Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
APPROVED PV Plans Stamped - 121927_Cecil, Talor
PV-1FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------THIS PROJECT COMPLIES WITH THE FOLLOWING:2020 7TH EDITION FLORIDA BUILDING CODE: BUILDING2020 7TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL2020 7TH EDITION FLORIDA BUILDING CODE: MECHANICAL2020 7TH EDITION FLORIDA BUILDING CODE: PLUMBING2020 7TH EDITION FLORIDA BUILDING CODE: FUEL GAS2020 7TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION2020 7TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING2020 7TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY2020 7TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)2017 NATIONAL ELECTRIC CODE (NEC)AS ADOPTED BY ST. LUCIE COUNTYSITE LOCATIONCODES:VICINITY MAP:TABLE OF CONTENTS:CONSTRUCTION NOTES:PHOTOVOLTAIC SYSTEMPV-1SITE LOCATIONPV-2SITE PLANPV-2AROOF PLAN WITH MODULES LAYOUTPV-2BSTRUCTURAL CALCULATIONSPV-3MOUNTING DETAILSPV-3AMOUNTING DETAILSPV-4THREE LINE DIAGRAMPV-5CONDUCTOR CALCULATIONSPV-6EQUIPMENT & SERVICE LISTPV-7LABELSPV-7ASITE PLACARDPV-8OPTIMIZER CHARTPV-9SAFETY PLANPV-10SAFETY PLANAPPENDIXMANUFACTURER SPECIFICATION SHEETSCONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS ANDARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS.ALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THE MAXIMUM EXTENTPOSSIBLE AND SHALL BE PAINTED A COLOR SIMILAR TO THE SURFACE UPON WHICH THEY AREMOUNTED.MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION INACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED PERSECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THE FIELD.DIG ALERT (811) TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY PRIOR TO ANYEXCAVATION TAKING PLACESITE LOCATIONPHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER 2017 NEC SEC 250.166(A).SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF ART. 690 OF THE 2017 NECTHE MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR UFERUTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEMSOLAREDGE OPTIMIZERS ARE LISTED TO IEC 62109-1 (CLASS II SAFETY) AND UL 1741 STANDARDSINSTALL CREW TO VERIFY ROOF STRUCTURE PRIOR TO COMMENCING WORK. EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNT.THIS SYSTEM IS DESIGNED FORWIND SPEED: 160 MPHCATEGORY C EXPOSUREGREG ALBRIGHT MSPUMACINVJBINVLCJBSITE PLANSCALE: 1/16" = 1'-0"1ROOF LINEPROPERTY LINEDRIVEWAY(E) MAIN SERVICE PANEL(INTERIOR)(N) 78 REC SOLAR: REC305TP2M PV MODULES(N) SOLAREDGE SE11400H-USRGM [SI1](E) UTILITY METER(N) JUNCTION BOXPV SYSTEM23.790 kW-DC16.400 kW-AC(N) AC DISCONNECT EATON DG223NRB(OR EQUIVALENT)PV-2FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------(N) SOLAREDGE SE5000H-USRGM [SI1]BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10'THIS SYSTEM DESIGNED WITH:WIND SPEED: 160WIND EXPOSURE: CROOF AREA: 3018 SQ FTSITE PLANLEGEND:OBSTRUCTIONPIPE VENTMODULESCONDUITSETBACKMSP AC JBACDISCONNECTMSPJUNCTIONBOXINVINVERTERLCLOADCENTER(E) SHEDGREG ALBRIGHTSPRUCE DRIVE133'-11"83'-0"133'-11"83'-0" 10'-10" 21'-6"31'-3"33'-11"(N) JUNCTION BOX(N) 125A LOAD CENTER MSPUMACINVJBINVLCJBPV-2AFREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------ROOF PLANSCALE: 3/32" = 1'-0"1FIRE ACCESSPATHWAYS(N) 78 REC SOLAR: REC305TP2M(E) UTILITY METERPV SYSTEM23.790 kW-DC16.400 kW-ACNOTES:1. EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNTS2. ATTACHED CLAMPS AT 25% FROM THE EDGE AND 50% FROM THE CENTER OF THE MODULES3. JUNCTION BOX IS MOUNTED TO THE RAIL.ROOF AREA: 3018 SQ FT2' SETBACKS PROPOSED AT ALL THE ROOF EDGES: TOTAL ARRAY AREA = 1400.88 SFTOTAL ROOF AREA = 3018 SFTOTAL ARRAY AREA AS A % TO ROOF AREA = 46.42%BOS WILL BE AS CLOSE AS POSSIBLE TO MSP WITHIN 10'THIS SYSTEM DESIGNED WITH:WIND SPEED: 160WIND EXPOSURE: CROOF PLAN WITH MODULES LAYOUTLEGEND:OBSTRUCTIONPIPE VENTMODULESCONDUITSETBACKMSP AC JBACDISCONNECTMSPJUNCTIONBOXINVINVERTERLCLOADCENTERGREG ALBRIGHTFIRE ACCESSPATHWAYS2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0"2'-0" ROOF AREA STATEMENTROOFMODULE QUANTITYROOF PITCHARRAY PITCHAZIMUTHROOF AREAARRAY AREA11915°15°359°647 SQ FT341.24 SQ FT2915°15°89°401 SQ FT161.64 SQ FT3620°20°89°269 SQ FT107.76 SQ FT4620°20°269°266 SQ FT107.76 SQ FT53515°15°179°1162 SQ FT628.6 SQ FT637°7°269°274 SQ FT53.88 SQ FTPV-2BFREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------ROOF DETAILS:TOTAL ROOF AREA: 3018 SQ FTARRAY COVERAGE: 46.42%SYSTEM DISTRIBUTED WEIGHT: 2.27 LBSS-5!: SOLARFOOT POINT-LOAD: 17.49 LBSCHEMLINK: CHEM CURB POINT-LOAD: 17.49 LBSROOF DETAILSGREG ALBRIGHT (E) METAL ROOF (BY OTHERS)S-5! SOLARFOOTM8-1.25 STAINLESS STEELHEX FLANGE BOLTMETAL TO METAL: 1/4-14 SELFDRILLING SCREW 1-1/2" TO 2-1/2"METAL TO WOOD: 1/4-14 TYPE 17 ABMILLED POINT 1-1/2" TO 2-1/2"(E) METAL ROOF (BY OTHERS)S-5! SOLARFOOT(E) 2X8 RAFTER @ 16" O.C.UNIRAC SM LIGHT RAIL RACKING SYSTEM(N)REC SOLAR: REC305TP2M2X8 RAFTER @ 16" O.C.ROOF ATTACHMENT2' 8"ATTACHMENT DETAILScale: NTSSOLAR PV ARRAY SECTION VIEWScale: NTSPARTIAL ROOF FRAMING PLANScale: NTSPV-3FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------MOUNTING DETAILSMAX ATTACHMENT SPAN - 2' 8" STAGGEREDGREG ALBRIGHT UNIRAC SM LIGHT RAIL RACKING SYSTEM(N) REC SOLAR: REC305TP2M2X8 RAFTER @ 16" O.C.ROOF ATTACHMENT4'5/16" LAGSCREWS WITH2.5" MIN.EMBEDMENT2X8 RAFTER @ 16" O.C.REC SOLAR: REC305TP2MCHEM LINKE CURBUNIRACSTANDOFFUNIRAC SM LIGHT RAIL10" 7°°L-FOOT 1- PART Pourable Sealer or PRO PACK Pourable SealerM-1 Structural SealantAlong StandoffChem CurbAbovePenetrationRoof Surface2.07.5 or 5.02.01.0M-1 Structural SealantAlong PipeM-1 Structural SealantM-1 Structural SealantPV-3AFREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------ATTACHMENT DETAILScale: NTSSOLAR PV ARRAY SECTION VIEWScale: NTSPARTIAL ROOF FRAMING PLANScale: NTSMOUNTING DETAILSMAX ATTACHMENT SPAN - 4' STAGGEREDGREG ALBRIGHT JUNCTIONBOX4 - #10 AWG, PV WIRE1 - #6 AWG IN FREE AIR OR#8 AWG MUST BE IN EMT CONDUITJUNCTIONBOXSOLAREDGE P401 POWER OPTIMIZERSSTRING-12 - #10 AWG, PV WIRE1 - #6 AWG IN FREE AIR OR#8 AWG MUST BE IN EMT CONDUITSTRING-3SOLAREDGE P401POWER OPTIMIZERS19 REC SOLAR: REC305TP2M19 REC SOLAR: REC305TP2MSTRING-219 REC SOLAR: REC305TP2M2 - #10 AWG, PV WIRESOLAREDGE P401POWER OPTIMIZERSSTRING-410 REC SOLAR: REC305TP2MSTRING-511 REC SOLAR: REC305TP2MSOLAREDGE P401POWER OPTIMIZERS4 - #10 AWG, PV WIRE6 - #10 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" ORLARGER EMT CONDUIT4 - #10 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" ORLARGER EMT CONDUITSOLAREDGE P401POWER OPTIMIZERSUM(E) 150A / 2PMAIN BREAKER(TOP FED)(E) 150A RATEDMAIN SERVICE PANEL1PH, 120/240V 60HZ(E) UTILITYMETER(N) LINESIDE TAP VIA ULLISTED CONNECTORS1 - #6 GEC, BARE COPPERFREE AIR BONDEDEXISTING UFER TIE INTO UTILITYOVERHEADFEED(N) 100A FUSEDAC DISCONNECTEATON DG223NRB (OREQUIVALENT)2 - 90 AMP FUSES3 - #3 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" OR LARGER EMT CONDUITA TAPBOX MAY BE USED IN LIEU OF PERFORMING THE LINESIDETAP IN THE MAIN SERVICE PANEL. THIS IS DEPENDENT UPON SITECONDITIONS.3 - #3 AWG, THWN-2IN 3/4" OR LARGER EMT CONDUIT(N) SOLAREDGESE11400H-USRGM [SI1]INVERTER(N) SOLAREDGESE5000H-USRGM [SI1]INVERTERACDCACDC(N) 125A DEDICATEDLOAD CENTER(N)60A/2P(N)30A/2P3 - #10 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" OR LARGER EMTCONDUIT3 - #6 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" OR LARGER EMT CONDUITRAPIDSHUTDOWNSWITCHRAPIDSHUTDOWNSWITCHNOTE:CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASEDON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANTTO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONSBACKFEED FUSE SIZINGMAX. CONTINUOUS OUTPUT 68.50A @ 240V68.50X1.25=86AMPS90A FUSES - OKPV SYSTEM23.790 