Loading...
HomeMy WebLinkAboutAPPROVED Claudio Engineering 01-06-22d 76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Jon P. Ward, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com January 6, 2022 Jacob Humpherys, COO Meraki Solutions 30700 Wekiva River Road Sorrento, FL 32776 Re: Engineering Services Claudio Residence 381 SE Tranquilla Avenue, Port St. Lucie, FL 6.120 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof pl an and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: Prefabricated wood trusses with all truss members constructed of 2 x 4 dimensional lumber at 24” on center. Roof Material: Composite Asphalt Shingles Roof Slope: 13 degrees Attic Access: Accessible Lumber type: Assumed Spruce Pine Fir or better Foundation: Permanent C. Loading Criteria Used • Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF • Dead Load o Existing Roofing and framing = • Live Load = 20 psf (reducible) – 0 psf at locations of solar panels • Ground Snow Load = 0 psf • Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 160 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the FBC 2020 7th Edition, including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent “Ironridge Installation Manual”, which can be found on the Ironridge website (http://ironridge.com/). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. The maximum allowable withdrawal force for a 5/16” lag screw is 235 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using one 5/16” diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of rafters, and condition of the roof, the panel supports shall be placed no greater than 48” on center. 4. Panel supports connections shall be staggered to distribute load to adjacent framing members. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the FBC 2020 7th Edition, current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE Florida License No. 81558 Date Signed 1/6/2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 PV01 COVER PAGE PV02 SITE PLAN PV03 ROOF ATTACHMENTS PV04 MOUNTING DETAIL PV05 LINE DIAGRAM PV06 ELECTRICAL CALCS PV07 LABELS PV08 PLACARD PV09 SITE PHOTOS COVER PAGE - PV01 DRAWN BY: SoloCAD 1.INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE 690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING. 2.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110. 3.ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250 4.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES. 5.ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.8] 6.DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.31] 7.