND 9RD33 S. �OCF.AN DM JENSEN REACH, FL 3057 rm Sm m / ENGINEERING �. CIVIL STRUCTURAL MARINE l CS ENGINEERING, LLC Eil 9 , MCEAF-11 3499 APO 772.22, -4601 34994 992.220.4..E CeRTI RCATr F CExTiFlCATE roF AUTN°PIZATI°N: 29087 M FIOia IL®r OwM RIDL616Au meW RETAOYE 170STING DOCK AS I �� 11E4� a REDUIRED. USE EXONG �m m xt nxo xmr ■ Mr wa a YRIB TJEMSTRS TO RECONSTRUCT IdJ®R M¢ lams a ml Illi6t34 uA 116 IO WX M.M M¢ DEWS rm%dJaD HIM ISM 1°xr°(f a art 41M[ B P6Wr a a uo�tq uc x°umro¢u9nxeoEmx PNS Im IRC mal x1R� x¢art M xEl2¢ M �HNi Axa� a ml Sal®411G _ N RIYFIDF TIC OYEOS oYW 1p 1. M xmrs a OOr715 PLAN VIEW NOT TO SCALE s Or tt Yf•OO E n 4 REMOVE & REPLACE NEW VINYL OR a Permit Number r 6 ENTIRE CAP COMPOSITE SEAWALL �m6 xM�TB I1w 'D.C. w NEW WALER (OPTION A) KI R'-0MAX INSTALM IN FROM OF w 5bo124866-021,022-EE r Iasomlalumms OPTION A EXISTING CONCRETE WAIL -KING PRE i c u EaRs room INSx ro nM xRrs TOP OF s - _ - - - a -__ o South ... I D10,1 t y +° ®En eetRwats ¢vaa mvl mrr ms a O uelmn ¢EtlARL9 OILIDI ap ), any S9F: a 9Sx1 xaex k 40 tArat� \���dl^/7��i� ASSUMED DOCK OQAO 4 AR RECONSTRUCTION AREA �� �,F;.•••'•...•. = 250 SOFT : QQ;•• aCENSO''�y Z No. 76910 WATERLINE— ELEVATION po''.. STATE OF NOT TO SCALE �i��S'•."t0RID?;.•' /iS �0NAL IE \\\*l OlVC6 A OVSD7 A OIdE xx: LOT 1064 �6 5-17 s WATERLINE ERLINE 7 PLAN VIEW NOT TO SCALE & REPLACE CAP W WNFR (OPTION A) /0NC POE 6 B'-0'O.C. NAX E LEVATI O N NOT TO SCALE NEW VWYL OR COMPOSITE SEAWALL INSTALLED IN FRONT OF E)MG CONCRETE WALL LPermlt ber 22-EE trictASSUMED DOCK DEM�svA CNSM DON AM NEW SEAWALL SYSTEM GRAND CANAL -SOUTH SIDE NETTLES ISIAND 9803 S OCFAN DRNE JENSEN BEACH, FL 34957 Immsm ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC Zoe BW OCE-1 BOULEVARD STU"T, FLORID^ 34994 772.220-46DI VAVw.CSM•E.NET CERTIFICATE OF AUTHORIZATION: 29059 w BD@ ItR n, ORiSIl! R30n61eAOl OTIOI lY O/IROIT NO COI R6mI RM fib[ RRa Ra Ul A[RWro 16mm-le aRmO A�®ro wrvRo nlm u xrt wr a two �ill'�ICIf RaT ouplo, �rol M® I10 0®If 6 = CRI FIGQIaG IIG 116 OmEUL M 006110 ®8 RD>bOO� IW1, A M I�IFIR IT aY®K RID$ a R09RT a Ci10O®f TIC Aaa Eflp B: LL9A NwREala ala Rll Mr IOER ARD.H l9Olf 1K F0m1 R16P�16 OO BI ®. UL = Damn u c—R — wetaR4n RR®1 Re s BRaI Roar k \\\0.�(.ti. `C JCENStc' •,y �� v VNo.76910 �Q STATE OF !(/�Z' i�� •'• GORIOP'.•' o s`,5�, TONAL 1V?.\\ OWES A UM M CAE LOT 1065 S-18 Ole WATERLINE PLAN VIEW NOT TO SCALE NEW VINYL OR TONG PILE COMPOSITE SEAWALL 8'-TO.C. MAX INSTALLED IN FRONT OF OPTION A) FXISIIN C CONCRETE WALL ELEVATION NOT TO SCALE REMOVE & REPLACE /-ENTIRE CAP NEW WATER (OPTION A) z r� ASSUMED DOCK DEMO do RECONSTRuanoN AREA = 300 SOFT 4+`•4 o• ■1i,#' • Permll Nvmher 5"12486°021.022-EE Swath—tllhtrkt y o ?♦ •° ° •a�aN' NEW SEAWALL SYSTEM BRAND CANAL - SOUTH SIDE NETRFS ISLAND 9BD3 S. OCEAN DRIVE JENSEN BEACH. FL 34957 csm ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENSINEERINSt LLC 20SSW OCEAN NDULEVARD. BTUART. R RIDA 34994 772.220.4601 —CSM•E.NET ce"TIOATE OPAUTNORISA710N: 29057 96 RODMIL M DOR NO �61RA1DmD IER2L M M N2•ROR V flY®Il m010: N N68D'! O OI OY®Jf: 11C M] N m A lE 194 NlOF M N NYD WI MI WNI R06f NRmf M NRmI aRo®t v m IpmR uG w OOmMa ue ®Ilmq m `\`LL 111I Jill,, PL DAP �` �•' VICENSF' :�2 �� i v �No.76910 J� ��0 STATE OF C(7�� �"'7iSZ�NALY0\\�� OLMES A Sim it RAE EMaMNsrola9mat® LOT 1066 �• S-19 '� �• ____ NEW SEAWALL SYSTEM DRAND CANAL - SOUTH SIDE NEEIlES ISLAND 9903 S. OCEAN DRIVE JE7SEN BEACH. FL 34957 ' rm S M \�, ! ENGINEERING CIVIL • STRUCTURAL • MARINE t •,` — - CSM ENDINEERIND, LLC ze uw accAN Boul[VMo a STuaaT. FLa— 34994 