Loading...
HomeMy WebLinkAboutBlower door test4$ y r { F y apt 'r�,..�� '� '..•"�� � 7Fwr _a. Date.s6 Contractor: doh Address: Construction: Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone: 772-462-2165 Fax: 772.462,6443 BLOWER DOOR TEST FORM House infiltration Test Certification Prescriptive and Performance Method t 6 11 ->tZ Perm f0,--, 1 (' j it #4 2,v�—G y-st &0� ) 4-r- , L: L Lit � L4[Vew Construction —Complete � j House Infiltration Test Results � CFM (50) = I I 'L )? SLC Climate one � Test Date: IlofUme ACH (50) = CFM (50) x 60 / Volume Passing results muss be & ACH (50) or Tess Existing — After Addition t Mechanical Ventilation required less than 3 ACH 6,4 Pass 4 j Fail � FE3C, Energy The building or dwelling unit sham be tested and verified as haying an air leakage rate of nog exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per- hour, in Climate Zones 3 through S. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g, t50 Pascals. Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f)p (g} or (i) or an approved third parry. A written report of the results of the test shad be signed by the party conducting the test and provided to the rode official. Testing shad he performed at any rime after creation of all enetr 'ions of the building thermal envelope. fBC, Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when jested with a blower door at a pressure of 0.2 inch w. c. (SO Pad in accordance with Section R402.4.1,2 of the Florido Bufldl-ng Code, Energy coi7servation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. TEstiniz Company Company Name: ilro-Ducl' Servic;es Address: 1��5 Rio Vista Drive, Ft. Pierce, FL 34949 herebcertify that tine above House Ir����rat�+ion results demonstrate compliance with ABC Energy Conservation requirements in accordance with Section R402A.1.2 climate done Z. Signature: Printed Name: Martin Klein License/Certification 5061633 1 �� i L i N BUILDING PERFORMANCE INSTITUTE., INC 107 Herres Road, Suite 210 Malta. NY -112020 #"%� www bpi. org l- % 9R"M�. - Martin Klein BPI lDN. &061G33 CERTIFIED PRnFE551QNAl (SEE RIFvERSE S.DC FqA DES 'GNAi[ON 5AND EXP. RAT QH QATiSj CERTIFIED PRO FE SIONAL DES16NATION EXPIRATION DATE iltrafion & Duct Lcaka g c 6/204 10 BUILDING PERFORMANCE INSTITUTE, INC WNW jJ217'