kW-DC16.400 kW-ACPV-4FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------THREE LINE DIAGRAMGREG ALBRIGHT PV-5FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------CONDUCTOR CALCULATIONSMAKE/MODEL:Voc:Vmp:Isc:Imp:STC RATING:PTC RATING:REC SOLAR: REC305TP2M38.8 V33.3 V10.04 A9.17 A305 W280.4 WMAX DC CURRENT: Imax = 1.25 X (OPTIMIZER OUTPUT CURRENT) = 1.25 X 15 = 18.75AMAX AC CURRENT: Imax = 1.25 X (SUM OF MAX CONTINUOUS OUTPUT CURRENT FROM INVERTERS)= 1.25 X (68.50) = 85.63AMODULE INFOGREG ALBRIGHTWIRE SCHEDULERACEWAY#EQUIPMENTWIRE LOCATIONCONDUCTORQTY.AWGWIRESIZESTARTINGALLOWABLEAMPACITY @ 90°C310.15(B)(16)STARTINGCURRENTAPPLIED TOCONDUCTORSIN RACEWAYTEMPERATURECORRECTIONFACTOR310.15(B)(2)(a)ADJUSTMENTFACTOR FORMORE THAN 3CONDUCTORS310.15(B)(3)(a)ADJUSTEDCONDUCTORAMPACITY@ 90°CMAXIMUMCURRENTAPPLIED TOCONDUCTORSIN RACEWAY1DCMODULETOOPTIMIZERROOF / FREE-AIR2104012.551140.0015.692DCOPTIMIZERTOJUNCTION BOXROOF / FREE-AIR2104015.001140.0018.753DCJUNCTION BOXTOINVERTER 1EXTERIOR WALL6104015.0010.832.0018.754DCJUNCTION BOXTOINVERTER 2EXTERIOR WALL4104015.0010.832.0018.755ACINVERTER 1TODEDICATED LOAD CENTEREXTERIOR WALL367547.501175.0059.386ACINVERTER 2TODEDICATED LOAD CENTEREXTERIOR WALL3104021.001140.0026.257ACDEDICATED LOAD CENTERTOAC DISCONNECTEXTERIOR WALL3311568.5011115.0085.638ACAC DISCONNECTTOPOIEXTERIOR WALL3311568.5011115.0085.63CONDUCTOR AMPACITY CALCULATIONS IN ACCORDANCE WITH NEC 690.8. MATERIAL LIST:PV-6FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------QTY.PARTPART #DESCRIPTION78MODULES117-305REC SOLAR: REC305TP2M78OPTIMIZERS130-401SOLAREDGE P401 POWER OPTIMIZER - FRAME MOUNTED MODULE ADD-ON2JUNCTION BOX480-276600VDC NEMA 3R UL LISTED JUNCTION BOX4CONNECTORS240-300STAUBLI / MULTI-CONTACT MC4 CONNECTORS (FEMALE)4CONNECTORS240-301STAUBLI / MULTI-CONTACT MC4 CONNECTORS (MALE)1INVERTER120-113SOLAREDGE SE11400H-USRGM [SI1] 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN1INVERTER120-503SOLAREDGE SE5000H-USRGM [SI1] 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN1COMBINER PANEL151-101125A DEDICATED LOAD CENTER1AC DISCONNECT321-101100A RATED 240VAC NEMA 3R UL LISTED2FUSES330-09090A FUSE 1 PH 240VAC1FUSE REDUCER330-510100A-60A FUSE REDUCER175ROOF ATTACHMENT 1240-406S-5!: SOLARFOOT7ROOF ATTACHMENT 2520-100CHEMLINK: CHEM CURB37RAIL 1211-100UNIRAC SM LIGHT RAIL 168 INCH (TOTAL 491 FEET NEEDED)75RAIL HARDWARE 1261-517BND T-BOLT AND NUT SS79MODULE CLAMPS 1221-101SM MIDCLAMP PRO DRK79MODULE CLAMPS 1221-202SM ENDCLAMP PRO W/ END CLAMP26SPLICE 1261-600BND SPLICE BAR PRO SERIES MILL79MLPE MOUNT 1261-510MICRO MNT BND TBOLT SS21ACCESSORIES 1211-202E-BOSS CONDUIT MOUNT COMP KIT42ACCESSORIES 1211-200E-BOSS RAIL TRAY14ACCESSORIES 1211-206E-BOSS BRIDGE TRAY23ACCESSORIES 1211-207E-BOSS BRIDGE CLIPS74GROUNDING LUG 1260-300BURNDY GROUND WEEB-LUG128L-FOOT 1241-100UNIRAC L-FOOT SERRATED W/T-BOLT CLEAR (KIT)3RAIL HARDWARE 2261-517BND T-BOLT AND NUT SS4MODULE CLAMPS 2221-101SM MIDCLAMP PRO DRK4MODULE CLAMPS 2221-202SM ENDCLAMP PRO W/ END CLAMP2SPLICE 2261-600BND SPLICE BAR PRO SERIES MILL4MLPE MOUNT 2261-510MICRO MNT BND TBOLT SS1ACCESSORIES 2211-202E-BOSS CONDUIT MOUNT COMP KIT2ACCESSORIES 2211-200E-BOSS RAIL TRAY1ACCESSORIES 2211-206E-BOSS BRIDGE TRAY1ACCESSORIES 2211-207E-BOSS BRIDGE CLIPSGROUNDING LUG 2GROUNDING LUG 2BURNDY GROUND WEEB-LUG6L-FOOT 2241-100UNIRAC L-FOOT SERRATED W/T-BOLT CLEAR (KIT)6ATTACHMENT 2241-300"UNIRAC 4"" STANDOFFS - MILL"2CURB KIT 2261-600"CHEMLINK CHEMCURB 4"" CURB KIT (4 CURBS PER KIT)"2SPLICE BAR 2261-600UNIRAC: BONDING SPLICE BAR SERRATED7T-BOLT 2261-517T-BOLT NUT 3/8 X 3/4 SS2GROUND LUG 2260-300T-BOLT NUT 3/8 X 3/4 SS4T-BOLT 2261-510UNIRAC: MICRO MNT BND T-BOLT 1/4 X 3/4 SS3MOUNTING BRACKET 2211-201UNIRAC: E-BOSS J-BOX MOUNTING BRACKET14LAG BOLT 2261-506UNIRAC HDW LAG BOLT 5/16 X 4BREAKER SIZES:60A PV BREAKER30A PV BREAKERSERVICE LIST:NONEEQUIPMENT & SERVICE LISTGREG ALBRIGHT NOTES:M690.54705.12(B)(2)(3)(b)"WARNING"DUAL POWER SOURCESSECOND SOURCE IS PHOTOVOLTAIC SYSTEM RATED AC OUTPUT CURRENT - 68.50 AMPSAC NORMAL OPERATING VOLTAGE - 240 VOLTSWARNING:POWER SOURCE OUTPUTCONNECTIONDO NOT RELOCATE THISOVERCURRENT DEVICE.TURN RAPIDSHUTDOWN SWITCH TOTHE "OFF" POSITION TOSHUT DOWN PV SYSTEMAND REDUCE SHOCKHAZARD IN THE ARRAY690.56(C)(1)(A)SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWNAC 690.15, 690.54PV SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT - 68.50 AMPSAC NORMAL OPERATING VOLTAGE - 240 VOLTSRAPID SHUTDOWN SWITCH FORSOLAR PV SYSTEM690.56(C)(3)INVERTERARRAYJ/BDC"WARNING"ELECTRICAL SHOCK HAZARD.TERMINALS ON BOTH LINE AND LOAD SIDESMAY BE ENERGIZED IN THE OPEN POSITION690.13 (B)690.53NEC 690.31(G)(3) & (4)PMPV METERSOLAR ELECTRICPV PANELSPV SYSTEM DC DISCONNECTMAXIMUM VOLTAGE: 480VMAXIMUM CIRCUIT CURRENT: 30.5AMAX RATED OUTPUT CURRENT OFTHE CONTROLLER OR DC-TO-DCCONVERTER: 15ATURN RAPID SHUTDOWNSWITCH TO THE "OFF"POSITION TO SHUT DOWNENTIRE PV SYSTEMNFPA 11.12.2.1.1.1.1SOLAR ELECTRICPV PANELSEMERGENCY RESPONDERTHIS SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWNTURN RAPID SHUTDOWNSWITCH TO THE "OFF"POSITION.ONLY CONDUCTORS INSIDEBUILDING OR OFF THEROOF WILL SHUT DOWNNFPA 11.12.2.1.1.1.2SOLAR ELECTRICPV PANELSEMERGENCY RESPONDERTHIS SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWN"WARNING"PHOTOVOLTAIC POWER SOURCEEVERY 10' ON CONDUIT AND ENCLOSURESPV-7FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------LABELSGREG ALBRIGHT1.NEC ARTICLES 690 AND 705 AND FBC SECTION R324MARKINGS SHOWN HEREON.2.ALL MARKING SHALL CONSIST OF THE FOLLOWING:A.UV RESISTANT SIGN MATERIAL WITH ENGRAVED ORMACHINE PRINTED LETTERS OR ELECTRO-PLATING.B.RED BACKGROUND COLOR WHITE TEXT AND LINEWORK.C.ARIAL FONT.3.ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED INTHE LOCATIONS SPECIFIED. SIGNAGE CANNOT BEHAND-WRITTEN.4.SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENTWITH POP-RIVETS OR SCREWS JUNCTION BOX78 PV MODULESUTILITY METERCAUTION:POWER TO THIS BUILDING ISALSO SUPPLIED FROM THEFOLLOWING SOURCES WITHDISCONNECTS AS SHOWNPV-7AFREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------DEDICATEDLOAD CENTER1.NEC ARTICLES 690 AND 705 AND FBC SECTION R324 MARKINGS SHOWN HEREON.2.ALL MARKING SHALL CONSIST OF THE FOLLOWING:A.UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS OR ELECTRO-PLATING.B.RED BACKGROUND COLOR WHITE TEXT AND LINE WORK.C.AERIAL FONT.3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED. SIGNAGE CANNOT BE HAND-WRITTEN.4. SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS.NOTES:SITE PLACARDGREG ALBRIGHTWARNINGTURN OFF PHOTOVOLTAIC AC DISCONNECTPRIOR TO WORKING INSIDE PANELNMAIN SERVICE PANELAC DISCONNECTINVERTER EQUIPPEDWITH RAPID SHUTDOWNSPRUCE DRIVEJUNCTION BOXINVERTER EQUIPPEDWITH RAPID SHUTDOWN 123456789101-1011-2021-3031-4041-5051-60123456789101-1011-2021-3031-4041-5051-60PV-8FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------SOLAREDGE OPTIMIZER CHARTOPTIMIZER CHARTGREG ALBRIGHT SPRUCE DRIVE SAFETY PLANMARK UP KEYINSTRUCTIONS:1.USE SYMBOLS IN KEY TO MARK UP THIS SHEET.2.SAFETY PLAN MUST BE MARKED BEFORE JOBSTARTS AS PART OF THE PRE-PLAN3.DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE& MAKE NOTES ON THE JHA SHEETIN CASE OF EMERGENCYNEAREST HOSPITAL OR OCCUPATIONAL/INDUSTRIAL CLINICNAME: _______________________________________________ADDRESS: ___________________________________________SAFETY COACH CONTACT INFORMATIONNAME: _______________________________________________PHONE NUMBER: _____________________________________ALL EMPLOYEES ON SITE SHALL BE MADE AWARE OF THESAFETY PLAN AND SIGN INDICATING THAT THEY AREAWARE OF THE HAZARDS ON-SITE AND THE PLAN FORWORKING SAFELY. NAME SIGNATURE__________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ ________________DATE: ______________ TIME:___________________________PERMANENT ANCHORTEMPORARY ANCHORINSTALLER LADDERJUNCTION / COMBINER BOXSTUB-OUTSKYLIGHTNO LADDER ACCESS (STEEPGRADE OR GROUND LEVELOBSTRUCTIONS)RESTRICTED ACCESSCONDUITGAS SHUT OFFWATER SHUT OFFSERVICE DROPPOWER LINESPTILBS7ZGASH2OPV-9FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------SAFETY PLANGREG ALBRIGHT JOB HAZARD ANALYSISCrew leader to fill out all sections below, hold a pre-job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site CaptureLadder Access·Ladders must be inspected before each use.