February 24, 2022
Eligha Pryor
Complete Construction and Design
755 8th Court, Suite #4
Vero Beach, FL. 32962
Re: 1912 Lynx Drive
Fort Pierce, Florida
KSM Project #: 219325-b2
Dear Mr. Pryor:
As requested, KSM Engineering & Testing has performed a subsurface investigation at
the above referenced site. The data gathered during the investigation, together with our
geotechnical related opinions, are included in this report.
Site Description:
At the time of drilling, the riverfront site was flat with some light surface vegetation
(grass).
Site Investigation:
The site investigation program consisted of performing four (4) Standard Penetration
Test (SPT) borings within the area of the proposed footings for the proposed structure.
The borings were terminated at depths of approximately 10 to 15 feet below existing
grade on the site at the time of the investigation. These tests were performed to verify
that the soil densification performed from February 9, 2022, to February 11, 2022, had
been achieved through cement grouting under pressure. The locations of the borings
were specified by the client in the field and the approximate locations are indicated on
the attached boring Location Plan.
The SPT borings were completed in general accordance with procedures described in
ASTM D1586.
The records of the soils encountered, the SPT penetration resistance values, and
groundwater levels that were recorded in the borings are shown on the attached logs.
Engineering Evaluation and Conclusions:
KSM performed borings in the proposed footing areas in order to assess whether the
site subgrade conditions had been properly stabilized through the injection of
1912 Lynx Drive
Fort Pierce, Florida
KSM Project #: 219325-b2
Page 2 of 3
cementitious grout, under pressure. The discovered post-grout injection subsurface
conditions are described as follows:
Boring Locations B-1, B-2, and B-4 – The discovered subsurface conditions indicate
that the dark gray and dark brown clayed silt with traces of organics deposits were
densified from a pre-injection condition that was very loose in consistency to a post-
injection condition that ranged from loose to medium-dense, at locations mid-way
between the injection pipe locations.
Boring Location B-3 – The discovered subsurface conditions indicate that the dark
brown clayed silt with organics deposits were mildly densified from a pre-injection
condition that was very loose in consistency to a post-injection condition that was
generally loose to very loose.
Building Subgrade Mitigation Opinions – Based on the results of the post-injection
borings, in comparison to the pre-injection borings, it is KSM’s professional opinion that
the subsurface soils were improved sufficiently to allow the proposed structure to be
supported on a structural steel-reinforced “waffle type” structural slab. The earthwork
contractor can continue with the balance of the site preparation work that was
delineated in KSM’s December 2, 2021, report. The foundation should subsequently be
designed and constructed in accordance with recommendations made in KSM’s
December 2, 2021, report.
Closure:
Standard of Care – This report has been prepared in accordance with generally
accepted soil and foundation engineering practices based on the results of the test
borings and the assumed loading conditions. No warranties, either expressed or
implied, are intended or made. This report does not reflect any variations which may
occur between the borings. If variations appear evident during the course of
construction, it would be necessary to re-evaluate the recommendations of this project.
Construction Phase Services and Report Amendments – Based upon KSM’s post-
injection investigation of the subsurface conditions at the above-mentioned project
location, the reliance of the recommendations presented within this signed and sealed
report is predicated on KSM representative’s involvement to verify that not only have the
soils been prepared following the indicated recommendations, but the foundations are
installed in compliance within the parameters indicated. The Structural Engineer of
Record is responsible for confirming that the estimated capacities provided are
adequate for the anticipated loading. If additional capacity is required, KSM is to be
notified so that our recommendations can be amended as required.
Limitations – Environmental conditions, wetland delineation, water quality, and
municipal requirements are not a part of this report.
1912 Lynx Drive
Fort Pierce, Florida
KSM Project #: 219325-b2
Page 3 of 3
We are pleased to have been of assistance to you on this phase of your project. When
we may be of further service to you or should you have any questions, please feel free
to contact us.
Respectfully,
_______________________ _______________________
Robert T. Maxwell, E.I. Joseph A. Eduardo, P.E.
Geotechnical Engineer Senior Geotechnical Engineer
Florida E.I. No. 1100024249 Florida License No. 33318
2/24/2022
JAE/cv/RTM
Email to: pandvproperties@gmail.com
02-24-2022
Soil Boring
Location Plan
1912 Lynx Drive
Fort Pierce, Florida
KSM Project #: 219325-b2
NOT TO SCALE
20220218219325-b2
PROJECT:
DATE:
SCALE:
SHEET OF DRAWN BY:
DESIGNED BY:
PROJECT #:
C.V.
C.C.C.1
1912 Lynx Drive, Fort Pierce, Florida
PERMIT #:
1
LOCATION OF SOIL TESTING
B-2
B-1
B-3
B-4
Soil Boring Logs
1912 Lynx Drive
Fort Pierce, Florida
KSM Project #: 219325-b2
Brown Sand, Slightly Clayed
Brown Sand
Gray Sand, Slightly Silty with Traces of Shell
Dark Gray Clayed Silt with Traces of Organics
Gray Sand, Slightly Silty
No Sample Recovered
Bottom of borehole at 15.0 feet.