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE. PHOTOVOLTAIC (PV) SYSTEM SPECIFICATIONS AERIAL VIEW: SHEET INDEX: OCCUPANCY: R-3 ZONING: RESIDENTIAL STREET VIEW: GENERAL NOTES APPLICABLE GOVERNING CODES SITE SPECIFICATIONS 2017 NEC 2020 FLORIDA BUILDING CODE, RESIDENTIAL, 7TH EDITION 2020 FFC 2020 FLORIDA BUILDING CODE, BUILDING, 7TH EDITION 2020 FLORIDA BUILDING CODE, EXISTING BUILDING, 7TH EDITION EQUIPMENT: AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) RACKING: FlashVue - 48" O.C. INV M MSP AC JB SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: EQUIPMENT LEGEND: INVERTERVISIBLE, LOCKABLE, LABELED AC DISCONNECT METER SOCKET (FOR UTILITY PV METER) UTILITY METER MAIN SERVICE PANEL LC LOAD CENTER FIRE ACCESS PATHWAY (3' TYP) C INV PV AC MSP M COMBINER BOX PROPERTY LINE FRONT OF HOME 381 Se Tranquilla Ave BATT BATTERY(IES) VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER SUB SUB PANEL SITE PLAN - PV02 DRAWN BY: SoloCAD MP1 ARRAY DETAILS: MOUNTING PLANE:AZIMUTH:TILT: MP1 131°13° 89'-9" 161'-11" INV M MSP AC JB EQUIPMENT INFORMATION:ROOF INFO:PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT:18 RAIL PART NUMBER:XR-100 ROOF FRAMING:Manufactured Truss ARRAY AREA:MODULE COUNT * 19.29 ft² = 347.22 ATTACHMENTS FlashVue RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2423 ft² ATTACHMENT QTY:36 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED:14% SPLICE QTY:8 ATTACHMENT SPACING:48''ARRAY WEIGHT:MODULE COUNT * 44 lbs = 792 lbs MIDCLAMP QTY:32 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 22 ENDCLAMP QTY:8 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.28 lbs/ft² SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: ROOF ATTACHMENTS - PV03 DRAWN BY: SoloCAD 4'-0" 3' TYP 2'-0"3'-0" RAIL (E) COMP SHINGLE ROOF (1 LAYER) ATTACHMENT PV MODULE (E) RAFTER/TOP CHORD DETAIL, MOUNTING AND FLASHING 5/16" STAINLESS STEEL LAG BOLT WITH 2-1/2" MIN. EMBEDMENT (PER MANUFACTURER) 4" RAIL 2.5" MIN. EMBED. FLASHING (SEE DATASHEET FOR DETAILS) RAIL 1" PV MODULE FRAME RAIL ATTACHMENT 2'-8" MIN - 3'-10" MAX 3 RAIL PV MODULE MAX SPAN1'-8" MAX. 21 FRONT VIEW 10" MIN - 1'-4" MAX 2'-8" MIN - 3'-10" MAX 10" MIN - 1'-4" MAX SIDE VIEW3 (E) RAFTER/TOP CHORDS (E) RAFTER/TOP CHORD END CLAMP DETAILS MID CLAMP DETAILS21 END CLAMP MID CLAMP EQUIPMENT INFORMATION:ROOF INFO:PHOTOVOLTAIC ARRAY STRUCTURAL CRITERIA: RAIL MANUFACTURER:IronRidge ROOF TYPE:Asphalt Shingle PV MODULE COUNT:18 RAIL PART NUMBER:XR-100 ROOF FRAMING:Manufactured Truss ARRAY AREA:MODULE COUNT * 19.29 ft² = 347.22 ATTACHMENTS FlashVue RAFTER/TOP CHORD SIZE:2x4 ROOF AREA:2423 ft² ATTACHMENT QTY:36 RAFTER/TOP CHORD SPACING:24"PERCENT OF ROOF COVERED:14% SPLICE QTY:8 ATTACHMENT SPACING:48''ARRAY WEIGHT:MODULE COUNT * 44 lbs = 792 lbs MIDCLAMP QTY:32 DISTRIBUTED LOAD:ARRAY LBS/ATTACHMENTS = 22 ENDCLAMP QTY:8 POINT LOAD: (lbs/ft²)(ARRAY) WEIGHT/AREA = 2.28 lbs/ft² SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: MOUNTING DETAIL - PV04 DRAWN BY: SoloCAD 120/240 VAC TO UTILITY GRID (E)UTILITY METER 4 (E) LOADS N G (E)GROUNDING ELECTRODE (N) 30A-2P (N) 200A-2P (N) 225A MAIN SERVICE PANEL 4 PV AC DISCONNECT 30A VISIBLE, LOCKABLE, LABELED, OPEN 240V, 2-POLE AC DC J-BOX = = = = = =9 MODULES = = = = = =9 MODULES J-BOX J-BOX 2 3 UL 1741 COMPLIANT INTEGRATED RAPID SHUTDOWN DC