·Extension ladders must be set up on a firm and level surface ata 4-to-1 rise to run angle (or 75 degrees) and the top must besecured to the structure. Extension style ladders placed onuneven, loose or slippery surfaces must additionally have thebase firmly anchored or lashed so the base will not slip out.·Extension ladders must be used with walk-through devices orthe ladder must extend 36" above the stepping off point.·A-frame ladders must only be climbed with the ladder spreaderbars locked in the open position; A-frame ladders shall not beclimbed while in the closed position (ex, closed and used whileleaned against a structure).·Additional notes:Mobile Equipment·Only Qualified operators will operate equipment; operators mustmaintain a certification on their person for the equipment beingoperated.·Type(s) of mobile equipment (Type/Make/Model):·Qualified operator(s):Material Handling and Storage·Materials will be staged/stored in a way that does not present ahazard to client, personnel or public. Materials stored on theroof will be physically protect from failing or sliding off.Fall Protection·A site-specific plan for fall prevention and protection is requiredprior to starting work and must remain onsite at all times untilwork is complete; a fall rescue plan must be outlined anddiscussed among the crew prior to work start.·First-person-Up (FPU) must install their anchor and connectbefore any other task, including installing other anchors. TheLast-Person-Down (LPD) must be the only person on a roofuninstalling fall protection.·FPCP (name and title):·FPU and LPD (name and title):Electrical Safety·The Electrical Qualified Person (EQP) is required onsite toperform electrical work.·All electrical work will be performed with equipment in anelectrically safe condition (de-energized) unless approval hasbeen granted prior to work.·Service drops and overhead electrical hazards will be indentifiedand protected from contact, as neccessary.·EQP (name and tile):Public Protection·The safety of the Client and Public must be maintained at alltimes.·The Client and the Public shall be prevented from entering thework zone through the use of barriers and/or signage, asrequired.·Company, Client and Public property shall be protected fromfalling objects.·Pets (including dogs) shall be secured by their owners prior towork start.·The Client should not leave pets, family members, or others incharge or care of Employees, Contractors, or TemporaryWorkers.·Crew leader responsible for communication with the client:·Client and public is excluded from work area by barricades (N/A,Yes, No):Training and Pre-Job Safety Briefing·All employees onsite shall be made aware of the specific hazardsof this project and review this HJA during a pre-job briefing, andtheir signature indicates awareness of site conditions and theplan to eliminate any hazards identified prior to and during theproject.·Crew leader (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):Airborne Contaminants:·Asbestos-containing (Transite) piping (ACP) - Do not disturb(move, drill, cut fracture, etc.)·Asbestos-containing thermal insulation (ACI) andAsbestos-containing duct wrapping (ACW) - do not disturb, noattic or crawlspace access is allowed if work to be performedcould cause exposure to personnel, client or public.·If yes, list specific tasks and protection in place:Weather and Environment·The site supervisor shall forecast the weather conditions at thejob site, prior to crew arrival, in order to mitigate any hazardsassociated with inclement weather (heat, cold, wind, rain, etc.)·The site supervisor will utilized a portable wind meter(anemometer) to verify actual onsite wind conditions, by checkingat the ground and on any elevated work surface (ex, rooftop)prior to work start, at midday and prior to solar panel staging on aroof.·Elevated work involving the moving or maneuvering of solarpanels shall cease at 25mph (sustained wind) until windsubsides.·Forecasted weather maximum temp (degrees f):Heat Related Illness Prevention·Employees shall have access to potable drinking water that isfresh, pure, and suitably cool. The water shall be located asclose as practicable to the areas where employees are working.Water shall be supplied in sufficient quantity at the beginning ofthe work shift to provide at least one quart per employee perhour for drinking for the entire shift. Employees may begin theshift with smaller quantities of water if they identify the locationand have effective means for replenishment during the shift toallow employees to drink on quart or more per hour. Thefrequent drinking of water shall be encouraged.·Shade shall be present when temperature exceeds 80 degreesFahrenheit. When the outdoor temperature in the work exceeds80 degrees Fahrenheit, employees shall have and maintain oneor more areas with shade at all times.·New employees must be acclimatized. New employees will bemonitored by their Crew Leader (site supervisor) for the first two(2) weeks of employment or longer when necessary.·Employees will be allowed and encouraged to implementscheduled breaks during each shift. Employees must takecool-down breaks in the shade any time they feel the need to doso to protect them from overheating. Supervisors areREQUIRED to allow employees any break period they needduring high heat conditions.·Cool Vests are encouraged for all employees at all times duringperiods of high heat.·Identify the location of the closet Occupational/Industrial Clinicor Hospital in case a crew member becomes ill.What is the specific plan to provide and replenish sufficient water forall employees on site?·If offsite replenish is necessary, where will you go to replenishwater (location/address):·Who will replenish the drinking water (name):Restroom facilities·Employees shall have access to restroom facilities withhand-washing stations. Use of onsite restroom is at the client'sdiscretion (location is annotated below). If client does not givepermission, location of suitable restroom facilities withhand-washing stations offsite will be provided. The onsitesupervisor will identify location and make arrangements toensure all employees have access at any point.