Loading...
HomeMy WebLinkAboutFBC Energy Conservation CodeDate: Contractor: Job Address: J7`r 0.�A0 .Planning & Development Services; Building & Code Regulation Division 2300 Virginia Ave, Rm 201; Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE R402.4.1.2 House Infiltration Test (Blower Door) Certification Prescriptive and Performance Method Permit #: , f `7l/ —63W Construction: (� New Construction House Infiltration Test Results SLC Climate Zone 2 CFM (50) _ / 13.E Volume = 15-995' ACH (50) = CFM (50) x 60 / Volume = `7 2. Passing results must be & ACH (50) or less Test Date: Mechanical Ventilation required less than 3 ACH M Pass ( ) Fail FBC, Energy R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Texting shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to penetrations of the FBC, Residential R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the accordance with Section M1507.3. Testing Company Company Name: Y�/G� Address: lJ`7' �0�/✓t ���, i� 1 �22 I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requirements in accpfdance with Section R402.4.1.2 Climate Zone 2. Signature: Printed Nam License/Certification #: -;,rp 3 1.6-le FILE COPY Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772462-2165 Fax 772462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: j0 Permit #: r 7,/ 03% � Lot #: 7/ Contractor: Address: �7S`-.) Construction: post Construction Test ❑ Rough -in Test Test Conditions: / Jn Date: <o 4 Floor Area (ft2): /Ali Time: / Primary Location of Supply Ductwork Indoor Temperature (F): Primary Location of Return Ductworkj02. Outdoor Temperature (F): Total Leakage Test (Outside) Duct Leakage: ❑ Default ❑ Prop. Leak Free ❑ Proposed On = Test Pressure: 2f (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ass ❑ Fail Installed Pa `�* Total Leakage (cfm): `�I, 2— Total Leakage per 100 sgft: 23 CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. Testing Company Company Name: qs7J) �P yr Se �J✓� �o Address:i��//�� I hereby certify that the bove Duct Sealing Leakage results demonstrate compliance with 5t' Edition FBC Energy Conservation requirements in accordance with Section R403.. . Signature: / Printed Name: ����iG License/Certificate #:�31��