Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutAPPROVED, Structural - 121093_ Jahn, DonaldRE:CERTIFICATION LETTER
Project Address: DONALD JAHN RESIDENCE
5612 SPRUCE DR
FORT PIERCE, FL 34982
Design Criteria:
- Applicable Codes = 2020 FLBC/FLEBC 7th Edition, 2020 FLRC 7th Edition, 2018 IEBC/IBC, ASCE 7-16 and 2018 NDS
- Risk Category = II
- Wind Speed = 160 mph, Exposure Category C, Partially/Fully Enclosed Method
- Ground Snow Load = 0 psf
- Roof 1 : 3 x 15 @ 58" OC, Roof DL = 7 psf, Roof LL/SL = 20 psf (Non-PV), Roof LL/SL = 0 psf (PV)
- Roof 2 : 3 x 15 @ 58" OC, Roof DL = 7 psf, Roof LL/SL = 14 psf (Non-PV), Roof LL/SL = 0 psf (PV)
To Whom It May Concern,
Sincerely,
February 22, 2022
Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive
compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above.
Additionally, the PV module assembly including attachment hardware has been reviewed to be in accordance with the manufacturer’s
specifications and to meet and/or exceed the requirements set forth by the referenced codes.
A structural evaluation of loading was conducted for the above address based on the design criteria listed above.
Existing roof structural framing has been reviewed for additional loading due to installation of PV Solar System on the roof. The structural
review applies to the sections of roof that is directly supporting the solar PV system.
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 1/8
Roof 1 20°OK IEBC 5% IMPACT CHECK
Roof 2 40°OK IEBC 5% IMPACT CHECK
MOUNTING PLANE
Roof 1
Roof 2
RESULTS SUMMARYBARUN CORP
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
RESULTMOUNTING PLANE ROOF PITCH
(deg.)GOVERNING ANALYSIS
MOUNTING PLANE STRUCTURAL EVALUATION
STANDOFF HARDWARE EVALUATION FOR WIND UPLIFT
UPLIFT DCR
80.9%
95.1%
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 2/8
PV module weight 2.50 psf
Hardware assembly weight 0.50 psf
Total PV System Dead Load PV-DL =3.00 psf
Existing Roofing Material 1 Layer(s)1.50 psf
Underlayment 0.50 psf
Plywood Sheathing 1.50 psf
Framing Weight 2.05 psf
Vaulted ceiling No 0.00 psf
Miscellaneous 1.50 psf
Total Roof Dead Load R-DL =7.05 psf
EXPRESSION
Roof Live Load Lo 20.00 psf
Member Tributary Area At < 200 sf
Roof 1 Pitch 5/12 or 20°
Trubutary Area Reduction R1 1.00
Slope Roof Reduction R2 0.98
Reduced Roof Live Load Lr = Lo (R1) (R2) =19.50 psf
Ground Snow Load pg =0.00
Effective Roof Slope 20°
Snow Importance Factor Is =1.00
Snow Exposure Factor Ce =1.00
Snow Thermal Factor Ct =1.10
Minimum Flat Roof Snow Load pf-min =0.00
Flat Roof Snow Load pf =0.00 psf
Roof Slope Factor Cs-roof =0.83
Sloped Roof Snow Load on Roof ps-roof =0.00 psf
Roof Slope Factor Cs-pv =0.83
Sloped Roof Snow Load on PV Panel ps-pv =0.00 psf
REDUCED ROOF LIVE LOAD (Lr)
VALUE
MATERIAL/ROOFING DETAILS VALUEROOF DEAD LOAD (R-DL)
3 x 15 @ 58 in. O.C.
VALUE
Standing Seam Roof
SNOW LOAD
BARUN CORP Roof 1
LOAD CALCULATION
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
VALUE
PV SYSTEM DEAD LOAD (PV-DL)
SLOPED ROOF SNOW LOAD ON PV PANEL (Unobstructed Slippery Surfaces)
SLOPED ROOF SNOW LOAD ON ROOF (Non-Slippery Surfaces)
VALUE
VALUE
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 3/8
EXISTING
7.05 psf
19.50 psf
0.00 psf
EXISTING
21.24 psf
6.13 psf
21.24 psf
-47.43%OK
2018
BARUN CORP IEBC 5% IMPACT CHECK
Roof 1
Roof Snow Load (SL) =
The requirements of section 806.2 of 2018 IEBC are met and the structure is permitted to remain unaltered.
IEBC Provision :
Load Increase (%) =
(DL + Lr)/Cd =11.16
(DL + SL)/Cd =8.74
Maximum Gravity Load =11.16
0.00
WITH PV PANEL
WITH PV PANEL
Roof Dead Load (DL) =10.05
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
Roof Live Load (Lr) =0.00
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 4/8
160 20°
II Gable
C 0.85
25 1
3.00 0.95
300.00 lbs
2.42
1.65
2.42
1.65
2.21
1.65
ROOF ZONE GCp (-) UPLIFT
1 & 2e -2.00
2n - 3e -3.00
3r -3.60
Max. Y - Spacing (ft) (Zone 3r)3.65
-66.55 242.68
UPLIFT PRESSURE (psf) PULLOUT FORCE (lbs)
-36.22 144.43
-55.18 220.02
* Wind calculation is based on ASCE 7-16, 29.4 - C&C, LC#7: 0.6D + 0.6W used.