·Restroom facilities will be (circle one): Onsite - Offsite·If Offsite, add location name and address:Incident Reporting Procedure·Contact your Site SupervisorName:Phone:·Contact your ManagerName:Phone:·Contact your Site SupervisorName:Phone:With: Your full name, phone number, office location, brief descriptionof what happen and when.NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE(add as many as necessary by using additional sheets)Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:PV-10FREEDOM FOREVER INDY 8.00 TEMPLATE CONTRACTOR LICENSE:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER LLC2619 CONSULATE DR SUITE 800, ORLANDO,FL 32819Tel: (800) 385-1075REVISED BYDATENO.SHEET:REVISIONSJOB NO:F121927DESIGNED BY:ANTONCLIENT:TALOR CECIL5803 SPRUCE DRIVE, FORT PIERCE, FL34982AHJ: ST. LUCIE COUNTYUTILITY: FPL - FLORIDA POWER & LIGHTPHONE: (772) 408-3175SYSTEM:SYSTEM SIZE (DC): 78 X 305 = 23.790 kWSYSTEM SIZE (AC): 16.400 kW @ 240VMODULES: 78 X REC SOLAR: REC305TP2MOPTIMIZERS: 78 X SOLAREDGE P401INVERTER 1: SOLAREDGE SE11400H-USRGM[SI1]INVERTER 2: SOLAREDGE SE5000H-USRGM[SI1]DATE:2/22/2022---------SAFETY PLANGREG ALBRIGHT REC TwinPeak 2 Mono Series solar panels feature an innovative design with high panel efficiency and power output, enabling customers to get the most out of the space used for the installation.Combined with industry-leading product quality and the reliability of a strong and established European brand, REC TwinPeak 2 Mono panels are ideal for residential and commercial rooftops worldwide.PREMIUM SOLAR PANELSWITH SUPERIOR PERFORMANCErec TwinPeak 2 Mono SeriesMORE POWER OUTPUT PER M²IMPROVED PERFORMANCE IN SHADED CONDITIONS100% PID FREEREDUCES BALANCE OF SYSTEM COSTSPIDFree100%ELIGIBLE FORGRGRGRGR28 [1.1]1675±2.5 [65.94 ±0.1]910 [35.8]382.5 [15.05]956 [37.64]997±2.5 [39.25 ±0.1]17 [0.7]45 [1.5] 1000 [39]1200 [47]11±0.2[0.43 ±0.8]6.6±0.2 [0.26 ±0.08]20.5±0.5[0.78 ±0.08]45 [1.5] 38 [1.5]Ref: PM-DS-07-16 Rev- F 06.202019 TOP PERFORMERPV MODULERELIABILITY SCORECARD2020 TOP PERFORMERPV MODULERELIABILITY SCORECARDSpecifications subject to change without notice.www.recgroup.comREC Group is an international pioneering solar energy company dedicated to empowering consumers with clean, affordable solar power in order to facilitate global energy transitions. Committed to quality and innovation, REC offers photovoltaic modules with leading high quality, backed by an exceptional low warranty claims rate of less than 100ppm. Founded in Norway in 1996, REC employs 2,000 people and has an annual solar panel capacity of 1.8 GW. With over 10 GW installed worldwide, REC is empowering more than 16 million people with clean solar energy. REC Group is a Bluestar Elkem company with headquarters in Norway, operational headquarters in Singapore, and regional bases in North America, Europe, and Asia-Pacific.REC TWINPEAK 2 MONO SERIESTEMPERATURE RATINGS Note! Specifications subject to change without notice.MAXIMUM RATINGSCERTIFICATIONSMECHANICAL DATAWARRANTYDimensions: 65.9 x 39.25 x 1.5 (1675 x 997 x 38 mm)Area: 17.98 ft² (1.67 m²)Weight: 40.8 lbs (18.5 kg)Nominal Module Operating Temperature: 44.6°C (±2°C)Temperature coefficient of PMAX: -0.37 %/°CTemperature coefficient of VOC: -0.28 %/°CTemperature coefficient of ISC: 0.04 %/°C19.8%2520EFFICIENCYYEAR PRODUCT WARRANTYYEAR LINEAR POWER OUTPUT WARRANTYUL 1703, Fire classification: Type 2; IEC 61215, IEC 61730; IEC 62804 (PID), IEC 62716 (Ammonia Resistance), IEC 61701 (Salt Mist Level 6), ISO 9001: 2015, ISO 14001: 2004, OHSAS 18001: 2007Operational temperature: -40 ... +185°F (-40 ... +85°C)Maximum system voltage: 1000 VDesign load (+): snow 3600 Pa (75.2 lbs/ft²)+ Maximum test load (+): 5400 Pa (112.8 lbs/ft²)*Design load (-): wind 1600 Pa (33.4 lbs/ft²)+ Maximum test load (-): 2400 Pa (50 lbs/ft²)*Max series fuse rating: 20 AMax reverse current: 20 A+ Calculated using a safety factor of 1.5 * See installation manual for mounting instructionsMeasurements in mm [in]GENERAL DATACells: 120 half-cut mono-Si p-type PERC cells 6 strings of 20 cells in seriesGlass: 0.13" (3.2 mm) solar glass with anti-reflective surface treatmentBack sheet: Highly resistant polyester polyolefin constructionFrame: Anodized aluminumJunction box: 3-part with 3 bypass diodes, IP67 rated 12 AWG (4 mm²) PV wire, 39" + 47" (1.0 m + 1.2 m)Connectors: Stäubli MC4 PV-KBT4/PV-KST4, 12 AWG (4 mm²)ELECTRICAL DATA @ STCProduct code*: RECxxxTP2MNominal Power - PMAX (Wp) 300 305 310 315 320 325 330Watt Class Sorting - (W) -0/+5 -0/+5 -0/+5 -0/+5 -0/+5 -0/+5 -0/+5Nominal Power Voltage - VMPP (V) 33.0 33.3 33.5 33.7 33.9 34.0 34.3Nominal Power Current - IMPP (A) 9.11 9.17 9.26 9.36 9.45 9.56 9.62Open Circuit Voltage - VOC (V) 38.3 38.8 39.1 39.6 40.0 40.3 40.8Short Circuit Current - ISC (A) 10.01 10.04 10.07 10.10 10.13 10.15 10.19Panel Efficiency (%) 18.0 18.3 18.6 18.9 19.2 19.5 19.8Values at standard test conditions (STC: air mass AM 1.5, irradiance 1000 W/m², temperature 25°C), based on a production spread with a tolerance of PMAX, VOC & ISC ±3% within one watt class. At a low irradiance of 200 W/m² at least 95% of the STC module efficiency will be achieved. *Where xxx indicates the nominal power class (PMAX) at STC indicated above.ELECTRICAL DATA @ NMOTProduct code*: RECxxxTP2MNominal Power - PMAX (Wp) 224 227 231 235 239 242 246Nominal Power Voltage - VMPP (V) 30.7 31.0 31.2 31.4 31.6 31.7 31.9Nominal Power Current - IMPP (A) 7.29 7.34 7.41 7.49 7.56 7.65 7.70Open Circuit Voltage - VOC (V) 35.6 36.1 36.4 36.8 37.2 37.5 38.0Short Circuit Current - ISC (A) 8.01 8.03 8.06 8.08 8.10 8.12 8.15Nominal module operating temperature (NMOT: air mass AM 1.5, irradiance 800 W/m², temperature 20°C, windspeed 1 m/s). *Where xxx indicates the nominal power class (PMAX) at STC indicated above.StandardREC ProTrustInstalled by an REC Certified Solar ProfessionalNoYesYesSystem Size Any≤25 kW25-500 kWProduct Warranty (yrs)2025 25Power Warranty (yrs)2525 25Labor Warranty (yrs)025 10Power in Year 197.5% 97.5% 97.5%Annual Degradation0.7% 0.7% 0.7%Power in Year 2580.7% 80.7% 80.7%See warranty documents for details. Some conditions apply. Power OptimizerFor North AmericaP320 / P340 / P370 / P400 / P401 / P405 / P485 / P50525YEARWARRANTYPV power optimization at the module-levelSpecifically designed to work with SolarEdgeinvertersUp to 25% more energySuperior efficiency (99.5%)Mitigates all types of module mismatch losses,from manufacturing tolerance to partialshadingFlexible system design for maximum spaceutilizationFast installation with a single boltNext generation maintenance with module-level monitoringMeets NEC requirements for arc faultprotection (AFCI) and Photovoltaic RapidShutdown System (PVRSS)Module-level voltage shutdown for installerand firefighter safetysolaredge.comPOWER OPTIMIZERPower OptimizerFor North AmericaP320 / P340 / P370 / P400 / P401 / P405 / P485 / P505Optimizer model(typical modulecompatibility)P320(for 60-cellmodules)P340(for high- power60-cellmodules)P370(for higher- power60 and 72- cellmodules)P400(for 72 &96-cellmodules) P401(for highpower 60and 72 cellmodules)P405(for high- voltagemodules)P485(for high- voltagemodules)P505(for highercurrentmodules)INPUTRated Input DC Power(1)320 350 370 400 485 505 WAbsolute Maximum Input Voltage(Voc at lowest temperature)48 60 80 60125(2)83(2)VdcMPPT Operating Range 8 - 48 8 - 60 8 - 80 8-60 12.5 - 105 12.5 - 83 VdcMaximum Short Circuit Current(Isc)11 11.02 11 10.1 11.75 11 14 AdcMaximum DC Input Current 13.75 12.5 14.65 12.5 17.5 AdcMaximum Efficiency99.5 %Weighted Efficiency 98.8 98.6 %Overvoltage CategoryIIOUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER)Maximum Output Current15 AdcMaximum Output Voltage 60 85 VdcOUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF)Safety Output Voltage per PowerOptimizer1 ± 0.1 VdcSTANDARD COMPLIANCEEMCFCC Part15 Class B, IEC61000-6-2, IEC61000-6-3SafetyIEC62109-1 (class II safety), UL1741MaterialUL94 V-0, UV ResistantRoHSYesINSTALLATION SPECIFICATIONSMaximum Allowed SystemVoltage1000 VdcCompatible inverters All SolarEdge Single Phase and Three Phase invertersDimensions (W x L x H) 129 x 153 x 27.5 / 5.1 x 6 x 1.1 129 x 153 x 33.5/ 5.1 x 6 x 1.3129 x 153 x 29.5/ 5.1 x 6 x 1.16129 x 159 x 49.5 / 5.1 x 6.3 x 1.9 129 x 162 x 59/ 5.1 x 6.4 x 2.3mm/inWeight (including cables) 630 / 1.4 750 / 1.7 655 / 1.5 845 / 1.9 1064 / 2.3 gr / lbInput ConnectorMC4(3)Single or dualMC4(3)(4)MC4(3)Input Wire Length 0.16 / 0.520.16 or 0.9/0.52 or 2.95(5)0.16 / 0.52 m / ftOutput Wire Type / Connector Double Insulated / MC4Output