772.220.4601 www.09M-E.NET �� COERIIFlCATE OF AIITFiORISATO�NA:p29047 U■�>olflf MlapOmTRWR /0 -M OIM6 MC - m m EE RaRmca OYRL$ a■R4 ■1 0YYIRR ®ls9mm1MM■AR E R[I<ffi 6O�CRI�U 11li ®EQE 11[ m5 MO ®6 ImM® IE>R r4 M M9■EEllr R R6o$Il SFME a /10FAT � ( m aomaua ■semmou�■■ora■ Ma wl Mr mn palm ■near n■ ■Rm■ ■mOaf®16 C9100ml.. Ua dI F1YFmG UC a3'm0 omm PLAN VIEW Att 1 NOT TO SCALE r NEW VIM'L OR COMPOSITE SEAWALL INSFALLED of tp>, IN FRONE OF EXISONG CONCRETE WALL dt KING PILE A 8'-WO.C. '�� �4 n ohms RRRE o rom ■TIE R9n o>K REMOVE &REPLACE MA% (PILE A) e % � 6> �eL �omE RR N ENi1RE CAP NEW WPM (OPDON A) r a Permit Number > umRls Kamm pmomnM pas amm RECTAaFs REaRII anal RE M a■s jO M TOP OF CAP - 56-0124866-021,022-EE I Y StAe M9GRI RaERk e � Southeast District A `\V11111111I1!/!� NREWNSERUCTIODEMON OR tsrat� G: ••.� % � No.76910 —WATERLINE ��Q '. STATE OF ELEVATIONF<OR ••'••...•.••IDP,.' NOT TO SCALE i S NA%% \ I 1 % NN9FSA W✓flFA,O aVE LOT 1067— Rmk 5-20 z TOP OF CAP 0 a WATERLINE 11 NEW VNYL OR COMPOSITE SEAWALL INSTALLED IN FRONT OF EXISTING CONCRETE WALL -NEW CONCRETE SPLICE NEW COMPOSITE SEAWALL INSTALLED IN FRONT OF ENS= CONCRETE WALL PLAN VIEW NOT TO SCALE KNG PILE 0 4'-rO.C. MAX (OPTION A) ELEVATION NOT TO SCALE ENTIRE NEW 6`02TONCRETE CLOSURE =3 ASSUMED DOCK DEMO 1, RECONSTRUCTION AREA = 200 SOFT a 0 Permit Number 56-012486&021,022-EE i Is Southeast District es 01 NEW SEAWALL SYSTEM GRAND CANAL- SOUTH SIDE NETRES ISLAND 9803 S. OCEAN DRIVE JENSEN BEACH, FL 34957 Imm S M ENGINEERING CIVIL • STRUCTURAL . MARINE CSM ENGINEERING, LLC 20S SW 0—H SDIILLVARD STUA-, lkl mpA 34994 772-220.4601 —.CSM•E.., vc omrRt ra 1105 wo ®ti wmswnm Nlml Al a R—M lI wa3 melt[ B Tf"'em, a t9 F--o tuR wpwEWlEUALw101®w twa la wo mtw xaEsr roar ra wilml Amua®1 v m IIOmD4 uc =13 .. mUcemmD — wTiS A E01001113 `p`� g M �.\ ' _%GEN$F O�itiv� V No.76910 0 STATE OF ((�� YONAL OW6S A [RAW .2 sa m— LOT 1067 eA 5-21 Cf Y11 ®5�� Ik4al.2 la ry3LaBB SG-950 Allowable Moment (M) 15,147 ft-lb-Pt 67.37 kN-m/m Section Modulus (Z) -_'- -_----56.8in3/ft--- - --- - - - - 3,054cm'/m -- - Moment of Inertia (I) 341 in'/ft 46,567 cm /m Impact Strength 17,500 in4bs/in=-----3;063TI-mm/ -Thlckness 6)-- 0.715 in 18.1 mm Section Depth 12 in 305 mm _ __ __ _ _ _- _. _____._ Section Width .. _ ___ _ _ __. _ 18 in _. _ _ 457 mm Material Weafhercble Rigid Vinyl Standard Colors Grey, Clay Technology Z Profile, [-Beam Lock, XCR" Standard Packaging 6 sheets/bundle lLt e* fit\ S Y PErmFt Number 0 56-0124966-021,022-EE 1 e p Southeast District �r Y.L 9, w.,�wrunm,.�w.a'-.smnaea.xM1o:.ys�o �c �.r. ne.mcve•.c.mrsnE,..•.r..ec,r.pereor,car.u,rms.m•.oe..,r.nR�.m.re,wm-.mrr.,r. r.SDMamt.ei,s:..,..smza.�aE°6.Rr-°, y.�mn-,Imam;orr.r�,..aaame:.ar..e�.wnr�asw�.•.aeru-.L�n.,<cs-.a:•».cw•r.r.ear. 6FFe�yy•r`a;`%'�mor.a,�c,.,re.mem•q�.a� .. m.wusw,.,aM..m..aead.m•,Rrnrnmremt� REJ.�lYC LR0.�[51YSi$LriSdLF1Nr:S.tD.6ai'1?DR31t�v14a?Xk4�3d69PVm.e,me R.tm^sMS�[v uatdfnm>. Exrtliccom NEW SEAWALL SYSTEM GRAND CANAL - SD UTH SIDE NEnIES MAND 9BO3 S. OCEAN DRIVE JOJSEN FL 34957 BEACH, �m1 m iAimoiWaio rm S M m Dmtpmmte mdllla—in uod� ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC UC-6 STR 20e SW L1cEAN BOULEVARD 34994 772-22, -4601 772-CSM-E.NE Wale W W W.CSM�E.NCT CERTI.. Or A...I.CIN: 2905.7 9[ Trnml lEmr mWS4T � NtJIfA PYYI In pROiR Np mp rmvar Ra11S hEII NMp NO mroa mmNR TR ff Id➢ ID®. Win®. I-Im 01 A� A Yr a� NAR N Nr WIN m IN■R pl®a pRaR Hat tlpap M F41ID pmFrr I Max Allowable Deflection ____-_ _ _ - _ _ ___ _ _ __ ... __ _-_ __ L/90 ➢B paper, ih IA4 N0 [E4ie 10N�p®IeDL MYtmap0a 6Aa159wSflSa 7�4pTR -- - - - - �___ - -- - -- -- -- _. ___ _ __ ._ _. - _.