Loading...
HomeMy WebLinkAboutInspection LetterPAUL WELCH INC. Mechanical Electrical Civil Engineering 1984 S.W. Biltmore_St. Suite#114 Port Saint Lucie, FL 34984 Phone (772) 785 - 9888 December 13, 2021 Re: Permit# SLC-2107-0836 Leighton Alterations 132 NE Lobster Rd. Port St. Lucie, Florida To Whom It May Concern: Our office has personally inspected the after the fact alterations per attached inspection report and find that all work meets the requirements of the FBC 2020 7th Edition, FBC 2020 Residential 71h Edition and our plan and engineering requirements. Thank you for your attention to this matter. Sincerely: PAUL WELCH INC. Paul h, P.E. Fla. Re . No. 29945 FW:ns �'.2:_, y inspection Report INSPECTION TYPE Inspector INSPECTION STATUS NOTES DATE 1. Plumbing Rough Paul Welch 8/20/2021 Passed WC, Lav, Shower per county approved P.E. plan 2. Wire Lath Paul Welch 8/20/2021 Passed Wire lath with 11ga x 2" nails w/ 3/8" P.E. dia. head at 6" o.c. per county approved plan 3. Mono Pre -pour Paul Welch 8/20/2021 Passed Concrete only poured at new plumbing P.E. locations per county approved plans 4. Rough Framing Paul Welch 8/20/2021 Passed 2x8 fill-in wall and interior non brg. P.E. Wall constructed per county approved plan 5. Electric rough Paul Welch 8/20/2021 Passed Electric rough per county approved P.E. plan, tied into existing service 6. Wall Sheathing Paul Welch 8/20/2021 Passed 15/32" CDX plywood wall sheathing P.E. with 10d nails at 6" o.c. per county approved plan 7. Insulation Paul Welch 8/20/2021 Passed R-19 batts in fill-in walls, R-30 in attic P.E. 8. Window/Door Paul Welch 8/20/2021 Passed #12 x 1 %" Embd. wood screws at 3" / Attachment P.E. 16" O.C. per county approved plan / prod. approval 9. Window/Door Paul Welch 8/20/2021 Passed Window / door flashing w/ lap sill Flashing P.E. panning provided per county approved plan 10. Plumbing Top Paul Welch 8/20/2021 Passed Plumbing top out for wc, lav, shower Out P.E. per county approved plan 11. Weather Barrier Paul Welch 8/20/2021 Passed Tyvek building wrap weather barrier at P.E. new fill in walls 12. Mechanical Paul Welch 8/20/2021 Passed 8" duct from existing to 6" x 16" supply, Rough P.E. louver in door for R/A 13. Notice Of By Others TBD Open By Others Commencement 14. Termite Spray Paul Welch 8/20/2021 Passed Contractor was observed by our office PE spraying the fill with termite treatment 15. Mechanical Final By Others TBD Open By Others 16. Electric Final By Others TBD Open By Others 17. Plumbing Final By Others TBD Open By Others 18. Final Inspection By Others TBD Open By Others Re: Permit# SLC-2107-0836 Leighton Alterations 132 NE Lobster Rd. Paul Welch PE Port St. Lucie, Florida / Fla. Reg. No. 29945 DEC 13 2021