Wire Length 0.9 / 2.95 1.2 / 3.9 m / ftOperating Temperature Range(6)-40 to +85 / -40 to +185Ü&/Ü)Protection RatingIP68 /7\SH 3Relative Humidity0-100 %Rated power of the module at STC will not exceed the optimizer “Rated Input DC Power”. Modules with up to +5% power tolerance are allowed NEC 2017 requires max input voltage be not more than 80V For other connector types please contact SolarEdge For dual version for parallel connection of two modules use P485-4NMDMRM. Inthe case of an odd number of PV modules in one string, installing one P485 dual version power optimizer connected to one PV module. When connecting a single module seal the unused input connectors with the supplied pair of sealsLonger inputs wire length are available for use. For 0.9m input wire length order P401-xxxLxxxFor ambient temperature above +85°C / +185°F power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for moredetailsPV System Design Using aSolarEdge Inverter(7)(8)Single PhaseHD-WaveSingle phaseThree Phase for208V gridThree Phase for277/480V gridMinimum String Length(Power Optimizers) P320, P340, P370,P400, P4018 10 18P405, P485, P505 6 8 14Maximum String Length (Power Optimizers) 25 2550(9)Maximum Power per String5700 (6000 withSE7600-US - SE11400- US)52506000(10)12750(11)W Parallel Strings of'LHUHQWLengths or Orientations Yes)RUGHWDLOHGVWULQJVL]LQJLQIRUPDWLRQUHIHUWRKWWSZZZVRODUHGJHFRPVLWHVGHIDXOWILOHVVWULQJBVL]LQJBQDSGI,WLVQRWDOORZHGWRPL[333ZLWK33333LQRQHVWULQJ$VWULQJZLWKPRUHWKDQRSWLPL]HUVGRHVQRWPHHW1(&UDSLGVKXWGRZQUHTXLUHPHQWVVDIHW\YROWDJHZLOOEHDERYHWKH9UHTXLUHPHQW)RU9JULGLWLVDOORZHGWRLQVWDOOXSWR:SHUVWULQJZKHQWKHPD[LPXPSRZHUGLHUHQFHEHWZHHQHDFKVWULQJLV:)RU9JULGLWLVDOORZHGWRLQVWDOOXSWR:SHUVWULQJZKHQWKHPD[LPXPSRZHUGLHUHQFHEHWZHHQHDFKVWULQJLV:© SolarEdge Technologies Ltd. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All other trademarks mentioned herein are trademarks of their respective owners. Date:/2021 DS-000044-1.-NA. Subject to change without notice. 40 INVERTERS solaredge.comOptimized installation with HD-Wave technology6SHFLÀFDOO\GHVLJQHGWRZRUNZLWKSRZHURSWLPL]HUV%XLOWLQPRGXOHOHYHOPRQLWRULQJ2XWGRRUDQGLQGRRULQVWDOODWLRQ2SWLRQDO5HYHQXHJUDGHGDWD$16,&&ODVVDFFXUDF\5HFRUGEUHDNLQJHFLHQF\)L[HGYROWDJHLQYHUWHUIRUORQJHUVWULQJV,QWHJUDWHGDUFIDXOWSURWHFWLRQDQGUDSLGVKXWGRZQIRU1(&DQGSHUDUWLFOHDQG([WUHPHO\VPDOO8/6$FHUWLÀHGIRU&38&5XOHJULGFRPSOLDQFHSingle Phase Inverter with HD-Wave Technologyfor North America6(+866(+866(+866(+866(+866(+866(+8612-25YEARWARRANTYSE3000H-US SE3800H-US SE5000H-US SE6000H-US SE7600H-US SE10000H-US SE11400H-USOUTPUT Rated AC Power Output 30003800 @ 240V3300 @ 208V50006000 @ 240V5000 @ 208V7600 1000011400 @ 240V10000 @ 208VVAMaximum AC Power Output 30003800 @ 240V3300 @ 208V50006000 @ 240V5000 @ 208V7600 1000011400 @ 240V10000 @ 208VVAAC Output Voltage Min.-Nom.-Max. (211 - 240 - 264)9999999VacAC Output Voltage Min.-Nom.-Max. (183 - 208 - 229)-9-9--9VacAC Frequency (Nominal)59.3 - 60 - 60.5(1)HzMaximum Continuous Output Current @240V12.5 16 21 25 32 42 47.5 AMaximum Continuous Output Current @208V-16-24- -48.5AGFDI Threshold1AUtility Monitoring, Islanding Protection, &RXQWU\&RQÀJXUDEOH7KUHVKROGVYesINPUT Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 WMaximum DC Power @208V - 5100 - 7750 - - 15500 WTransformer-less, Ungrounded YesMaximum Input Voltage480 VdcNominal DC Input Voltage 380 400 VdcMaximum Input Current @240V(2)8.5 10.5 13.5 16.5 20 27 30.5 AdcMaximum Input Current @208V(2)-9-13.5--27AdcMax. Input Short Circuit Current45 AdcReverse-Polarity ProtectionYesGround-Fault Isolation Detection 600k Sensitivity0D[LPXP,QYHUWHU(FLHQF\99 99.2 %&(&:HLJKWHG(FLHQF\9999 @ 240V98.5 @ 208V%Nighttime Power Consumption< 2.5 WADDITIONAL FEATURESSupported Communication Interfaces RS485, Ethernet, ZigBee (optional), Cellular (optional)Revenue Grade Data, ANSI C12.20 Optional(3)Rapid Shutdown - NEC 2014 and 2017 690.12Automatic Rapid Shutdown upon AC Grid DisconnectSTANDARD COMPLIANCE Safety UL1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07Grid Connection Standards IEEE1547, Rule 21, Rule 14 (HI)EmissionsFCC Part 15 Class BINSTALLATION SPECIFICATIONS AC Output Conduit Size / AWG Range 1" Maximum / 14-6 AWG 1" Maximum /14-4 AWGDC Input Conduit Size / # of Strings / AWG Range0D[LPXPᐎULQJV$:* 0D[LPXPᐎULQJV$:*Dimensions with Safety Switch (HxWxD)17.7 x 14.6 x 6.8 / 450 x 370 x 174 21.3 x 14.6 x 7.3 / 540 x 370 x 185in / mmWeight with Safety Switch 22 / 10 25.1 / 11.4 26.2 / 11.9 38.8 / 17.6OENJNoise < 25 <50 dBACoolingNatural ConvectionOperating Temperature Range -13 to +140 / -25 to +60(4)Ü)Ü&RSWLRQ(5)Ü)Ü&Protection Rating NEMA 4X (Inverter with Safety Switch)(1) For other regional settings please contact SolarEdge support (2)$KLJKHUFXUUHQWVRXUFHPD\EHXVHGWKHLQYHUWHUZLOOOLPLWLWVLQSXWFXUUHQWWRWKHYDOXHVᐎDWHG (3) Revenue grade inverter P/N: SExxxxH-US000NNC2(4) For power de-rating information refer to: KWWSVZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVVHWHPSHUDWXUHGHUDWLQJQRWHQDSGI(5) -40 version P/N: SExxxxH-US000NNU4 SE3000H-USSE3800H-USSE5000H-USSE6000H-USSE7600H-USSE10000H-USSE11400H-USOUTPUTRated AC Power Output30003800 @ 240V3300 @ 208V50006000 @ 240V5000 @ 208V76001000011400 @ 240V10000 @ 208VVAMaximum AC Power Output 30003800 @ 240V3300 @ 208V50006000 @ 240V5000 @ 208V76001000011400 @ 240V10000 @ 208VVAAC Output Voltage Min.-Nom.-Max.(211 - 240 - 264)9999999VacAC Output Voltage Min.-Nom.-Max.(183 - 208 - 229)-9-9--9VacAC Frequency (Nominal)59.3 - 60 - 60.5(1)HzMaximum Continuous Output Current @240V12.5162125324247.5AMaximum Continuous Output Current @208V-16-24--48.5AGFDI Threshold1AUtility Monitoring, Islanding Protection,&RXQWU\&RQÀJXUDEOH7KUHVKROGVYesINPUTMaximum DC Power @240V4650590077509300118001550017650WMaximum DC Power @208V-5100-7750--15500WTransformer-less, Ungrounded YesMaximum Input Voltage480VdcNominal DC Input Voltage380400VdcMaximum Input Current @240V(2)8.510.513.516.5202730.5AdcMaximum Input Current @208V(2)-9-13.5--27AdcMax. Input Short Circuit Current45AdcReverse-Polarity ProtectionYesGround-Fault Isolation Detection600k Sensitivity0D[LPXP,QYHUWHU(FLHQF\9999.2%&(&:HLJKWHG(FLHQF\9999 @ 240V98.5 @ 208V%Nighttime Power Consumption< 2.5WADDITIONAL FEATURESSupported Communication InterfacesRS485, Ethernet, ZigBee (optional), Cellular (optional)Revenue Grade Data, ANSI C12.20Optional(3)Rapid Shutdown - NEC 2014 and2017 690.12Automatic Rapid Shutdown upon AC Grid DisconnectSTANDARD COMPLIANCESafetyUL1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to T.I.L. M-07Grid Connection StandardsIEEE1547, Rule 21, Rule 14 (HI)EmissionsFCC Part 15 Class BINSTALLATION SPECIFICATIONS AC Output Conduit Size / AWG Range1" Maximum / 14-6 AWG1" Maximum /14-4 AWGDC Input Conduit Size / # of Strings / AWG Range0D[LPXPᐎULQJV$:*0D[LPXPᐎULQJV$:*Dimensions with Safety Switch (HxWxD)17.7 x 14.6 x 6.8 / 450 x 370 x 17421.3 x 14.6 x 7.3 / 540 x 370 x 185in / mmWeight with Safety Switch22 / 1025.1 / 11.426.2 / 11.938.8 / 17.6OENJNoise < 25<50dBACoolingNatural ConvectionOperating Temperature Range -13 to +140 / -25 to +60(4)Ü)Ü&RSWLRQ(5)Ü)Ü&Protection Rating NEMA 4X (Inverter with Safety Switch)(1) For other regional settings please contact SolarEdge support(2)$KLJKHUFXUUHQWVRXUFHPD\EHXVHGWKHLQYHUWHUZLOOOLPLWLWVLQSXWFXUUHQWWRWKHYDOXHVᐎDWHG(3) Revenue grade inverter P/N: SExxxxH-US000NNC2(4) For power de-rating information refer to:KWWSVZZZVRODUHGJHFRPVLWHVGHIDXOWÀOHVVHWHPSHUDWXUHGHUDWLQJQRWHQDSGI(5) -40 version P/N: SExxxxH-US000NNU4Single Phase Inverterwith HD-Wave Technology for North America6(+866(+866(+866(+866(+866(+866(+866RODU(GJH7HFKQRORJLHV,QF$OOULJKWVUHVHUYHG62/$5('*(WKH6RODU(GJHORJR237,0,=('%<62/$5('*(DUHWUDGHPDUNVRUUHJLVWHUHGWUDGHPDUNVRI6RODU(GJH7HFKQRORJLHV,QF$OORWKHUWUDGHPDUNVPHQWLRQHGKHUHLQDUHWUDGHPDUNVRIWKHLUUHVSHFWLYHRZQHUV'DWH9(1*1$06XEMHFWWRFKDQJHZLWKRXWQRWLFH pe.eaton.com Eaton general duty cartridgefuse safety switchDG223NRBUPC:782113144252Dimensions:Height:19.25 IN●Length:7.38 IN●Width:9.13 IN●Weight:14 LBNotes:Maximum hp ratings apply only when dualelement fuses are used. 3-Phase hp rating shown isa grounded B phase rating, UL listed.Warranties: Eaton Selling Policy 25-000, one (1) year fromthe date of installation of the Product oreighteen (18) months from the date of shipmentof the Product, whichever occurs first.