Max. Y - Spacing (ft) (Zone 2n - 3e)3.99
Max. X - Spacing (ft) (Zone 3r)Effective Wind Area (ft2)
Solar Array Pressure Eq. Factor (γa) =0.60
Hardware Type :S-5! SOLARFOOT
Allowable Load =
Max. X - Spacing (ft) (Zone 1 & 2e)Effective Wind Area (ft2)
Max. Y - Spacing (ft) (Zone 1 & 2e)3.99
Max. X - Spacing (ft) (Zone 2n - 3e)Effective Wind Area (ft2)
BARUN CORP WIND UPLIFT CALCULATION
Roof 1
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
Ultimate Wind Speed (mph) =Roof Pitch (deg.) =
SITE INFORMATION
Risk Category =Roof Type =
Array Edge Factor (γE) =1.00
Exposure Category =Kd =
Mean Roof Height (ft) =Kzt =
Solar Array Dead Load (psf) =Kz =
DESIGN CALCULATIONS
Wind Velocity Press. (qh) = 0.00256*Kz*Kzt*Kd*Ke*V2 =52.66 psf
a (ft) =4.00
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 5/8
PV module weight 2.50 psf
Hardware assembly weight 0.50 psf
Total PV System Dead Load PV-DL =3.00 psf
Existing Roofing Material 1 Layer(s)1.50 psf
Underlayment 0.50 psf
Plywood Sheathing 1.50 psf
Framing Weight 2.05 psf
Vaulted ceiling No 0.00 psf
Miscellaneous 1.50 psf
Total Roof Dead Load R-DL =7.05 psf
EXPRESSION
Roof Live Load Lo 20.00 psf
Member Tributary Area At < 200 sf
Roof 2 Pitch 10/12 or 40°
Trubutary Area Reduction R1 1.00
Slope Roof Reduction R2 0.70
Reduced Roof Live Load Lr = Lo (R1) (R2) =14.00 psf
Ground Snow Load pg =0.00
Effective Roof Slope 40°
Snow Importance Factor Is =1.00
Snow Exposure Factor Ce =1.00
Snow Thermal Factor Ct =1.10
Minimum Flat Roof Snow Load pf-min =0.00
Flat Roof Snow Load pf =0.00 psf
.
Roof Slope Factor Cs-roof =0.50
Sloped Roof Snow Load on Roof ps-roof =0.00 psf
Roof Slope Factor Cs-pv =0.50
Sloped Roof Snow Load on PV Panel ps-pv =0.00 psf
PV SYSTEM DEAD LOAD (PV-DL)VALUE
3 x 15 @ 58 in. O.C.
BARUN CORP LOAD CALCULATION
Roof 2
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
REDUCED ROOF LIVE LOAD (Lr)
Standing Seam Roof
VALUE
ROOF DEAD LOAD (R-DL)MATERIAL/ROOFING DETAILS VALUE
VALUE
VALUE
VALUE
SNOW LOAD
SLOPED ROOF SNOW LOAD ON ROOF (Non-Slippery Surfaces)
SLOPED ROOF SNOW LOAD ON PV PANEL (Unobstructed Slippery Surfaces)
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 6/8
EXISTING
7.05 psf
14.00 psf
0.00 psf
EXISTING
16.84 psf
6.13 psf
16.84 psf
-33.70%OK
2018
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
BARUN CORP IEBC 5% IMPACT CHECK
Roof 2
Roof Snow Load (SL) =0.00
WITH PV PANEL
(DL + Lr)/Cd =11.16
WITH PV PANEL
Roof Dead Load (DL) =10.05
Roof Live Load (Lr) =0.00
IEBC Provision :
The requirements of section 806.2 of 2018 IEBC are met and the structure is permitted to remain unaltered.
(DL + SL)/Cd =8.74
Maximum Gravity Load =11.16
Load Increase (%) =
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 7/8
160 40°
II Gable
C 0.85
25 1
3.00 0.95
300.00 lbs
2.42
1.65
2.42
1.65
2.21
1.65
ROOF ZONE GCp (-) UPLIFT
1 - 2r -1.80
2n & 3r -2.00
3e -2.80
Max. Y - Spacing (ft) (Zone 3e)3.65
-78.24 285.29
* Wind calculation is based on ASCE 7-16, 29.4 - C&C, LC#7: 0.6D + 0.6W used.
UPLIFT PRESSURE (psf) PULLOUT FORCE (lbs)
-49.80 198.86
-55.49 221.57
Max. X - Spacing (ft) (Zone 2n & 3r)Effective Wind Area (ft2)
Max. Y - Spacing (ft) (Zone 2n & 3r)3.99
Max. X - Spacing (ft) (Zone 3e)Effective Wind Area (ft2)
Allowable Load =
Max. X - Spacing (ft) (Zone 1 - 2r)Effective Wind Area (ft2)
Max. Y - Spacing (ft) (Zone 1 - 2r)3.99
4.00
Solar Array Pressure Eq. Factor (γa) =0.60
Hardware Type :S-5! SOLARFOOT
Ultimate Wind Speed (mph) =Roof Pitch (deg.) =
Risk Category =Roof Type =
Array Edge Factor (γE) =1.50
Exposure Category =Kd =
Mean Roof Height (ft) =Kzt =
Solar Array Dead Load (psf) =Kz =
DESIGN CALCULATIONS
Wind Velocity Press. (qh) = 0.00256*Kz*Kzt*Kd*Ke*V2 =52.66 psf
a (ft) =
BARUN CORP WIND CALCULATION
Roof 2
DONALD JAHN RESIDENCE, 5612 SPRUCE DR, FORT PIERCE, FL 34982
SITE INFORMATION
Barun Corp | Design and Engineering | 610.202.4506 | chrisk@barun-corp.com | www.barun-corp.com 8/8