Loading...
HomeMy WebLinkAboutCertificate Of Termite Treatment Final -27-15 p1lanning &Development services BuNing&Coda Regulation WAstan 2300 Worghfaa Ave Fort ReIrCer FL 34982 772-462-2172 Fax 772-462-6443 CERTIFECATE OF TERMITE TREATMENT CONSTRUMON SORL TREATMENT 0 B ADDRESS:PERMIT #. -.3-6 La j C4-54!���X &ck+ Pie BUILDER/CONTRACTOR: V 6M PEST CONTROL CONTRACTOR: bjq -r-am tic, - PEST CONTROL LICENSE #: We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance wl the standards of the National Pest Control Association. Square feet if area treated:qW-f1f1ze0o4/P Chemicals used: Percentage of solution: Total gallons used, 1 �T Date of Treatment: Time of Treatment: 3 0 Footing Slab R E: -Vt Treatment It Treatment Re-Treat —Re-Treat AUG 2-7 2015 -��Driveway Pools �il Treatment —lt Treatment R -Treat Re-Treat Perlmeter for Final Inspection Re-Treat Signature of Extermiddtor Not,-.- 777are must be a completed form for each required treatment or re-treatment and this ionn must be on the job site to be picked up by the inspector at time of each inspection or the scheduled Inspection will fall and a-re-Inspection fee charged FOCID4.2.6 certificate ofProtect(ve Treatment forprevention of termites. A weather res1stantj.0b5ffie posting board shall be provided to rarelve duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used,Identity of the applicator,time and date of the treatment,site location,area treated,chemical used,percent concentration and number ofgallons used, to establish a venflable record of protective treatment. if the soil chemical barrier method for termite prevention Is used,final exterior treatment shall be completed prior to final bullding approval. St Lude County requires for the flnall inspection for CO3 a perminent Welker t.o be placed an the eledrIcaii panel box cover,flatIng all the treatments and dates of applications.