●Specifications:Type:General duty, cartridge fused●Amperage Rating:100A●Enclosure:NEMA 3R●Enclosure Material:Painted galvanized steel●Fuse Class Provision:Class H fuses●Fuse Configuration:Fusible with neutral●Number Of Poles:Two-pole●Number Of Wires:Three-wire●Product Category:General duty safety switch●Voltage Rating:240V●Supporting documents:Eatons Volume 2-Commercial Distribution●Eaton Specification Sheet - DG223NRB●Certifications: UL Listed●Product compliance:No Data______________________________________________________________________© 2016 Eaton. All rights reserved. The right way to attach almost anything to metal roofs! SolarFoot Features:Manufactured in the U.S.A. from certified raw materialFabricated in our own ISO 9001:2015 certified factoryAll aluminum and stainless components 25yr limited warrantyCompatible with all commercial L-Foot products on the marketFactory applied 40-year isobutylene/isoprene crosslink polymer sealant for reliable weathertightness Sealant reservoir to prevent over-compression of sealantLoad-to-failure tested Normal to Seam by a nationally accredited laboratory on numerous metal roof materials and substratesFour points of attachment into structure or deck with tested holding strength for engineered applicationsIntegrated M8-1.25x17mm stud and M8-1.25 stainless steel hex flange nut included888-825-3432 | www.S-5.com | Introducing the new SolarFoot™ for exposed fastener metal roofing with the strength, testing, quality, and time-proven integrity you expect from S-5!. The SolarFoot provides an ideal mounting platform to attach the L-Foot (not included) of a rail-mounted PV system to the roof. This solution is The Right Way to secure rail-mounted solar systems to exposed fastener metal such as AG-Panel or R-Panel. NEW PRODUCTSolarFoot™SolarFootTM0RXQWLQJIRU([SRVHG)DVWHQHU5RR¿QJFastener SelectionTo source fasteners for your projects, contact S-5!When other brands claim to be “just as good as S-5!”, tell them to PROVE IT.The SolarFoot is a simple, cost-effective pedestal for L-Foot (not included) attachment of rail-mounted solar PV. The unique design is compatible with all rail producer L-Foot components. The new SolarFoot assembly ensures a durable weathertight solution for the life of the roof. Special factory applied butyl co-polymeric sealant contained in a reservoir is The Right Way, allowing a water-tested seal. Stainless integrated stud and hex flange lock-nut secure the L-Foot into position. A low center of gravity reduces the moment arm commonly associated with L-Foot attachments. Direct attachment of the SolarFoot to the structural member or deck provides unparalleled holding strength.*Fasteners sold separately. Fastener type varies with substrate. Contact S-5! on how to purchase fasteners and obtain our test results. L-Foot also sold separately.Distributed by:SolarFoot Advantages:Exposed fastener mounting platform for solar arrays attached via L-Foot and RailsWeatherproof attachment to exposed fastener roofingButyl sealant reservoir provides long-term waterproof sealM8-1.25x17mm stud with M8 hex flange nut for attachment of all popular L-Foot/rail combinationsTool: 13 mm Hex Socket or ½” Hex SocketTool Required: Electric screw gun with hex drive socket for self-tapping screws. Low Center of Gravity reduces moment arm commonly associated with L-Foot/Rail solar mounting scenariosAttaches directly to structure or deck for optimal holding strengthS-5! Recommended substrate-specific (e.g. steel purlin, wood 2x4, OSB, etc.) fasteners provide excellent waterproofing and pull- out strength Fastener through-hole locations comply with NDS (National Design Specification)for Wood ConstructionS-5!® Warning! Please use this product responsibly!The independent lab test data found at www.S-5.com can be used for load-critical designs and applications. Products are protected by multiple U.S. and foreign patents. For published data regarding holding strength, fastener torque, patents, and trademarks, visit the S-5! website at www.S-5.com. Copyright 2017, Metal Roof Innovations, Ltd. S-5! products are patent protected. Copyright 2017, Metal Roof Innovations, Ltd. Version 102017LQLQLQLQLQLQLQLQ[PPLQLQPPLQLQLQLQ)DFWRU\$SSOLHG%XW\O6HDODQW06WDLQOHVV6WHHO7KUHDGHG6WXGMetal to Metal: 1/4-14 Self Drilling Screw 1-1/2" to 2-1/2"Metal to Wood: 1/4-14 Type 17 AB Milled Point 1-1/2" to 2-1/2" Technical Data Guide Polyether Technology CSI Section No. 07 12 13CHEM LINK Products, LLC Product DescriptionE-Curb penetration seals replace old-style metal pitch pans with versatile, precast components and pourable sealants. CHEM LINK’s E-Curb System can usually be installed in under 15 minutes and QHYHUUHTXLUHVÀDVKLQJRUPHFKDQLFDODWWDFKPHQWSpecial Characteristics5DSLGLQVWDOODWLRQ³6OLS¿W´OLJKWZHLJKWFXUEGHVLJQUHGXFHVODERUVLJQL¿FDQWO\([FHOOHQWDGKHVLRQWRPRVWURR¿QJPDWHULDOV1RÀDVKLQJRUPHFKDQLFDODWWDFKPHQWUHTXLUHG6HUYLFH7HPSHUDWXUH)WR)&WR&1-Part®DFFRPPRGDWHVPRYHPHQWDQGLVVXJJHVWHGIRUXVHRQDOOJUDQXODWHGPHPEUDQHVDQGGHWDLOV with excessive movement.)RUVORSHGURRIDSSOLFDWLRQVVXEVWLWXWHDuraLink™ non-slump adhesive/sealant for 1-Part and M-1®/DVW5HYLVLRQE-CURBTM SYSTEM3(1(75$7,216($/6E-CurbsDUHGHVLJQHGIRUXVHRQJUDQXODWHGPRGL¿HGELWXPHQDVSKDOWDQGFRDOWDU%85EXLOWXSURR¿QJE-CurbsDUHVSHFL¿HGIRU39&(3'03,%DQG732VLQJOHSO\URR¿QJPHPEUDQHVE-CurbsDUHKLJKO\YHUVDWLOHIRUVHDOLQJSHQHWUDWLRQVDURXQGVRODUSDQHOPRXQWV+9$&(OHFWULFDODQGDQ\W\SHRIVWUXFWXUDOVXSSRUWV7323ULPHULVUHTXLUHGIRUXVHZLWK732VLQJOHSO\URRIPHPEUDQHWhen installed properly, this system forms a durable, ZDWHUSURRI UXEEHU VHDO DURXQG SHQHWUDWLRQV $QH[WHQGHG PDQXIDFWXUH ZDUUDQW\ DJDLQVW OHDNV LVactivated with submittal of a completed warranty card.Restrictions'RQRWDSSO\EHORZ)&'RQRWLQVWDOOLIUDLQLVDQWLFLSDWHGZLWKLQKRXUV'RQRWXVHRQ+\SDORQRUVPRRWK$33PRGL¿HGELWXPHQPHPEUDQH)RUVPRRWK$33WRUFKGRZQDWDUJHWRIJUDQXODWHG$33EHIRUHLQVWDOODWLRQ7323ULPHUPXVWEHXVHGIRU732DSSOLFDWLRQV'RQRWSULPHERQGLQJVXUIDFHVZLWKDVSKDOWSULPHU'RQRWXVHDVSKDOWFHPHQWDVD³QLJKWVHDODQW´ Use M-1 for this purpose.E-CurbNLWVDUHGHVLJQHGWRFRQWDLQHQRXJK3DUWWR¿OOHDFKFXUEZLWKGLVSODFHPHQWLQFRQVLGHUDWLRQ5HIHUWRRXUSHQHWUDWLRQFDOFXODWRUXQGHUFRQWUDFWRU resources at chemlink.com to verify volumes.E-Curb System ComponentsE-CurbH[WHULRUULQJVVWUDLJKWVDQGFRUQHUVM-16WUXFWXUDO$GKHVLYH6HDODQWXVHGIRUERQGLQJ the E-CurbFRPSRQHQWVVHDOLQJDQGSULPLQJWKH penetration.1-Part³PRLVWXUHFXUH´SRXUDEOHVHDOHUXVHGWRIRUPDGXUDEOHZDWHUWLJKWVHDODURXQGWKHURRI penetration.E-Curb precast form components are composed of OLJKWZHLJKWQ\ORQUHVLQ7KH(&XUELVLQFKHVKLJKand is available in a variety of shapes and sizes.Sizes available include: bi-sected circular pieces KDYLQJLQVLGHGLDPHWHUVRIRULQFKHV&RUQHUSLHFHV KDYLQJ D LQFK UDGLXV DQG LQFK VWUDLJKWSLHFHVDUHDOVRDYDLODEOHWRFUHDWHODUJHUVL]HV7KHRXWHU VXUIDFH LV LPSHUYLRXV WR LFH FRUURVLRQ 89XOWUDYLROHWOLJKWDQGSRQGLQJZDWHUM-16WUXFWXUDO$GKHVLYH6HDODQWLVDGXUDEOHVHOI¿[WXULQJPRLVWXUHFXUHPDVWLF&DUWULGJHVRIM-1 are supplied in each E-Curb Kit. Components are also sold separately.1-PartLVDKLJKO\ÀH[LEOHVHOIOHYHOLQJPRLVWXUHFXUHSRXUDEOH VHDOHU WKDW HOLPLQDWHV PL[LQJ ,W LV