DISCONNECT 1 1 SolarEdge SE5000H-US (240V) 2 STRING (2): 15.0 A DC STRING (1): 15.0 A DC DATE: January 5, 2022 SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: SUBJECT PV SYSTEMS HAS BEEN DESIGNED TO MEET THE REQUIREMENTS OF THE NEC 2017, AND THOSE SET FORTH BY THE FLORIDA SOLAR ENERGY CENTER CERTIFICATION, INCLUDING- MAXIMUM NUMBER OF MODULE STRINGS. MAXIMUM NUMBER OF MODULES PER STRING, MAXIMUM OUTPUT, MODULE MANUFACTURER AND MODEL NUMBER, INVERTER MANUFACTURER AND MODEL NUMBER. LINE DIAGRAM - PV05 DRAWN BY: SoloCAD SolarEdge SE5000H-US (240V) Specs MAX INPUT VOLTAGE:480 V MAX INPUT CURRENT:13.5 A NOMINAL DC INPUT VOLTAGE:380 V MAXIMUM OUTPUT POWER:5000 W NOM. OUTPUT VOLTAGE:240 V MAX OUTPUT CURRENT:21 A 1-Phase, 60 HZ, UL 1741 Listed Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w Specs POWER MAX (PMAX):340W OPEN CIRCUIT VOLTAGE (VOC):40.66V MAX POWER-POINT CURRENT (IMP):10.02A MAX POWER-POINT VOLTAGE (VMP):33.94V SHORT CIRCUIT CURRENT (ISC):10.52A SERIES FUSE RATING:20A VISIBLE, LOCKABLE, LABELED AC DISCONNECT LOCATED WITHIN 10' OF UTILITY METER Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE 1 (2)10 AWG PV-WIRE , USE-2, COPPER (L1, L2) N/A - FREE AIR(1)6 AWG BARE, COPPER (GROUND) 2 (2)10 AWG THWN-2, or THHN COPPER - (L1, L2) 3/4" EMT(1)10 AWG THWN-2, or THHN COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2, COPPER - (L1, L2) 3/4" EMT (1)10 AWG THHN/THWN-2 - (GROUND) 4 (3)10 AWG THWN-2 COPPER - (L1, L2, NEUTRAL) 3/4" EMT(1)10 AWG THWN-2 COPPER - (GROUND) Equipment Schedule TYPE:QTY:DESCRIPTION:RATING: MODULES:(18)Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w 340 W INVERTERS:(1)SolarEdge SE5000H-US (240V)5000 W AC DISCONNECT(S):(1)PV AC DISCONNECT, 240V, 2-POLE 30A DC OPTIMIZERS:(18)SolarEdge P370 15 Adc DATE: January 5, 2022 SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: INTERCONNECTION NOTES: 1. INTERCONNECTION SIZING, LIMITATIONS AND COMPLIANCE DETERMINED IN ACCORDANCE WITH [NEC 705.12], AND [NEC 690.64]. 3. GROUND FAULT PROTECTION IN ACCORDANCE WITH [NEC 215.9], [NEC 230.95] AND [NEC 690.5] 4. ALL EQUIPMENT TO BE RATED FOR BACKFEEDING. 5. PV BREAKER TO BE POSITIONED AT THE OPPOSITE END OF THE BUSBAR RELATIVE TO THE MAIN BREAKER. DISCONNECT NOTES 1. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING LIVE ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS) 2. AC DISCONNECT MUST BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH GROUNDING & GENERAL NOTES: 1. PV INVERTER IS UNGROUNDED, TRANSFORMER-LESS TYPE. 2. DC GEC AND AC EGC TO BE SPLICED TO EXISTING ELECTRODE 3. ANY EXISTING WIRING INVOLVED WITH PV SYSTEM CONNECTION THAT IS FOUND TO BE INADEQUATE PER CODE SHALL BE CORRECTED PRIOR TO FINAL INSPECTION. 4. JUNCTION BOX QUANTITIES, AND PLACEMENT SUBJECT TO CHANGE IN THE FIELD - JUNCTION BOXES DEPICTED ON ELECTRICAL DIAGRAM REPRESENT WIRE TYPE TRANSITIONS. 