__ ___ __ ____- . _._--__ _ ____-_ WrWalaapRloral rwt lm Yrwp ROWTpRaa�ccaml� Max Allowable Point Load* --- - - -- - 15,000It, 66,723 N -:: -- -pWm� am Boaaa uc - Apparent Modulus -` _ - -.- 3.5x-10° psi-- 24,115 Mpa_ ml mmpc m oortmv rr® -Moment of Inertia (I)-- - - - - - - 39 in' _ — - - - - -- - - - 1,623 crri-_- - - -- - ` - - -- --------- - - • Material- FRP Composite Compatibility _ AW 2.5" x 0.75' Rod Kit, AW 29" x 1" Rod Kit Recommended Accessories 90' C6rner Brace-,45' G 9U' Uc-G Ccihd� lnserL "-- - BeV_eled PVC Washer,.CNybn PIa1e Washer - Standard Colon: Charcoal MJFES a 1:011hum Standard Packaging 20ft UC-6 Wale, 201t Structural Insert, SS Fasteners - - - - - t , -- - *when used with 47 x 4' washer 6„ -- - -- - - --- - -Deflection Allowable X-Allowohle UnUum_ Load iwl/lt) _ Pon o �;; Uniform load (ft%-1' (Point Enad) y - -- - - - -- - mom ffamUm6 __4___. 375'0- _ _——_ -_3.160 uL sdn 1oR=I rWlm n.."— ROM MSop iSam.Tk - 7k _ii_592 1C1I11% 91__-.r�_.__-— 555 -�16 ,oeo9r 33 -20 1i1,,636679 AII- -_111 608 1; 304 1 -20 `152 ' _-12 11 - 1,250 468 -1-234 1-6 _ 117 `sse_`'I ,'� "', �� \,1GENSF ' .•y ' � •• '•�� i tits+_== lea i39" W - ." ;.-ii! No.76910 ;�-14 •' 1,-071 _ -_295 '�; -14� -"_74 _ 15._ - - - 1,000_ _. _.240 120 _90�- 0 '• STATE OF �Qj` �� •'• • CORIDP.F'• \?�� G '�� S/ONAI E \ �=r�e�r�a..�..�.�. Rti-...� a. �•.m�r�a�aa.D. �..� re.w,.e..�. tt��pPoeyynNnnr.naaf.YfJyf.®bait.GlwL'm.mr.O..4eRMrT.OfvOea•.I�wC'I�ma DR-�uaaAenlnv Som•�wbnSf9r+r.f •.Dtl�a.sl9.M1aC.hL.t.a�e•. e9UiF�r a$a/%a� is'9IrJ�611Rci�mtaerv�a;rwx Aia�ii�taev.sans.mwm.�or�mucc��iau®.�ewm.�.m,aDv�sa�seua�. / \" /ll1111111\ CM11C.CDm away A 9rme1 4R WE p` SPEC00TIONS am' D-1 Cm1Cnm matiftle 0 UlttaCndPilo to Slant Piling and PII® Updated November L 2014 UC-75 Allowable Moment (M) 31,667 ft-lb/ft 140.85 kN-m/m Section Modulus (Z) 38.0 in'/ft 2,043 em'/m Moment of Inertia (0 266 in /ft 36,325 cm%m Thickness(t) 0.400/0,430In 10.2/10.9mm Section Depth 14 in 356 mm Section Width 24 in 610 mm Material Structural FRP Composite Standard Colors Charcoal Profile/Patented Features Z Profile Cf �11 V UltraColiffm e slmtPmlg.wl>ila Updated November 1, 2014 UC-95 Allowable Moment (M) 48,750 ft-lb/ft 216.84 kN-m/m Section Modulus (Z) _ 58.5 in'/Ft 3,145 cm'/m Mamentof Inertia(]) 497 in /ft 67,870 crr/m . Thickness (t) 0.540 in 13.7 mm Section Depth 17 in 432 mm Section Width 30 in 762 mm Material Structural FRP Composite Standard Colors Charcoal Profile/Patented Features - Z Profile - r Air it Number 66-021,022-EE L e\ Southeast District GfyosC,rtcataFaah>'femysaus_TaumrciensexC.ri,uw.0 iFuannc+tnR9.Ju"ydJt'Ma.aw>fsafGEw,eeve[ EesF�Gea.R!9raFfurnlffcaceryrcgss¢FJ as �3aw9v¢aeMr:gblaes•gaaoe_ltm+.nJcama•�Mz.4aa+nFrAtaM w-JWItMSS�fap�e5.a!nbv,ra' baKAenhanW �tveaemJnm�o .nFile+l?-.a<Necry 9w!M1H!ib.m::rFYao 4l+T. N.!�em6m.!cr�m!.pTCsl9veaf.4vY,�C t✓atu+l a.Tlus:Crz:ati+��4?'iRrk:K 4seW�: bsvahn3slR"SarmvbII.�r�.`n9a.%.a+.b.uSYSx:4Cls-,tatW oe�;e/.al.Un LeM.9atiP.f�>G+N r1nHF4e:+l.ro.Ar-ig4vaF¢t:4tic,F�a<is', Uelve�av";fWp'yE.feh.daue ewFwe'R{Frsar!.UST¢YLl,erv¢.`¢ffi.�ExaB�iy^.tbts/moseLEav5M9Pup14fLLLLa1'u>Iu. F_xla+Tl:artf9f+^SOsu,w: 4T-14mae^LEk�iEY+>ral¢EfeJmaaaelaRi-,eUY+OlIIttae ryISR¢yLiQea4.ty'ft6taete.w>u.FxvaYiv.a'4En}KT11imn'�cv,IMun9xl;Jim++dvu: ,M4'V.1H.eMa===l4aTvaSYln`V.f.:+a+.'u,L.YnnCT:'.FmvRfiKv3t4•f2.'v IlWIfgH,?¢4ae•gly4:>Sa.