Loading...
HomeMy WebLinkAboutKMS Soil Compaction ReportHeadquarters 11345 U.S. Highway 1 IV C Sk t ENGINEERING PO Box 78-11377 lin Sebastian, FL. 32958 �,N,� AND TESTING Orlando ,�, Phone: 772 589 0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: August 24, 2021 KSM JOB #: 195235-2d/BS/jam PERMIT #: 2 (2 d NUC # 3 2 � Nuc Model: 528 MC-IDR-P Nuc Serial M MD049528 CONTRACTOR: R & E Loader Service, Inc. JOB LOCATION: 3000 Brocksmith Road Fort Pierce, Florida ITEM TESTED: Compacted Foundation Fill -1st & 2nd Lift TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1 S.W. ' 1211- 2411 45 109.6 111.5 98.3% 2 Center 110.5 1199.1% 3 N.E. 110.1 98.7% 4 N.W. 011-1211 If111.3 99.8% 5 S.E. 11 it111.0 99.6% Soil Description: Brown Sand with Traces of Shell In Place Moisture: 10.8% Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 111.5 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets 00........I/// Minimum Requirement `��,J�►�E KE��� for Unstaked Foundation�.� �,••' �./GENBF'•:� ��� Respectfully Submitted:. No. 6BS66 Digitdly, Signed* ' This lam has been deetranicollyafgnedand �•, STATE OF sealed byJelle Keller. P.E. Ft.l1. 68366 an Julie K . • ,� •• the data stated directlymthe dgM ashy. ' •, XORIOp••'♦� digRnlslemture. 'i .1 • •....... • Primed copies of this doament ans at Date: mmldered signed and sealed and ��� .lenattre mast be—ibed an any desn.k 2021.08.25 ///�►►111 ►�� copies. 13:32:24 Julie E. Keller, P:p4;Qment 113.0 i — I— -- —I- W I I I I I I I E112.0 L... _.._...�.._.._...�..�.._.,_.._ I i I I I I G 111.0HT110.0 P ••Iiii ——••.•..1JyII ....__..,III__....4tIII ....___•IIIi..___.....I�.\1L. l . 1o9T—./_I-4-_i_j_s.4yI ...__.iIi _........_ C108.0F . I I I I I 107.0 •• ' R 106.0—..y.._.t_...}.._t._..r..y.._.t_..� Y 7 8 9 10 11. 12 13 14 15 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. PE # 68366 8/25/2021 Email to: mcarthuresther@bellsouth.net Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE Headquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 T,kP C 19 ENGINEERING Iii117UML AND TESTING SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 DATE TESTED: October 20, 2021 PERMIT #: CONTRACTOR: R & E Loader Service; -Inc. JOB LOCATION: 3000 S. Brocksmith Road Fort Pierce, Florida Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #: 195235-3d/BS/jam NUC # 528 Nuc Model: MC-IDR-P Nuc Serial #: MD049528 ITEM TESTED: Compacted Foundation Fill - 3rd and Final Lift TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE (P.C:F) COMPACTION 1 S.W. 011- 1211 40 107.9 111.5 96.8% 2 Center 3 N.E. 4 N.W. 5 S.E. Soil Description: Brown Sand with Traces of Shell In Place Moisture: 9.2% 11 " 108.2 11 " 107.3 1211- 2411 11108.4 11 it 108.9 Proctor Optimum'Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 111.5 @ Test Locations the Density & Penetrometer readings indicate the 97.0% 96.2 % 97.2% " 97.7% 113.0 I I I I I I I W t l l l l l t l E 112.0 I G 111.0 ..-�.._l._..I_.. .._l._ J_..1.._ H I I I I I I I T 0.0 P Y I I I I I I I 109.0 4—.._.._•. 108.0 T-.. .. �._..�_.. � .._�._. �_.. .._ F I I I I I I I Degree of Compaction Meets `11111111f111,ft 107.0 •• ••—I•—••I—••a-••—I•—•a—••-I-••— Minimum Requirement Kett for Unstaked Foundation �� �J•• •GEN �� Respectfully Submij d : 7 8 9 10 11 12 13 14 15 UIg1.ally' No. W366 o sigrt�* key Julie* Moisture - /o of Dry Weight This (tern has been elecironlcalN signed and sealed by Julie Keger, P.F. R. Lk fiB%b on Kell# °,p ••• .• Z Disclaimer: Contractor is responsible to maintain the tested area the date stated dlrecty to the dght uvnga Date.' ' 0.t►•'•• STATE OF • Q►`� in the condition that KSM completed the indicated passed P'lad-pies of this doamentarenot I ��OIR�OQ!••�•. �� -°=deredsgnedandsealedandthe i �j�compaction test. KSM is not responsible if the tested area has nut be wrifled on any elemonic !1 -pies slgnaone 2021. �7 �i110NAL� been altered from the approved inspected condition. 16:41:53 -04'00' Julie E. Keller, P.E. President PE # 68366 10/21/2021 Email to: mcarthuresther@bellsouth.net Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business- WBE