5. AC DISCONNECT NOTED IN EQUIPMENT SCHEDULE OPTIONAL IF OTHER AC DISCONNECTING MEANS IS LOCATED WITHIN 10' OF SERVICE DISCONNECT. STRING CALCULATIONS OPTIMIZER MAX OUTPUT CURRENT OPTIMIZERS IN SERIES: NOMINAL STRING VOLTAGE: ARRAY OPERATING CURRENT: ARRAY DC POWER: TOTAL MAX AC CURRENT: STRING #1 15A 9 380V 8A 6120W 21A STRING #2 15A 9 380V 8A SolarEdge SE5000H-US (240V) ELECTRICAL CALCS - PV06 DRAWN BY: SoloCAD Conduit & Conductor Schedule TAG QTY WIRE GAUGE DESCRIPTION CONDUIT SIZE CONDUCTOR RATING CONDUCTOR TEMP. RATE AMBIENT TEMP TEMP. DERATE # OF CONDUCTORS DERATE CONDUCTOR RATING W/DERATES CONDUIT FILL 1 (2)10 AWG PV-WIRE , USE-2, COPPER (L1, L2) N/A - FREE AIR 40A 90°C 33°C 0.96 N/A - FREE AIR 38.4A N/A - FREE AIR(1)6 AWG BARE, COPPER (GROUND) 2 (2)10 AWG THWN-2, or THHN COPPER - (L1, L2) 3/4" EMT 40A 90°C 33°C 0.96 1 38.4A 11.9%(1)10 AWG THWN-2 COPPER - (GROUND) 3 (4)10 AWG THHN/THWN-2, COPPER - (L1, L2) 3/4" EMT 40A 90°C 33°C 0.96 0.8 30.72A 19.8%(1)10 AWG THWN-2 COPPER - (GROUND) 4 (3)10 AWG THWN-2 COPPER - (L1, L2, NEUTRAL) 3/4" EMT 35A 75°C 33°C 0.96 1 33.6A 15.9%(1)10 AWG THWN-2 COPPER - (GROUND) SYSTEM OCPD CALCULATIONS INVERTER MODEL(S):SolarEdge SE5000H-US (240V) # OF INVERTERS:1 MAX OUTPUT CURRENT:21A (# OF INVERTERS) X (MAX OUTPUT CURRENT) X 125% <= OCPD RATING (1 X 21 A X 1.25) = 26.25A <= 30A, OK BUSBAR CALCULATIONS - 120% RULE MAIN BUSBAR RATING:225A MAIN DISCONNECT RATING:200A PV BREAKER RATING:30A (MAIN BUS RATING X 120%) - MAIN DISCONNECT RATING >= OCPD RATING (225A X 1.2) - 200A = 70A, >= 30A, OK NUMBER OF CURRENT CARRYING CONDUCTORS PERCENT OF VALUES 4-6 .80 7-9 .70 10-20 .50 SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: LABELS - PV07 DRAWN BY: SoloCAD *ELECTRICAL DIAGRAM SHOWN ABOVE IS FOR LABELING PURPOSES ONLY. NOT AN ACTUAL REPRESENATION OF EQUIPMENT AND CONNECTIONS TO BE INSTALLED. LABEL LOCATIONS PRESENTED MAY VERY DEPENDING ON TYPE OF INTERCONNECTION METHOD AND LOCATION PRESENTED ON THE ELECTRICAL DIAGRAM PAGE. JUNCTION BOX OR COMBINER BOX MAIN SERVICE PANEL AC DISCONNECT EXISTING SUB PANEL (IF WHERE POINT OF INTERCONNECTION IS MADE) PV COMBINER SUBPANEL - IF USED TO COMBINE PV OUTPUT CIRCUITS AC DC INVERTER (S) INTEGRATED DC DISCONNECT 2 8 5 9 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 6 1 1 1 5 (ONLY IF PV INTERCONNECTION CONSISTS OF LOAD SIDE BREAKER) 6 3 LABELING DIAGRAM: 3 4 1 2 3 4 1 LABELING NOTES: 1.LABELS CALLED OUT ACCORDING TO ALL COMMON CONFIGURATIONS. ELECTRICIAN TO DETERMINE EXACT REQUIREMENTS IN THE FIELD PER CURRENT NEC AND LOCAL CODES AND MAKE APPROPRIATE ADJUSTMENTS. 2.LABELING REQUIREMENTS BASED ON THE 2017 NATIONAL ELECTRIC CODE, OSHA STANDARD 19010.145, ANSI Z535. 3.MATERIAL BASED ON THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. 