�tn.,Le:yriq+l--OaaTuwCldaM 4mhoed>�CS?NPaye.baaLtcpTra`.et'�'4«awTif.v+a•z �lTa+L-E4fap`.46.Yme'¢aPo,laNdl¢9:.La `49+afm,klaq dxT49mPW'v.afW eftv.rf avelm, am+A341aWA1�aJ4ZRSFt4tdJS¢LF-tilRi �ti E.C.IF.A.FCS,flRm.i2R5�/: naee:¢a. r.nr�mvwu,zveavae baa.tra Y� ..FbP—wrvAfefnata:Vat3:iQ+lftL iAlE>.'bia':6'll�.:+EE+feiTn ;SL,TFIY,: ASSIEI :Itl).^. a. Tl6JF TIIa:3IT3SiGtSi'1a�35FVfu2EfltZJI:PSl. h19:i1Sam b0�arl. 0^'++30£.HVrsiRt+olltcE:.e:e.lyl9.amc ]II4.�R;RS�: 39iRS»5`fa 12 ^.ie:_rilM'..11.23a:.Yx Tci 4feGe )£'C,alvlxce YG-sbaelu FFa:pw. CM11c = cm1111CMM 1) NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NEn ES ISLAND 9903 S. OCEAN DRIVE ,ILNSLTf BFACN, FL 3057 rm ro M ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 20a SW OCEAN BaaLENM9 SNAw, FwFU A 34994 772.220.4601 -..M.E,NET CERTInCATE OFAIRMORILLTION; 29oS7 IK 0om1 IWf 86164T /13Wt7 NNG mR01 IR• ®1me NO mR41 aeBT FWIi '*a' WN9 ume tee Rm m a reRmiuu, 9w®. ann. a tmna m ur nw ner x to rox a waa � 1B10R le6i ®IRO M D904 xRml NDI®1 AO LVRIB 6 BI EIA1FaRO. 11G Ix5 CmIW. M C0.4 Aq C®e e0� OA1l LS M 16➢II®B 6 flZikk1ID91 SA1R 6 RIiFWT 6 mI D®msu lis An B im m a uva x LFO! a x Mw Rx to aom RID6T xnort 11E xeml ABM%FQ16 dI DDRi9S IlG = 011911G"m,VeaT= WIES C COUDITS \,\CENSF • ,!y V' No.76910 ��Q •••, STATE OF : • !(,�� OV1ES A BRIM JR DUE e—,tee® SPECMTIONS. m� D-2 SEE CAP DETAIL SHEET INSTALL NEW CONCRETE CAP ENCASING EXISTING AND NEW WALL; -- INSTALL NEW 6" WALER INSTALL NEW CONCRETE KING PILE 0 8'-0"O.C. MA) INSTALL NEW VINYL SEAWALL PER PLANS. A LARGER SIZED PANEL IS TO BE ORDERED, AS NEW PANELS MAY REQUIRE CUTTING TO MATCH EXISTING PANEL HEIGHT FOR PROPER EMBEDMENT. —LIMITS OF EXCAVATED SOIL INSTALL NEW 2)k"0 JET FILTER 8'-0" MAX. ON CENTER WITH REPLACEABLE FILTER CARTRIDGE SG-950 SEAWALL (a) KING PILE SECTION - OPTION A \�NBOARG N. �NGG ONNRRW CAP PANELS BE REMTO EOVED 4X12X1C2ur ��/R� ER./\\\NEW/SEAWALL P/ L. j\ (2) 1" TH EADED ROD�`c.� - ���/���/�'/���it��/� NEW COMPOSITE FILL VOIDS WITH NEW STONE k CLEAN WALE PER DETAIL f- 857 SILICA SAND PER PLANS NEW KING PILE I ;'V4 PER PLANS �1w4 — 013MPE351TE SEAWALL PLAN - OPTION A SCAM- , 2 - 1-0 j SEE CAP DETAIL, SHEET D-5 INSTALL NEW CONCRETE CAP ENCASING EXISTING AND NEW WALL' INSTALL NEW WALER MEAN LOW WATER EL - -5.00 INSTALL NEW VINYL SEAWALL PER PLANSI `UMTIS OF EXCAVATED SOIL INSTALL NEW %"0 JET FILTER 8'-0" MAX. ON CENTER WITH REPLACEABLE FILTER CARTRIDGE EXISTING CONCRETE TO REMAIN SG-950 SEAWALL SECTION - OPTION A S4a 1 4 - 1-0 SEAWA (11) #5 LONGITUDINAL ® KING PILE, T KING PIL #3 STIRRUP 0 24 CENTER ® BUMF 6" UK (13) #5 LONGITUDINAL REBAR a _ I% f ' I- BETWEEN KING PILES, TYPICAL : - - 1' / . •i -- `i- CONCRETE CAP PLAN C� - 1'-0KING PILE - OPTION A SIRE 1 2° " NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NETTLES WAND 9803 S. OCEAN DRIVE JENSEN BEACH, FL 34957 C s m ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW OCEAN BDUUVARD SWAP FLORIDA 34994 772.220-4601 VAVW.CSM-E.Nu nc ominu vc ws q0 oE®e Lmwaa®xwl a M ItmOlmO v ROlS�.L slnRc a 86lBT v m L>om04 UDwaRmmau9A NRIt1EOM NAf RH AK Don 8o6f RmoR M R10all AmlmAul v m DOEa3a ue = 8Laf m m aLAimP - A. •........ Q� . d V' No.76910 ir �pQ •'• STATE OF � • !