SS
SS
SS
SS
SS
SS
SS
2-2-3
(5)
5-8-11
(19)
6-6-8
(14)
4-3-2
(5)
2-6-11
(17)
3-4-5
(9)
5-5-5
(10)
NOTES See Attached Location Plan
GROUND ELEVATION
LOGGED BY SF/MH/RC
DRILLING METHOD Split Spoon Sample
DRILLING CONTRACTOR GROUND WATER LEVELS:
CHECKED BY CCC
DATE STARTED 2/17/22 COMPLETED 2/17/22
AT TIME OF DRILLING 6.67 ft
AT END OF DRILLING ---
AFTER DRILLING ---
HOLE SIZE inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0
5
10
15 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf) SPT N VALUE
20 40 60 80
PAGE 1 OF 1
BORING NUMBER B-1
CLIENT Complete Construction
PROJECT NUMBER 219325-b2
PROJECT NAME 1912 Lynx Drive
PROJECT LOCATION Fort Pierce, Florida
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/18/22 15:42 - K:\KSM FILES\21 DOCS (KSM-SERVER)\219325\SOIL INVESTIGATION\219325-B2.GPJKSM Engineering & Testing
P.O. Box 78-1377
Sebastian, FL 32978
Tel: (772)-589-0712
Fax: (772)-589-6469
KSM
Brown Sand, Slightly Clayed
Brown Sand
Gray Sand, Slightly Silty with Traces of Shell
Dark Gray Clayed Silt with Organics
Light Gray Sand
Bottom of borehole at 10.0 feet.
SS
SS
SS
SS
SS
2-3-4
(7)
6-8-12
(20)
7-8-9
(17)
8-6-4
(10)
6-11-13
(24)
NOTES See Attached Location Plan
GROUND ELEVATION
LOGGED BY SF/MH/RC
DRILLING METHOD Split Spoon Sample
DRILLING CONTRACTOR GROUND WATER LEVELS:
CHECKED BY CCC
DATE STARTED 2/17/22 COMPLETED 2/17/22
AT TIME OF DRILLING 6.25 ft
AT END OF DRILLING ---
AFTER DRILLING ---
HOLE SIZE inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0
5
10 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf) SPT N VALUE
20 40 60 80
PAGE 1 OF 1
BORING NUMBER B-2
CLIENT Complete Construction
PROJECT NUMBER 219325-b2
PROJECT NAME 1912 Lynx Drive
PROJECT LOCATION Fort Pierce, Florida
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/18/22 15:42 - K:\KSM FILES\21 DOCS (KSM-SERVER)\219325\SOIL INVESTIGATION\219325-B2.GPJKSM Engineering & Testing
P.O. Box 78-1377
Sebastian, FL 32978
Tel: (772)-589-0712
Fax: (772)-589-6469
KSM
Brown Sand, Slightly Clayed
Brown Sand, Slightly Clayed with Traces of Shell Fragments
Dark Brown Sand, Slightly Silty and Slightly Clayed
Gray Sand, Slightly Silty with Some Shell
Dark Brown Clayed Silt with Organics
Gray Sand with Traces of Shell
No Sample Recovered
Bottom of borehole at 15.0 feet.
SS
SS
SS
SS
SS
SS
SS
2-1-3
(4)
18-15-13
(28)
9-9-10
(19)
9-6-3
(9)
1-1-2
(3)
2-4-4
(8)
3-4-4
(8)
NOTES See Attached Location Plan
GROUND ELEVATION
LOGGED BY SF/MH/RC
DRILLING METHOD Split Spoon Sample
DRILLING CONTRACTOR GROUND WATER LEVELS:
CHECKED BY CCC
DATE STARTED 2/17/22 COMPLETED 2/17/22
AT TIME OF DRILLING 5.67 ft
AT END OF DRILLING ---
AFTER DRILLING ---
HOLE SIZE inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0
5
10
15 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf) SPT N VALUE
20 40 60 80
PAGE 1 OF 1
BORING NUMBER B-3
CLIENT Complete Construction
PROJECT NUMBER 219325-b2
PROJECT NAME 1912 Lynx Drive
PROJECT LOCATION Fort Pierce, Florida
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/18/22 15:42 - K:\KSM FILES\21 DOCS (KSM-SERVER)\219325\SOIL INVESTIGATION\219325-B2.GPJKSM Engineering & Testing
P.O. Box 78-1377
Sebastian, FL 32978
Tel: (772)-589-0712
Fax: (772)-589-6469
KSM
Brown Sand, Slightly Clayed
Dark Brown Sand
Dark Brown Sand, Slightly Silty with Traces of Clay
Dark Brown Clayed Silt with Organics
Gray Sand with Traces of Shell
Bottom of borehole at 10.0 feet.
SS
SS
SS
SS
SS
2-4-6
(10)
8-12-13
(25)
6-8-8
(16)
3-2-3
(5)
1-1-6
(7)
NOTES See Attached Location Plan
GROUND ELEVATION
LOGGED BY SF/MH/RC
DRILLING METHOD Split Spoon Sample
DRILLING CONTRACTOR GROUND WATER LEVELS:
CHECKED BY CCC
DATE STARTED 2/17/22 COMPLETED 2/17/22
AT TIME OF DRILLING 5.92 ft
AT END OF DRILLING ---
AFTER DRILLING ---
HOLE SIZE inches
FINES CONTENT (%)
20 40 60 80
20 40 60 80
PL LLMC
DEPTH(ft)0
5
10 GRAPHICLOGMATERIAL DESCRIPTION
SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE)POCKET PEN.(tsf)DRY UNIT WT.(pcf) SPT N VALUE
20 40 60 80
PAGE 1 OF 1
BORING NUMBER B-4
CLIENT Complete Construction
PROJECT NUMBER 219325-b2
PROJECT NAME 1912 Lynx Drive
PROJECT LOCATION Fort Pierce, Florida
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 2/18/22 15:42 - K:\KSM FILES\21 DOCS (KSM-SERVER)\219325\SOIL INVESTIGATION\219325-B2.GPJKSM Engineering & Testing
P.O. Box 78-1377
Sebastian, FL 32978
Tel: (772)-589-0712
Fax: (772)-589-6469
KSM