HomeMy WebLinkAboutBlower door test4$ y
r
{
F y apt 'r�,..�� '� '..•"��
� 7Fwr
_a.
Date.s6
Contractor:
doh Address:
Construction:
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone: 772-462-2165 Fax: 772.462,6443
BLOWER DOOR TEST FORM
House infiltration Test Certification
Prescriptive and Performance Method
t 6 11 ->tZ
Perm
f0,--, 1 (' j
it #4 2,v�—G y-st
&0� ) 4-r- , L:
L Lit
� L4[Vew Construction —Complete �
j House Infiltration Test Results
� CFM (50) = I I 'L )?
SLC Climate one �
Test Date:
IlofUme
ACH (50) = CFM (50) x 60 / Volume
Passing results muss be & ACH (50) or Tess
Existing — After Addition
t
Mechanical Ventilation required less than 3 ACH
6,4 Pass 4 j Fail �
FE3C, Energy
The building or dwelling unit sham be tested and verified as haying an air leakage rate of nog exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per- hour, in Climate Zones 3 through S. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g, t50 Pascals. Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f)p (g} or (i) or an
approved third parry. A written report of the results of the test shad be signed by the party conducting the test and
provided to the rode official. Testing shad he performed at any rime after creation of all enetr 'ions of the building
thermal envelope.
fBC, Residential
Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when jested with a blower door at a
pressure of 0.2 inch w. c. (SO Pad in accordance with Section R402.4.1,2 of the Florido Bufldl-ng Code, Energy coi7servation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
TEstiniz Company
Company Name: ilro-Ducl' Servic;es Address: 1��5 Rio Vista Drive, Ft. Pierce, FL 34949
herebcertify that tine above House Ir����rat�+ion results demonstrate compliance with ABC Energy Conservation
requirements in accordance with Section R402A.1.2 climate done Z.
Signature:
Printed Name: Martin Klein
License/Certification 5061633
1 ��
i
L
i
N
BUILDING PERFORMANCE INSTITUTE., INC
107 Herres Road, Suite 210
Malta. NY -112020 #"%�
www bpi. org
l- %
9R"M�. -
Martin Klein
BPI lDN. &061G33
CERTIFIED PRnFE551QNAl
(SEE RIFvERSE S.DC FqA DES 'GNAi[ON 5AND EXP. RAT QH QATiSj
CERTIFIED PRO FE SIONAL DES16NATION EXPIRATION DATE
iltrafion & Duct Lcaka g c 6/204
10
BUILDING PERFORMANCE INSTITUTE, INC
WNW jJ217'