(/�� CMMS A UM .0 BUE SEAWALL DEAILS- OPTION A 0-4 SEE CAP DETAIL. SHEET INSTALL NEW CONCRETE CAP ENCASING EXISTING AND NEW WALL�j TOP OF CAP EL - +0.00 INSTALL NEW WALER INSTALL NEW CONCRETE ` KING PILE ® 4'-0'O.C. MAX MEAN HIGH HIGH WATER EL --4,00\� MEAN LOW WATER EL --5.WWA�a= -5.00 INSTALL NEW COMPOSITE SEAWALL PER PLANS LIMITS OF EXCAVATED SOIL INSTALL NEW ZrO JET FILTER 6 8'-0• MAX. ON CENTER WITH REPLACEABLE FILTER CARTRIDGE EXISTING CONCRETE TO REMAIN SEE CAP DETAIL. SHEET D-6 INSTALL NEW CONCRETE CAP ENCASING EXISTING AND NEW WALL TOP OF CAP EL - +0.00 • 4 4 a Permit Number 56-0124866-021,022-EE i p Soulheaft District ti UC-75 SEAWALL (a) KING PILE SECTION OPTION A Sru F. 1 v - 1•- to 5W0 PSI CONCRETE CAP/ IIIII'_ \;\�\\\ 6ix-#3 STIRRUP a (11) 85 LONGITUDINAL. •�_-Y*^/�\\/�24• ON CENTER` \ a /// REBAR, TYPICAL / PROPOSED T l SEAWALL PER ; - - " I " I _ ti `__i\/� \INBOARD EXISTING /\ PLANS _.1_-06' _ i - 6• \O\EEMAAIN \ j\ CONCRETE CAP SECTION (SG-950) @ KING PILE - OPTION A WAIF. I%1 - 1--W INSTALL NEW WALER- INSTALL NEW COMPOSITE SEAWALL PER PLANS `LIMITS OF EXCAVATED SOIL INSTALL NEW 7X•0 JET FILTER 8'-0' MAX. ON CENTER WITH REPLACEABLE FILTER CARTRIDGE EXISTING CONCRETE TO REMAIN UC-75 SEAWALL SECTION OPTION A W&L. 1 4' - 1•-0• \SOW\ RETE CAP \ $3 STIRRUP ®24'O.C. BETWEEN KING PILES •" �8' 1x-#3 STIRRUP \//\24. ON CENTER (13) pS LONGITUDINAL REBAR I \\�\\� BETWEEN KING PILES, TYPICAL INkAkCr EXISTING PROPOSED IIIII --= ✓\ CONCRETE PANELS l/\\�\\TD\QAN\\ SEAWALL PER PLANS IIIII l✓' _ _•�L//\///\///\/�/� CONCRETE CAP SECTION (S13-950) - OPTION A srxl:: NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NEMES ISLAND 9803 S. OCEAN DRIVE JESEN BEACH, R. 34957 CSM ENGINEERING CIVIL - STRUCTURAL - MARINE CSM ENGINEERINGt LLC AW. FMRI9A 34994 TI0W 2o910r05728sw0—SoE 772.220-4601 —.CSM.E.NE SI0T.iU CERFCAE0FAtrrN0RIVZAv6 p..CT 1 1®IR RItt1 N° arse Yt Im m IE Rssmna tlwrtn, oxa a ®ID Yf lllm NM N Rfll m YVrrA 111.911O ellmf 115f ROMN M ORFF>3 ErfRll RH®I Ns IO,41G a mI eOmR4 � ib Gmso¢ Th RA No GE9351�® IG®l M Y rmesmG � II4{6RY, SSGq 5 RYDGf 6 m LHI19a4 ue N9 s Imm tE IHA N o02 a ■ sNa RN Yr GGm RRu3T Boos � tsmp AmomRol a ml Ou¢04 ue mI t1Olan u ItFIFOG — N016 a WId0i15 1 6 Y" G1V7a STILL H m6ID N M RIG ID 11E f°GpClm. 1K WIIRIC<R S �6NE Im 11E m0®WLl Q AL NL SRUS 6®'i® RR9N ID 11l1Y tIGR ®® R9rRF4 GIRO 9I9N Re ANr asit; p®RCYnE °lam Rue Y 51m1 ROmf k ````11111111rrrr,,, ��••�10EN3Lc •••.!L '� V Z ' Na. 76910 ••.. STATE OF • !(� Q ; "- F<ORION, IN "QNAL r-\ 0' rrHr n n lll� 01AWF5 A 10flOFx 4t eUE SEAWAJ. DEALS - OPfpN A Rik D-5 1-6' 2'4'� I _ _ - I i I i I i •--• •- 5000 \> PSI CONCRETE Z-0; P� ONAETE CAP 1x-'I SRRRUP ®/ i #3 STIRRUP ® 24'O.C. g3 STIRRUP 6' 11 P' 6��4•� C� �\\ BETWEEN KING PILES 11I YI �6p,� (11) #5 LONGTNDINAL •_ _ - y y y \/ I'- ���/ �/ REEIAR, TYPIC_AL 1'-0' - i I i I I : r \� ( LONGITUDINAL REBAR BETWEEN KING PILES.TYPICAL 11 NO •iceINBOARD EXISTING PROPOSED `-- - I I I - -- r�� CNONCRETE PANELS �\ PROPOSED I I I y �\ \ ONCRETE PANELS SEAWALLPLANS '`a I I I III v•✓�/��%TO\\ SEAWALLPLANS CONCRETE CAP SECTION (UC-75) (C7% KING PILE - OPTION A CONCRETE CAP SECTION (UC-75) - OPTION A crAl p. 1%2 - L'-0—° STYLE 1 • - 1' `5.ODOPSI CONCRETE 1/2- CINFER PRECAST 1 211 X 1 2R KING PILE SECTION sFJ1C I' - 1 —0' J n56-0124966-021,0212-EE o.1•¢�E A= h s ��W3.4 Strand Patterns SECTION A -A ELEVATION Ar, A--J ALTERNATE STRAND PATTERNS 4 — GA' 0, Grade 270 LAS, at u kips 0 — W 0 (Speclai), Grade 170 LAS, N 15 kips B — V.' 0, Grade 270 1R5, at 14 Has s — jjj(b D Grpdr n0 1A5 d ]] kips 11 W3.4 Spiral Ties 1H' TV. 6' 'Itch. f.11 lagth �I fp Pile L r Corer As (TypJ 4 — No. 10 I 4 — No. 6 BarS Dowels fFUll Length) zi fy Pile—{ SECTION D-D (See Nondrlratle Unforeseen Reinforced Pfecast Pile Splice Detelf) 11 W3.4 1Vi' 1V' Splrel Ties I h� F Pile ® 3' Cavrr 'yPJ 4 — Na. 10 I Prestressing DoWels Strands Pile SECTION E-E (See Drivable Unforeseen Prestressed Precast Pile Splice Detail) 12 — • e, Grade 170 Ols, al 16 kips I PILE SPLICE REINFORCEMENT DETAILS NOTES: 1. Wort IRIS Index With Index N0. 