Loading...
HomeMy WebLinkAboutEnvironmental ProtectionQePart oe i �F 0 o � o 0 n�en#al P< Florida Department of Environmental Protection ,SOUTHEAST DISTRICT OFFICE 3301 GUN CLUB ROAD, MSC 7210-1 WEST PALM BEACH, FL 33406 561-681-6600 Mary & Glen Eberle 65 Aqua Ra Dr., Jensen Beach, FL 34957 Sent via e-mail: ieiner ,bellsouth.net Re: File No.: 56-0180856-003-EE File Name: Eberle Dear Mr. and Mrs. Eberle, Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Noah Vaienstein, - ,:Secretaryo 0 A aw RECEIVED NOV 13 2017 Permitting Department St. Lucie County, FL U � fsl 9 o 14. a w t.;ZaW On October 16, 2017, we received your application for an exemption to install 25 In. ft. of UNdS: N Z retaining wall. The project is located uplands of a canal off the Indian River, Class III W9 adjacent to 65 Aqua Ra Dr., Jensen Beach, FL 34957 (Section 11, Township 37 South, Range 41 East), in St. Lucie County (Latitude N 27' 15' 52.32', Longitude W 80' 12' 21.95"). This determination does not convey or create any property right, , or any interest in real property. This determination does not authorize any trespass, entrance upon, or activities on property which is not owned or controlled by you, or convey any rights or privileges other than those specified in this determination and applicable rules and statutes. You shall hold and save the Department harmless from any and all damages, claims, or liabilities which may arise by reason of the activities described in this de aU1D FIK NCORRECTIONS structure/activities. REQUIRED BY PIELD INSPECTORS THAT MAY DE NECE88ARY IN ORDER To' Your request has been reviewed to determine whether it qualifies proprietary authorization (related to state-owned submerged lands), and (3) federal approval that may be necessary for work in wetlands or waters of the United States. 1. Regulatory Review — NOT REQUIRED Based on the information you submitted, we have determined that your project is not within the jurisdiction of the Department, pursuant to Chapter 373, Florida Statutes (F.S.), because all of the construction will take place on uplands. Therefore, no further authorization is required. Any modifications to your plans should be submitted for review, as changes may result in permits being required. No temporary dredging or filling, slope grading or equipment access is allowed in jurisdictional waters during project construction. The Department's jurisdiction may extend above mean high water where listed wetland species occur as defined in Rule 62-340, Florida Administrative Code. CC4�EG:EC FASTENERS 17RATTACHMENTS www.dep.state.fl.us A!', ?,' !?+_'SFOPJS!s!Ll i�; OF THEle COPY �..... Ci�i�inACTOA OF RECORD t � � 1 Y i�R da 'S aW .:,.�11 � .. u., .. .s � � �1 ' .. l �� i. a ., � t � 1 i .. .... � Y . . � . File No.: 56-0180856-003-EE File Name: Eberle Page 2 of 5 This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification will expire after one year, and will not be valid at any other time if site conditions materially change, the project design is modified, or the statutes or rules governing the exempt activity are amended. However, .the activity may still be conducted without further notification to. or verification from the - Department after the one-year expiration of this verification, provided: 1) the project design does not change; 2) site conditions do not materially change; and 3) there are no changes to the statutes or rules governing the exempt activity. In the event you need to re -verify the exempt status for the activity after the one-year expiration of this verification, a new application and verification fee will be required. Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required. Conditions of compliance with the regulatory exemption are contained in Attachment A. 2. Proprietary Review — NOT REQUIRED The activity does not appear to be located on sovereign submerged lands, and does not require further authorization under chapter 253 of the Florida Statutes, or chapters 18-20 or 18-21 of the Florida Administrative Code. 3. Federal Review — SPGP NOT REGULATED Your proposed activity as outlined on your application and attached drawings has been reviewed for compliance with the State Programmatic General Permit V and it has been determined to not be within the jurisdiction of the Corps. No