HomeMy WebLinkAbout3424 Trinity Lot 28 blower door and duct blast.pdfJob information
Builder: DR HORTON
Address: 3424 TRINM
City: FORT PIERCE
Duct Leakage Test Results
System 1
System 2
System 3
Sum of any additional
systems
Total of all systems
Duct Leakage Test Report
Prescriptive or Performance Method
rmit #
Community: CREEKSIDE Lot: 28
Unit:
State: FL Zip: 34945
;ciptive Method O Performance Method
cfm25 rescriptive Method cfm25 (total)
To qualify as "substantially leak free" Qn must be less than or equal to 0.04
_cfm25 if air handler unit is installed. If air handler unit is not installed, On Total
must be less than or equal to 0.03. This testing method meets the
cfm25 requirements in accordance with Section R403.2.2
cfm25
48
1768= 0.02 Qn
Total of all systems
Total Conditioned
Square Footage
PASS
FAIL
Testing Company
Q Performance Method cfm25 (put or Total)
To qualify as "substantially leak free" Qn must not be greater than the
proposed duct leakage CIn specified on Form R405-2014
Leakage Type selected Qn specified on Form
on Form R405-2014 R405-2014 (Energy Calc)
(Energy Calc)
Company Name: SUN SEAL LLC Phone: 321-412-0035
I hereby verify that the above duct leakage testing results are in accordance with the Florida Building Code requirements with the selected
;compliance path as stated above, either the Prescriptive Method or Performance Method.
Date of Test: 03101 /2022
Signature of Tester:
Printed Name of Tester: DANIEL MURPHY
License/Certification # 5066440 Issuing Authority BPI
Envelope Leakage Test Report
(Blower Door Test)
R405.4.2.1 Compliance
Permit #
Job Information
Builder: DR HORTON Community: CREEKSIDE Lot: 28
Address: 3424 TRINITY CIRCLE Unit:
City: FORT PIERCE State: FL Zip: 3494
Air Leakage Test Results Passing results must be 7ACH(50) or less
1254 x 60 _ 14381.6 5.2 Method for calculating building vol me:
CFM(50) Building Volume ACH(50)
Q Retrieved from architectural plans
j ---I ode software calculated
PASS FAIL Q Field measured and calculated
When ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department.
Certification of Test Results
R402.4,1.2 Testing. The building or dwelling unit shall iae tested and verified as having an air leakage rate of not exceeding 7 air changes
per hour in Climate Zones 1 and 2, 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a
pressure of 0.2 inches w.g. (50 Pascals). Testing shall be conducted by wither individuals as defined in section 553.993(5) or (7), F.S. or
individuals licensed as set forth in Section 489.105(3)(f), (g), or (I) or an approved third party. A written report of the results of the test
shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of
Testing Company
Company Name; SUN SEAL LLC Phone: 321-412-0035
I hereby verify that the above duct leakage testing results are in accordance with the Florida Building Code requirements with the selected
compliance path as stated above, either the Prescriptive Method or Performance Method.
Date of Test: 03/01/2022
Signature of Tester., (Lwd
Printed Name of Tester: DANIEL MURPHY
License/Certification # 5066440 Issuing Authority BPI