10600 - NOteg and Details far Square Prestressed Coarrete Piles and Index No. 10601 - Square Prestressed Concrete Pile Splices. 1. Any at the given Alternate Strand Patterns may be wilised. The strands s1Wll be located as /allows: Plate ae strand At path roger and place the remalning strands equally spared between the corner strands. The total strand pattern shell be concentric with the rmminal rOrcreIs sectlan et the pile. PROPOSED 1" 2S4. KING PILE SPECIFICATION ScQ F• ILTS NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NETTLES ISIAND 9803 S. OCEAN DRIVE JENSEN BEACH, FL 34957 C MS M ENGINEERING CIVIL • STRUCTURAL • MARINE CSM ENGINEERING, LLC 208 SW OCEAN DDUL D SMAaT, FWRIpA 34994 777w2-220.4601 .CSM-E.NET CEIMRCATE OFALITMORRAmON: 29057 ➢E D®F➢1 WAIT LWQBi W9lO MAEa O11k1 w ltrmasq ND 0111A Nagar ssun 4E4 Rw6 AO . Rdm[SIDI as W Faso. t1Wa0. Ire kx tWm quips n kn WdI W W1aRER W lR1�WR WINE Iit4 t®NC M 0611p TWmI ft»®I AO OIiDQ ti ®I FIOaA411G 9W 4�kDR.IW: R,a I1D 03HB 1m6�gm 1®L CAI k5ffSLNaaa RLIFS�L>TP.II. 6 f1a0Ot O ®Ne411C NO 610f m H 1®4 W Au[ DI W MA FN NR WQ flDNT alON19[ ®ml Alass2R1N a rati IsaFLHsI Ilc cos U."OPR Up Co— tsom ®iD 0EOWIFS INm DNEI T: w MDID ertWw6 ti E 4ND ksam 1WLaxr. •v Ci. No. 76910 0, •'• STATE OF • !(/�: INAL IIII1111100 o11A6 A DNAOL M p0E sa Won— SEMI DETAILS -OPTION A. —0 D-6 41 SEE CAP DETAIL. SHEET D-7 INSTALL NEW CONCRETE CAP ENCASING EXISTING AND NEW WALL- qA MEAN LOW WATER EL = -5.00 INSTALL NEW COMPOSITE SEAWALL PER PLANSI `LIMITS OF EXCAVATED SOIL INSTALL NEW 2Y2'0 JET FILTER 6'-0' MAX. ON CENTER WITH REPLACEABLE FILTER CARTRIDGE EXISTING CONCRETE ♦+♦�,< o* 8 4y'*o+ TO REMAIN � a ♦ Permit Number 4 56-0124966-021.022-EE SDutbeutt Dietdct �4 , o y / a� z� PROPOSED UC-75 SEAWALL SECTION OPTION B sum 1 4- - 1--0- T IIa tx-#3 STIRRUP ® '• I - 1 24' ON CENTER + = t-.. •� _ - I LONGITUDINAL REBAR, " - TYPICAL - L - PROPOSED - - - • -� - I° - -- SEAWALL PER ° .- �•- -- PLANS CONCRETE CAP PLAN - OPTION B SCALE 1 2 . 1 SEE CAP DETAIL. SHEET INSTALL NEW CONCRETE CAP - ENCASING EXISTING AND NEW WALL TOP OF CAP EL = +0.00 RW1 NIUn IIAIEn u = -4.VU MEAN LOW WATER EL = -5.00 INSTALL NEW COMPOSITE SEAWALL PER PLANS— �UMTTS OF EXCAVATED SOIL INSTALL NEW 2K-O JET FILTER B'-0' ON CENTER WITH REPLACEABLE FILTER CARTRIDGE EXISTING CONCRETE TO REMAIN PROPOSED UC-95 SEAWALL SECTION OPTION B SOME 1/4- - 1•-0- ,�5000 PSI CONCRETE CAP�z > PSI NCRETE CAP/ � 'I`/°°COI ��/�\N6. � % (9) #5 LONGITUDINAL 9' i G-' REBAR, PCAL �24' 0CENTER IN REBARTPICAL 24 N CENTER N/////N1//NII///N/ SX PROPOED PROPOSED I - I • I J _ /INBO/AR/D D/fISfING/\ % SSW ALL INBOARD EXISTING /. SEAWALPLANS I I : I • /TOIN NCR REMAPAN ELS �� I I I I I I I I • - • j�\�� CONCRETE PANELS / %\ I : - / TO REMAIN CONCRETE CAP SECTION (UC-75) OPTION B CONCRETE CAP SECTION (1-10-95) OPTION B SwE , - , -0 SWL- , 2 - , - NEW SEAWALL SYSTEM GRAND CANAL - SOUTH SIDE NETRES ISLAND 9803 S. OCEAN DRIVE JENSSEN BEACH. FL 34957 csm ENGINEERING CIVIL - STRUCTURAL - MARINE CSM ENGINEERING, LLC 208 SW LI—N BOULEVARD STU—, FLGRIOA 34994 772.220.4601 —CSM-E.NET m IR1RmP, 11E RM RG [®61W6IXG® IRP)L u n rarmaa v RtDS911L slay a IIm190T v m Gamntl Iu no a Im m a lam n teoE a n Twt Rn An GRm RLFII VOGII lK aeon Rmov4a v mI LlOfEOq uc = mwm I6 owmw — R,6 d mmBTIS 11 \�\W AR��'''�. ` ..........� i No. 76910 iQ�•.