further permitting for these activities is required -by the Corps. Authority for review - an agreement with the USACOE entitled "Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection, or Duly Authorized Designee, State Programmatic General Permit", Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act. Additional Information This letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. Please retain this letter. The activities may be inspected by authorized state personnel in the future to insure compliance with appropriate statutes and administrative codes. If the activities are not in compliance, you may be subject to penalties under Chapter 373, F.S., and Chapter 18-14, F.A.C. NOTICE OF RIGHTS This action is final and effective on the -date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until further order of the Department. Because the administrative hearing process is designed to formulate final agency action, the filing of a petition means that the Department's final action may be different from the position taken by it in this notice. File No.: 56-0180856-003-EE File Name: Eberle Page 3 of 5 Petition for Administrative Hearing A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rule 28- 106.201, F.A.C., a petition for an administrative hearing must contain the following information: (a) The name and address of each agency affected and each agency's file or identification number, if known; (b) The name, address, any email address, any facsimile number, and telephone number of the petitioner; the name, address, and telephone number of the petitioner's representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner's substantial interests are or will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate; (e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and (g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency's proposed action. The petition must be filed (received by the Clerk) in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing. Time Period for Filing a -Petition In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S. must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice, whichever occurs first. Under Section 120.60(3), F.S., however, any person who has asked the Department for notice of agency action may file a petition within 21 days of receipt of such notice, regardless of the date of publication. The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. Extension of Time Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are' affected by the Department's action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time. File No.: 56-0180856-003-EE File Name: Eberle Page 4 of 5 Requests for extension of time must be filed with the -Office of General Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-3000, before the applicable deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Mediation Mediation is not available in this proceeding. FLAWAC Review The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when the order is filed with the Clerk of the Department. Judicial Review Any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S., by filing a Notice of Appeal pursuant to Rules 9.110 and 9.190, Florida Rules of Appellate Procedure, with the Clerk of the Department in the Office of General Counsel, 3900 Commonwealth Boulevard, M.S. 35, Tallahassee, Florida 32399-3000; and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate District Court of Appeal. The Notice of Appeal must be filed within 30 days from the date this action is filed with the Clerk of the Department. Thank you for applying to the Submerged Lands and Environmental Resource Permit Program. If you have any questions regarding this matter, please contact Emily Powell at the letterhead address or at (561) 681-6633 or by email at Emily.Powellndep.state.fl.us Executed in Orlando, Florida. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Monica Sovacool Environmental Manager Southeast District File No.: 56-0180856-003-EE File Name: Eberle Page 5 of 5 CERTIFICATE OF SERVICE The undersigned duly designated deputy clerk hereby certifies that this permit and all copies were sent on the filing date below to the following listed persons: FDEP — Monica Sovacool, Emily Powell FILING AND ACKNOWLEDGMENT FILED, on this date, pursuant to Section 120.52, F. S., with the designated Department Clerk, receipt of which is hereby acknowledged. Q November 2, 2017 Clerk Date Enclosures: Attachment A- Specific Exemption Rule General Conditions for use of the Federal SPGP V Project Drawings, 4 pages General Conditions for Federal Authorization for SPGP V 1. The time limit for completing the work authorized ends on July 26, 2021. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third parry in compliance with General Condition below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit, you must obtain the signature of the new owner on the enclosed form and forward a copy of the permit to this office to validate,the transfer of this authorization. 5.. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does -not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 2. Limits of Federal Liability. In issuing this permit; the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or Construction deficiencies associated with the permitted work. e. Damage claims associated with any future modification, suspension, or revocation of this permit. 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any ,time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following: a. You fail to comply with the terms and conditions of this permit. b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 3 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date the enclosed form. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation or alteration. Department of the Army Permit Transfer for SPGP V PERMITEE: PERMIT NUMBER: DATE: ADDRESS/LOCATION OF PROJECT: 0 (Subdivision) (Lot) (Block) When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property.` Although the construction period for works authorized by Department of the ArmYpermits is finite, the permit itself, with its limitations, does not expire. To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Branch, Post Office Box 4970, Jacksonville, FL 32232-0019. (Transferee Signature) (Date) (Name Printed) (Street address) (Mailing address) (City, State, Zip Code) STANDARD MANATEE CONDITIONS FOR IN -WATER WORK 2011 The permittee shall comply with the following conditions intended to protect manatees from direct project effects: a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act. b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. All on -site project personnel are responsible for observing water -related activities for the presence of manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving. e. Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-3922. Collision and/or injury. should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772- 562-3909) for south Florida, and to FWC at ImperiledSpecies(a-myFWC.com f. Temporary signs concerning manatees shall be posted prior to and during all in -water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used (see MyFWC.com/manatee). One sign which reads Caution: Boaters must be posted. A second sign measuring at least 81/2" by 11" explaining the requirements for "Idle Speed/No Wake" and the shut down of in -water operations must be posted in a location prominently visible to all personnel engaged in water -related activities. Questions concerning these signs can be sent to the email address listed above. CAUTION: MANATEE HABITAT All project vessels IDLE SPEED/NO WAKE When a manatee is within 50 feet of work all in -water activities must SHUT DOWN Report any collision with or injury to a manatee: Wildlife Alert: fr•l "..j ^ "E11� 1-888-404-FWCC (3922) cell * FWC or #FWG UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Southeast Regional Office 263 13th Avenue South St. Petersburg, FL 33701 SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS The permittee shall comply with the following protected species construction conditions: a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water -related activities for the presence of these species. b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled,' be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg,, Florida. d. All vessels associated with the construction project shall operate at "no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four -foot clearance from the bottom. All vessels will preferentially follow deep -water routes (e.g., marked channels) whenever possible. e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local authorized sea turtle stranding/rescue organization. g. Any special construction conditions, required of your specific project, outside these general conditions, if applicable, will be addressed in the primary consultation. h. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at (727- 824-5312). i. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takereport.nmfsser(@noaa. gov. j. Sea turtle and marine stranding/rescue organizations' contact information is available by region at http://www.rimfs.noaa.goy/i)r/health/networks.htm. k. Smalltooth sawfish encounters shall be reported to http•//www flmnh.ufl.edu/fish/sharks/sawfish/sawfishencounters.htnil. 1. All work must occur during daylight hours. -`z g t a EwrzS J {rYrrs; n f' iIT �P . 1 cy c r S:. fill � rn 3 EBERLE 65 AQUA RA DRIVE JENSEN BEACH . —..._`a......... —... ..—.._�.._._.-1 { Jerner&Associates Inc. __;... -k__.- -. i—j--- Marine& Environmental Consulting Date: 1016117 2537SEAIfonsoAve. Port St. Lucie,FL34952 Ph.(772)283-2950 JERNERNELLSOUTH.NET SHEET 1 Of Ely Permit Number 43-180856-003-EE ro Southeast District A?0 LOT 4 A OCK. 3 -L V'l 9 EXISTING 150'+1- BULKHEAD 171M 210-00" OwIf MIS, mr � Z.Whl p SM - -- 1-1— CMIMC-A f. 6WI/ If '$ —'*'A� (uff, 111p 4X efllr� 4 J PROPOSED 25'WOOD BULKHEAD EXTENSION .Lor 2 BLOCK .5 EXISTING DOCK WATER CONSERVATION AREA I"= 30' .... .. . .... jcrner &Associates, Inc. SHEET EBERLE .--I Marine & Environmental Consulting Date: 1016117 65 AQUA RA DRIVE 2537SEAlfoilsoAve P01TSLLucicFL34952 Ph.(772)283-o2950 PROPOSED SITE JERNEMBELLSOUTHNET JENSEN BEACH CONDITIONS rzlagfl ll ._Y �. � .... ..� _L3I�I'H_LilOS773£Ic�2I3N2I3� i -�-- ZS66£7�`�un7•aS�aoJ •a,�dosuoJldHSL£SZ �� � 8ui]insuoOiuju2muoiinu3,pOUMnyV 16/9/06:aleO •3ul salbijossv p J)Lijal t — —; ---- — L_...J-_...... ........ 8-gHSVM 9GH HO V30 N3SN�r 3AI80 va enb v S9 37LGE73 ;$TATg OP 10t O .p 1 d 7 b b v Lb 31d7d JOH „E ' HO b3 0 313YONOO 1 119 X ,Z X ,Z L ' 65 Aqua.Ra Driv_e_. inin drive=tivdrk_ ty LineRd Dr'-,- T. Yx -Jensen vis`yxVd Geysg - Beach Park Jensen,Beack- NE wcn { 2 EBERLE 65 AQUA RA DRIVE JENSEN BEACH P.E. # 7245t 1402 HarWO.11-ad Li 5 f. Jerner & Associates, Inc. vm Marine & Environmental Consulting Date: 1016117 2537 SE Alfonso Ave Port St. Lude, FL34952 Ph.(772)283-2950 JERNEWBELLSOUTH.NET 1 140 4-`'z Dan1e19'mL-R "rfgv' P.E. # 724Vc a 4 n e$ 1402 Hart n EBERLE Fai Jerner & Associates, Inc. plarcep't. ; i�; : 2 • .. , 65 AQUA RA DRIVE Marine &Environmental Consulting 2537SEAlfonsoAve. Port St. Lurie, FL34952 Date: 1016117 , (- JENSEN BEACH I Ph(772)283-2950 ERNER@BELLSOLITH.NET EXISTING SITE CONDITIONS !� ,� ,���:,�:...., � .LOT 4 BLOCK 3 wcurr rA {. i 62 EXISTING 150' +1- BULKHEAD EBERLE 65 AQUA RA DRIVE JENSEN BEACH rAYnt A-97 dr.z mn.ao Avo LOT 2 BLOCK 3 �r r[a-ly ©r+irf e � cartr,xv L r3 BL G, L-E'a-IF E 7, ADfNMW 19MAVG'PAA ,90ING FAA G£R71A'CA t. &IN H A 2 MACOAS moy ppecr. J. 41(O REA a. OfRISRV SYIRtg'l�i SUMEY "A. , 16WATURE AMOMAPPf _ . PROPOSED 25' WOOD BULKHEAD EXTENSION S8936220W 21Q.00 Daniel Paul i®t ord, 41 P.E. ¢k'f-45V :) EXISTING DOCK c; WATER CONSERVATI " `O ..r jerner &Associates, Inc. SHEET 3 Marine & Environmental Consulting Date: 10/6/17 2537SEA1fonsoAve. Port St. Lucie,FL34952 _ Ph.(772)283-2950 PROPOSED SITE jERNER@BELLSouTH.NET CONDITIONS y:� <� 2' x 2' x 6" PRECAST CONCRETE DEADMAN @ EACH PILE 2? 3" HDG WASHER, PLATE AND NUT EBERLE 65 AQUA RA DRIVE JENSEN BEACH FASTENED W 2 PCS. 3" S. S. SCREWS @ 24" O. C. MAX. ,***,\ HDG WASHER & NUT ""X 12" co P y m z m 1 1n &-y, P.E. # 72461 1402Hartman:Rba�d.f_� ,4 • :; Ili I t t . 77-7 Jerner & Associates, Inc. Marine & Environmental Consulting Date: 1016117 — 2537SE Alfonso Ava Port St. Lucie,FL34952 Ph.(772)283-2950 - - F JERNER@BELLSOUTH.NET -A' 2' x 2' x 6" PRECAST CONCRETE DEADMAN @ EACH ,PILE. CONCRETE TO HAVE COMPRESSIVE STRENGTH OF ,__ 5000 PSI @28 DAYS 4 3" HDG WASHER, PLATE AND NUT EBERLE 65 AQUA RA DRIVE JENSEN BEACH HDG WASHER FASTENED W 2 PCS. 3" S. S. & NUT SCREWS @ 24" O.C. MAX. *\, 2" X 12" Jerner & Associates, Inc. Marine & Environmental Consulting 2537SE Alfonso Ave. Port St. Lucie, FL34952 Ph.(772)283-2950 JERNEMELLSOLITHWET Date: 1016117 SHEET 4