DOVRVROLGUXEEHUKDVDYHU\ORZ92&FRQWHQWZLOOnot melt or shrink, and is resistant to deterioration. ,WLVVXSSOLHGLQR]DQGR]FDUWULGJHVRUJDOORQSRXFKHV8QXVHGVHDODQWFDQEHFDSSHGDQGreused.'RFXPHQW1R/Distributed by: BEST MATERIALS ®Ph: 800-474-7570, 602-272-8128Fax: 602-272-8014 www.BestMaterials.comEmail: Sales@BestMaterials.comStep 15HPRYHDOOSUHYLRXVO\DSSOLHGFDXONPDVWLFFHPHQWasphalt, and other contaminants from penetrations with a wire brush. Clean all smooth substrates with LVRSURS\ORUGHQDWXUHGDOFRKRO%UXVKDZD\DOOJUDYHORUORRVHJUDQXOHV6HDOWKHEDVHRIHDFKSHQHWUDWLRQwith M-1. Coat penetrations with M-1WR´DERYHWKHroof line.Step 2Hold a section of E-Curb ÀDW VLGH XS DQG DSSO\D ´ EHDG RIM-1 to the entire bottom perimeter. $SSO\DGGLWLRQDO´EHDGRIM-1 down the center RIWKHVHFWLRQ'RQRWWRROWKHEHDGVÀDW3ODFHWKHE-Curb section on the roof surface to form a half circle DURXQGWKHSHQHWUDWLRQV3UHVVGRZQ¿UPO\XQWLOM-1 H[WUXGHVIURPWKHRXWVLGHHGJHVStep 3$SSO\M-1 to the second section of E-Curb as described above. Place the second section of curb on the roof VXUIDFHWRIRUPDFLUFOHZLWKWKH¿UVWVHFWLRQ3UHVV¿UPO\LQSODFHXQWLOH[FHVVDGKHVLYHH[WUXGHVIURPWKHRXWVLGHHGJHV$SSO\DEHDGRIM-1 around the outside base of the installed E-Curb, and tool to form a smooth ¿OOHW)RUQRQE-Curb penetrations seals, add M-1 to scarf joint surfaces and tool smooth.Step 4Cut tip off 1-PartFDUWULGJHDWZLGHVWSRLQWRQSODVWLFQR]]OHDQGSLHUFHWKHIRLOVHDO,QVHUWLQWRFDXONLQJJXQand pump E-CurbIXOO:KHQXVLQJD1-Part pouch, remove cap, pour, squeeze out excess air, and reseal.Note: To provide an adequate rubber seal, maintain a ´GLVWDQFHEHWZHHQSHQHWUDWLRQVDQGLQVLGHHGJHRIthe E-Curb.$OOSURSHUWLHVGHVFULEHGLQWKLVGRFXPHQWDUHGHULYHGIURPWHVWLQJFRQGXFWHGLQODERUDWRU\FRQGLWLRQV3URSHUWLHVDQGSHUIRUPDQFHZLOOYDU\GHSHQGLQJRQHQYLURQPHQWDOFRQGLWLRQVDQGDSSOLFDWLRQWHFKQLTXH7HVWDQGHYDOXDWHWRGHWHUPLQHDSSURSULDWHXVDJH9LVLWZZZFKHPOLQNFRPIRUWKH0DWHULDO6DIHW\'DWD6KHHW7HFKQLFDO'DWD*XLGHVDQGIXOOZDUUDQW\IRUWKLVSURGXFW/,0,7(':$55$17<CHEM LINK Products, LLC warrants this product’s performance, provided it is properly stored and DSSOLHGZLWKLQ\HDU,IQRWVDWLV¿HGUHWXUQUHPDLQLQJSURGXFWDQGSXUFKDVHUHFHLSWIRUUHIXQGRUUHSODFHPHQWRISURGXFWH[FOXVLYHof labor or cost of labor. This is the sole and exclusive remedy for defects or failure of this product. User must read and follow the GLUHFWLRQRIWKHFXUUHQW7HFKQLFDO'DWD*XLGHDQG06'6SULRUWRSURGXFWXVH8VHUGHWHUPLQHVVXLWDELOLW\RISURGXFWIRULQWHQGHGXVHDQGDVVXPHVDOOULVNV0DQXIDFWXUHUVKDOOQRWEHOLDEOHIRUGDPDJHVLQFOXGLQJFRQVHTXHQWLDORULQFLGHQWDOGDPDJHVLQH[FHVVRIWKHSXUFKDVHSULFHH[FHSWZKHUHVXFKH[FOXVLRQRUOLPLWDWLRQLVSURKLELWHGE\VWDWHODZ7+,6:$55$17<,6,1/,(82)$//27+(5:$55$17,(6:5,77(12525$/67$78725<(;35(6625,03/,(',1&/8',1*$1<:$55$17<2)0(5&+$17$%,/,7<25),71(66)25$3$57,&8/$5385326(H[FHSWIRUWKHDERYHH[SUHVVZDUUDQW\JLYHQE\manufacturer, the product is sold with all faults. CHEM LINK PRODUCTS, LLC6+$//127%(5(63216,%/()257+(86(2)7+,6352'8&7,1$0$11(572,1)5,1*(21$1<3$7(1725$1<27+(5,17(//(&78$/3523(57<5,*+76+(/'%<27+(567KLVZDUUDQW\JLYHV\RXVSHFL¿FOHJDOULJKWVDQG\RXPD\DOVRKDYHRWKHUULJKWVLQWKH86ZKLFKYDU\IURPstate to state. For warranty claim information, call 800-826-1681. SOLARMOUNT is the professionals’ choice for residential PV mounting applications. Every aspect of the system is designed for an easier, faster installation experience. SOLARMOUNT is a complete solution with revolutionary universal clamps, FLASHKIT PRO, full system UL 2703 certification and 25-year warranty. Not only is SOLARMOUNT easy to install, but best-in-class aesthetics make it the most attractive on any block!NOW FEATURING FLASHKIT PROThe Complete Roof Attachment SolutionNOW WITH UNIVERSAL MIDCLAMPSAccommodates 30mm-51mm module frames One tool, one-person installs are here!REVOLUTIONARY NEW ENDCLAMPS Concealed design and included End CapsTHE PROFESSIONALS’ CHOICE FOR RESIDENTIAL RACKING BEST INSTALLATION EXPERIENCE • CURB APPEAL • COMPLETE SOLUTION • UNIRAC SUPPORT SOLARMOUNTOPTIONAL FRONT TRIMNew & Improved: THE PROFESSIONALS’ CHOICEWith Superior AestheticsCONCEALED UNIVERSAL CLAMPSW WITH UNIVERSAL MIDCLAMPIWITHTHUUNINEVESRSRSALALALMMIDICLCLAMP25 YEAR FULL-SYSTEM WARRANTYFOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORTENGINEERINGEXCELLENCEUNMATCHEDEXPERIENCEPERMITDOCUMENTATIONDESIGNTOOLSCERTIFIEDQUALITYBANKABLEWARRANTYBETTER DESIGNS TRUST THE INDUSTRY’S BEST DESIGN TOOLStart the design process for every project in our U-Builder on-line design tool. It’s a great way to save time and money.BETTER SYSTEMSONE SYSTEM - MANY APPLICATIONS Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety of modules in Portrait or Landscape. Tilt the system up on flat or low slow roofs. Components available in mill, clear, and dark finishes to optimize your design financials and aesthetics.BETTER RESULTS MAXIMIZE PROFITABILITY ON EVERY JOBTrust Unirac to help you minimize both system and labor costs from the time the job is quoted to the time your teams get off the roof. Faster installs. Less Waste. More Profits. BETTER SUPPORT WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAMProfessional support for professional installers and designers. You have access to our technical support and training groups. Whatever your support needs, we’ve got you covered. Visit Unirac.com/solarmount for more information.UNIVERSAL SELF STANDING MIDCLAMPSU-BUILDER ONLINE DESIGN TOOL SAVES TIME & MONEYVisit design.unirac.comBANKABLE WARRANTYDon’t leave your project to chance, Unirac has the ƛQDQFLDOVWUHQJWKWREDFNRXUSURGXFWVDQGUHGXFH\RXUULVNHave peace of mind knowing you are providing products of exceptional quality. SOLARMOUNT is covered by a 25 year OLPLWHGSURGXFWZDUUDQW\DQGD\HDUOLPLWHGƛQLVKZDUUDQW\TECHNICAL SUPPORTUnirac’s technical support team is dedicated to answering questions & addressing issues in real time. An online library of documents including engineering reports, stamped letters and technical data sheets greatly VLPSOLƛHV\RXUSHUPLWWLQJDQGSURMHFWSODQQLQJSURFHVVCERTIFIED QUALITY PROVIDERUnirac is the only PV mounting vendor with ISO FHUWLƛFDWLRQVIRUDQG2+6$618001:2007, which means we deliver the highest standards IRUƛWIRUPDQGIXQFWLRQ7KHVHFHUWLƛFDWLRQVGHPRQVWUDWHRXUH[FHOOHQFHDQGFRPPLWPHQWWRƛUVWFODVVEXVLQHVVSUDFWLFHVUL2703BONDING & GROUNDINGMECHANICAL LOADINGSYSTEM FIRE CLASSIFICATIONLISTEDSOLARMOUNTCONCEALED UNIVERSAL ENDCLAMPSEND CAPS INCLUDED WITH EVERY ENDCLAMPENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAINFOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702PUB2018AUG31 – PRINTED UPDATE DQD 507 Rev. 2019-04-30 © 2018 CSA Group. All rights reserved. Page 1 Certificate of Compliance Certificate: 70131735 Master Contract: 266909 Project: 80082031 Date Issued: 2021-06-02 Issued To: Unirac 1411 Broadway NE Albuquerque, New Mexico, 87102 United States Attention: Klaus Nicolaedis The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US' for Canada and US or with adjacent indicator 'US' for US only or without either indicator for Canada only. Issued by: Michael Hoffnagle Michael Hoffnagle PRODUCTS CLASS - C531302 - POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems CLASS - C531382 - POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems -Certified to US Standards Models: SM - SOLARMOUNT Flush-to-Roof is an extruded aluminum rail PV racking system that is installed parallel to the roof in landscape or portrait orientations. ULA - Unirac Large Array is a ground mount system using the SolarMount (SM) platform for the bonding and grounding of PV modules. Solarmount Certificate: 70131735 Project: 80082031 Master Contract: 266909 Date Issued: 2021-06-02 DQD 507 Rev. 2019-04-30 © 2018 CSA Group. All rights reserved. Page 2 The system listed is designed to provide bonding/grounding, and mechanical stability