- STATEOF 4,Q 00.9F5 A Nit01N 91 WE SEAWALL DETAILS - OPTION B mA, D-7 It UJ US A— earn. Prided Design Criteria Checklist for the U.S. Army Corns ofEneineers Jacksonville District's Programmatic Biological Opinion Date checklist sent to NMFS 2-EE Application # 10/29/21 (MM/DD/YY) Tracey Reviewer Last Name 56-124866-021,02(for Corps:SAJ-XXXX-XXXXX) Checklist Version' FDEP Indicate the agency issuing the permit/authorization. ® Yes E)No is this a re -verification, edit, or modification to a consultation previously submitted under JaxBO? Ifyes to above, enter date of previous Tier D consultation if another NMFS programmatic BO was used for the proposed project, please select name ofprogrammatic BO used. The Corps Project Manager or Delegated Authority has reviewed and confirmed that the proposed project meets all PDCs. It is the responsibility of the reviewer to ensure the proposed project complies with all the applicable PDCs. Please enter initials of reviewer. 9801 S Ocean Dr (Project Street Address 127.28497568 Latitude (decimal degrees, centroid of the project) Jensen Beach City-80.22597957 Longitude (decimal degrees, centroid of the project. Please include the negative symbol) St.. Lucie County (Florida) I Municipality (Puerto Rico & US V I) Select all activities used for the entire proposed project: ❑✓ 1 �✓ 2 3 []4 E]5 E]6 E]7 �8 E]9 E]10 []SupersedingProcess Geographic Area Is the project located in the geographic area? Select DCH Unit Are Essential Features Present? If Essential Features are present, enter area of im act Smalltooth Sawfish DCH Limited Exclusion Zones (APA) Yes • No N/A N/A N/A GulfSturgeon DCH Migratory Restriction Zones APA Yes • No NIA N/A N/A Atlantic Sturgeon DCH Exclusion Zone AP.4 Yes • No NIA NIA No activities allowed here! North Atlantic Right Whales Educational Sign Zones APA Yes • No NIA NIA N/A U.S. Caribbean Sea Turtle Critical Habitat Restriction Zones AP.4 O Yes • No NIA NIA N/A B de's Whale Exclusion Zone APA Yes • No NIA N/A No activities allowed here! Smalltooth sawfish DCH 0 Yes • No 0 Yes • No LF of Red Mangroves SF of shallow eurybaline water Gulf stur eon DCH 0 Yes • No 0 Yes (D No SF of essential features Loggerhead sea turtle WA DPS DCHt 0 Yes • No Yes • No SF of essential features Green sea turtle A DPS) DCH 0 Yes • No NIA Yes • No SF of essential features Hawksbill sea turtle DCH Yes • No NIA Yes • No SF ofessential features Leatherback sea turtle DCH Yes • No NIA Yes • No SF of essential features Sta horn and elkhom Acro oracoral DCH 0 Yes • No 0 Yes • No No impacts to essential features allowed. Johnson's scagrass DCH 0 Yes )No 0 Yes • No SF of essential features North Atlantic right whale DCH 0 Yes • No Yes • No SF of essential features Atlantic sturgeon DCH Yes • No N/A No activities allowed here! 0 Is the Project in or near areas with mangroves, seagrasses, corals, or hard bottom habitat? Does it comply with PDCs for Mangroves, Seagrasses, Corals, and Hard Bottom for All Projects (AP.3) D............ P.....1 i. fhr rrf fnnfnrinf9 Cn n Frnf nf[m orf Mangroves Yes No Nonlisted Sea Yes No Johnson's Scagrass Yes a No Listed Corals 0 Yes • No Nonlisted Corals 0 Yes • No Hardbottom Yes • No 3.00 SF of 0verwaler Impacts (area of structure over/above the water surface, e.g., docks or canopies) 700.00 SF of Total In -water Impacts (area of substrate that is permanantly changed below MHW, e.g., by seawall, riprap, or cross -sectional area of piles) r— Yes Applicant agrees to adhere to PDCs for In -Water Activities (AP. 1) as described in AP.7 through AP.I l 17 Yes Applicant ahrecs to perform all activities during daylight hours (AP.6). ® Yes 0 No Is the project within the boundary of the Florida Keys National Marine Sanctuary (FKNMS)? 