4.LABELS TO BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED [NEC 110.21(B)(3)] 5.LABELS TO BE A MINIMUM LETTER HEIGHT OF 3/8", WHITE ON RED BACKGROUND; REFLECTIVE, AND PERMANENTLY AFFIXED [IFC 605.11.1.1] WARNING! TERMINALS ON THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION ! ! WARNING WARNING THIS EQUIPMENT IS FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. WARNING! DUAL POWER SUPPLY SOURCES: UTILITY GRID AND PV SOLAR ELECTRIC SYSTEM PHOTOVOLTAIC AC DISCONNECT RATED AC OUTPUT CURRENT: NOMINAL OPERATING AC VOLTAGE: ELECTRIC SHOCK HAZARD INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE WARNING: PHOTOVOLTAIC POWER SOURCE RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL 5 AT POINT OF INTERCONNECTION, MARKED AT AC DISCONNECTING MEANS. [NEC 690.54, NEC 690.13 (B)] LABEL 2 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(b)] LABEL 6 AT DIRECT-CURRENT EXPOSED RACEWAYS, CABLE TRAYS, COVERS AND ENCLOSURES OF JUNCTION BOXES, AND OTHER WIRING METHODS; SPACED AT MAXIMUM 10FT SECTION OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, CEILINGS, OR FLOORS. [NEC 690.31(G)(3&4)] LABEL 9 SIGN LOCATED AT RAPID SHUT DOWN DISCONNECT SWITCH [NEC 690.56(C)(3)]. LABEL 7 FOR PV SYSTEMS THAT SHUT DOWN THE ARRAY AND CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(A)] LABEL 8 FOR PV SYSTEMS THAT ONLY SHUT DOWN CONDUCTORS LEAVING THE ARRAY: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. [NEC 690.56(C)(1)(b)] LABEL 1 FOR PV DISCONNECTING MEANS WHERE THE LINE AND LOAD TERMINALS MAY BE ENERGIZED IN THE OPEN POSITION. [NEC 690.13(B)] LABEL 3 PLACED ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER IF TIE IN CONSISTS OF LOAD SIDE CONNECTION TO BUSBAR. [NEC 705.12(B)(2)(3)(c)] LABEL 4 EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTOR SUPPLIED FROM MULTIPLE SOURCES SHALL BE MARKED TO INDICATE THE PRESENCE OF ALL SOURCES [NEC 705.12(B)(3)] 4 7 OR TURN RAPID SHUTDOWN SWICH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN CONDUCTORS OUTSIDE THE ARRAY. CONDUCTORS WITHIN THE ARRAY REMAIN ENERGIZED IN SUNLIGHT SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS ! 21 240 INV M MSP AC JB SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: POWER TO THIS BUILDING IS ALSO SUPPLIED FROM ROOF MOUNTED SOLAR ARRAYS WITH SAFETY DISCONNECTS AS SHOWN: CAUTION DIRECTORY PERMANENT PLAQUE OR DIRECTORY PROVIDING THE LOCATION OF THE SERVICE DISCONNECTING MEANS AND THE PHOTOVOLTAIC SYSTEM. (ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS OUTLINED WITHIN: NEC 690.56(B)&(C), [NEC 705.10]) 381 Se Tranquilla Ave, Port St. Lucie FL 34983 FRONT OF HOME PV ARRAY MAIN DISTRIBUTION UTILITY DISCONNECT AC DISCONNECT INVERTER & RAPID SHUTDOWN DC DISCONNECT SWITCH PLACARD - PV08 DRAWN BY: SoloCAD SITE INFORMATION Luis Claudio 381 Se Tranquilla Ave Port St. Lucie, FL 34983 AC SYSTEM SIZE: 5 kW AC DC SYSTEM SIZE: 6.12 kW DC Lat, 27.3202595 Long, -80.3379125 (18) Hanwha Q. Cells Q.Peak DUO BLK-G6+ 340w PV MODULES (1) SolarEdge SE5000H-US (240V) INVERTER(S) Florida Power & Light DATE: January 5, 2022 Meraki Installers 484-663-3792 21 N New Warrington Rd Pensacola, FL 32507 License # CVC57044 CONTRACTOR INFORMATION: SITE PHOTOS: SITE PHOTOS - PV09 DRAWN BY: SoloCAD