for photovoltaic modules. The system is secured to the roof with the L-Foot components through the roofing material to building structure. Modules are secured to the racking system with stainless steel or aluminum mid clamps and Aluminum end clamps. The modules are bonded to the racking system with the stainless-steel bonding mid clamps with piercing points. The system is grounded with 10 AWG copper wire to bonding/grounding lugs. Fire ratings of Class A with Type 1, 2, 3, 10, 19, 22 or 25 for steep slope. Tested at 5” interstitial gap which allows installation at any stand-off height. The grounding of the system is intended to comply with the latest edition of the National Electrical Code, to include NEC 250 & 690. Local codes compliance is required, in addition to national codes. All grounding/bonding connections are to be torqued in accordance with the Installation Manual and the settings used during the certification testing for the current edition of the project report. The system may employ optimizers/micro-inverters and used for grounding when installed per installation instructions. UL 2703 Mechanical Load ratings: Downward Design Load (lb/ft²) 113.5 Upward Design Load (lb/ft²) 50.7 Down-Slope Load (lb/ft²) 16.13 Test Loads: Downward Load (lb/ft²) 170.20 Upward Load (lb/ft²) 76.07 Down-Slope Load (lb/ft²) 24.2 Unirac Large Array ULA is a ground mount system using the SolarMount (SM) platform for the bonding and grounding of PV modules. ULA aluminum components merge with SM rails and installer-supplied steel pipe. The SM rail system is secured to the horizontal Pipe using the Rail Bracket components. The Rear and Front cap secures the horizontal Pipe to the vertical Pipe. The Front cap is also used to secure the Cross brace. A Slider is attached to the vertical Pipe to secure the Cross brace. The SM rails, caps, slider, rail brackets, and cross braces materials are 6105-T5 aluminum extrusion. Fasteners materials are 304 stainless steel. Horizontal and vertical pipe materials meet the minimum requirements of ASTM A53 for galvanized steel pipe in 2” and 3” diameter. The mechanical load ratings from the SM test data will be applied to the ULA model. Fire Testing is not applicable due to being a ground mount system. APPENDIX HTechnicalData SheetsUnitsinplfin²SECTION MODULUS (X-AXIS)in³SECTION MODULUS (Y-AXIS)in³MOMENT OF INERTIA (X-AXIS) in4MOMENT OF INERTIA (Y-AXIS)in4RADIUS OF GYRATION (X-AXIS)inRADIUS OF GYRATION (Y-AXIS)in0.564 0.865 1.170.15 0.363 0.8980.067 0.113 0.2211.271CROSS SECTION AREA0.409 0.625 1.059BEAM HEIGHT1.70 2.57 3.00APPROX WEIGHT0.491 0.7280.254 0.269 0.5020.13 0.467 1.450.026 0.045 0.267PropertiesSOLARMOUNT LightSOLARMOUNT Rail Profile 2SOLARMOUNT HDPAGE H3TÜV Rheinland PTL, LLC, 1107 W. Fairmont Drive, Building A, Tempe, Arizona 85282, Tel (480) 966-1700, Fax (775) 314-6458 January 20, 2021 Unirac 1411 Broadway Blvd. NE Albuquerque, NM 87102 Attn.: Unirac - Engineering Department Re: Engineering Certification for the Unirac U-Builder 2.0 SOLARMOUNT Flush Rail PZSE, Inc. - Structural Engineers has reviewed the Unirac SOLARMOUNT rails, proprietary mounting system constructed from modular parts which is intended for rooftop installation of solar photovoltaic (PV) panels; and has reviewed the U-builder Online tool. This U-Builder software includes analysis for the SOLARMOUNT LIGHT rail, SOLARMOUNT STANDARD rail, and SOLARMOUNT HEAVY DUTY rail with Standard and Pro Series hardware. All information, data and analysis contained within are based on, and comply with the following codes and typical specifications: 1. 2020 Florida Building Code, by Florida Building Commission 2. Minimum Design Loads for Buildings and other Structures, ASCE/SEI 7-16 3. 2018 International Building Code, by International Code Council, Inc. w/ Provisions from SEAOC PV-2 2017. 4. 2018 International Residential Code, by International Code Council, Inc. w/ Provisions from SEAOC PV-2 2017. 5. AC428, Acceptance Criteria for Modular Framing Systems Used to Support Photovoltaic (PV) Panels, November 1, 2012 by ICC-ES. 6. 2015 Aluminum Design Manual, by The Aluminum Association, 2015 Following are typical specifications to meet the above code requirements: Design Criteria: Ground Snow Load = 0 - 100 (psf) Basic Wind Speed = 85 - 190 (mph) Roof Mean Height = 0 - 60 (ft) Roof Pitch = 0 - 45 (degrees) Exposure Category = B, C & D Attachment Spacing: Per U-builder Engineering report. Cantilever: Maximum cantilever length is L/3, where “L” is the span noted in the U-Builder online tool. Clearance: 2” to 10” clear from top of roof to top of PV panel. Tolerance(s): 1.0” tolerance for any specified dimension in this report is allowed for installation. Installation Orientation: See SOLARMOUNT Rail Flush Installation Guide. Landscape - PV Panel long dimension is parallel to ridge/eave line of roof and the PV panel is mounted on the long side. Portrait - PV Panel short dimension is parallel to ridge/eave line of roof and the PV panel is mounted on the short side. 1478 Stone Point Drive, Suite 190, Roseville, CA 95661T 916.961.3960 F 916.961.3965 W www.pzse.comExperience | Integrity | Empowerment Components and Cladding Roof Zones: The Components and Cladding Roof Zones shall be determined based on ASCE 7-16 Component and Cladding design. Notes: 1) U-builder Online tool analysis is only for Unirac SM SOLARMOUNT Rail Flush systems only and do not include roof capacity check. 2) Risk Category II per ASCE 7-16. 3) Topographic factor, kzt is 1.0. 4) Array Edge Factor ƳE = 1.5 5) Average parapet height is 0.0 ft. 6) Wind speeds are LRFD values. 7) Attachment spacing(s) apply to a seismic design category E or less. Design Responsibility: The U-Builder design software is intended to be used under the responsible charge of a registered design professional where required by the authority having jurisdiction. In all cases, this U-builder software should be used under the direction of a design professional with sufficient structural engineering knowledge and experience to be able to: • Evaluate whether the U-Builder Software is applicable to the project, and • Understand and determine the appropriate values for all input parameters of the U-Builder software. This letter certifies that the Unirac SM SOLARMOUNT Rails Flush, when installed according to the U-Builder engineering report and the manufacture specifications, is in compliance with the above codes and loading criteria. This certification excludes evaluation of the following components: 1) The structure to support the loads imposed on the building by the array; including, but not limited to: strength and deflection of structural framing members, fastening and/or strength of roofing materials, and/or the effects of snow accumulation on the structure. 2) The attachment of the SM SOLARMOUNT Rails to the existing structure. 3) The capacity of the solar module frame to resist the loads. This requires additional knowledge of the building and is outside the scope of the certification of this racking system. If you have any questions on the above, do not hesitate to call. Prepared by: PZSE, Inc. – Structural Engineers Roseville, CA 1478 Stone Point Drive, Suite 190, Roseville, CA 95661T 916.961.3960 F 916.961.3965 W www.pzse.comExperience | Integrity | EmpowermentEXP. 02/28/2023ZACHERPAULK.ENSECILARIDAOLFNOISSEFORP LENGINEERSTATE OFNo. 73522THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY PAULK. ZACHER, PE ON 01/20/2021 USING A SHA-1 AUTHENTICATION CODE.PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNEDAND SEALED AND THE SHA-1 AUTHENTICATION CODE MUST BEVERIFIED ON ANY ELECTRONIC COPIES.01/20/2021DIGITAL SIGNATURE