1771 Yes Ifwithin the boundaries of FKNMS, received NOAA authorization? To be completed by applicant or agent ifpermit is issued by a delegated authority (FDEP, Miami -Dade, etc.) Please enter full name of applicant or applicant's representative: The applicant or applicant's representative ensures the project complies with the PDCs and all information in this form and individual checklist(s) is correct "omments: The seawall is being replaced. Decking will be lifted from existing docks to install the wall under it then the decking replaced. there will be no change in dock footprints 1 rh—L-No Vr in Crlrrr 1 Wit 6 fhr 11— ri--, ..e .,,hmhfinn rhr r..n.,dr.rinn Cnlrrl l ifvn„ ­1on n..n. a. rho n irrr hoc A. —A .nA .. ­­1 1. .r...h..,ir rha A—L-li.f '% T..-...:..— / A N 1 1 /'1 A /-1 A 1 0 Project Design Criteria Checklist for the U.S. Army Corps of Engineers Jacksonville District's Programmatic Biological Opinion Activity 1: Shoreline Stabilization Agency's internal use only: H29EDate checklist sent to NMFS 022-EE (MM/DD/yy) Tracey PM Last Name 56-124866-021,Application # � Checklist Version Proposed Activity (Select all that apply): New Seawall Repair Seawall 0 Replacement Seawall ®New Seawall Footer Replacement Seawall Footer New Shoreline Stabilization Materials Enter information about the proposed activity: 0 Seawall material �w Seawall installation method Select Noise PDC Category (AP.2.) Seawall: Length (ft) Seawall: Distance waterward from MHWL or existing seawall (ft) Riprap: Length Riprap: Distance waterward from MHWL or existing seawall ^^ Is shoreline stabilization material hand placed around red mangrove prop roots? (A1.3) Q Repair Shoreline Stabilization Materials Q Removal/Fill of Upland Cut Boat Ramps, Slips, and Basins Q Other (Provide Information in Comments Section 0 Number of piles 0 Size of piles (area in square feet) Pile Material Pile Installation Method For projects located in Designated Critical Habitat, please comnlete applicable section below. "=Is the project located in the geographic area of smalltooth sawfish critical habitat? 0 Project does NOT include placement of new shoreline stabilization materials in waters between the MHWL and -3 ft MLLW (A1.8.1.). Enter area (si) of shallow euryhaline waters filled as a result of seawall installation Enter area (sf) of shallow euryhaline waters filled as a result of upland cut fill "=Is the project located in the geographic area of gulf sturgeon critical habitat? All new shoreline stabilization materials (e.g., riprap,articulating concrete mats) are placed between the shoreline and -6 ft MHW (A1.9.). Enter width of the area (e.g., channel, bay) if in a Gulf Sturgeon Critical Habitat Migratory Restriction Zone (Section 2.1.1.2) Select the pile or sheet pile activity being performed in Gulf Sturgeon Critical Habitat Migratory Restriction Zones (A1.9.)? "=Is the project located in the geographic area of Acropora critical habitat? 0 Essential features present, so only repair/replace in same footprint. (Al.10) Is the project located in the geographic area of Johnson's seagrass critical habitat? 0 Essential features are present, confirm that installation of new or expanded shoreline stabilization material is not occurring (A1.l 1). �Is the project located within the geographic area of U.S. Caribbean sea turtle critical habitat? 0 Project includes the repair/replacement of shoreline protection materials within the existing footprint (Al.12.). Please note, this checklist does not contain all of the PDCs. Please refer to the Biological Opinion to confirm the project meets all PDCs prior to completing this checklist.