Loading...
HomeMy WebLinkAboutLetter - Engineer's Project 6-13-16P f� Emav RECEIVED ENGINEERING, INC. MOIABOWLESVILLAMIZAR&ASSOCIATES JUN 13 2016 www.mbveng.com CA #3728 PERMITTING St. Lucie County, FL May 13, 2016 Mr. Ken Arnold St. Lucie County Building Dept. 2300 Virginia Avenue Fort Pierce, FL 34982 Subject: Litynskyj Residence - 1308 Nettles Blvd. Permit # C 1604-0131 St. Lucie County, Florida Engineer's Project Number: 16-0067:ADD Dear Mr. Arnold: This letter shall serve as certification that for the subject project, helical piers where installed in the locations required by the structural engineer of record. The helical piers were Chance Helical piers, installed to depths of 29 ft. minimum. The sixteen piers for the new residence were 1.5 inches square shaft with a triple helix (8"x10"xl2"), installed to 50 kips to 54 kips ultimate load and stopped when hitting bedrock. Should you have any questions regarding the above subject, please do not hesitate to contact our ofKk��aaaoob Truly youts,• / '®®� w p,E.-ff 61000. �•�;CCC4�t:�titi� cc: PGI MEL-RY Construction, Inc. 1835 20th Street 1250 W. Eau Gallie Blvd., Suite L 806 Delaware Avenue Vero Beach, FL 32960 Melbourne, FL 39235 Ft. Pierce, FL 34950 772.569.0035 321.253.1510 772.468.9055 Fax: 772.778.3617 Fax: 321.253.09 11 Fax: 772.778.3617 5F wrlliiam vurden ° From: Joshua Ney <ney Joshua@yahoo.com> Sent: Friday, August 05, 2016 2:15 PM To: William Durden Subject: Mel-Ry: 1604-0131 William, After our flood cert. passes, can we get inspections for roof sheathing, strapping, truss drwg, and floor joist strapping? Plumbing rough will be done at the plumbing topout since the plumber has room to work in the crawlspace. Thank you, Josh Q 1