HomeMy WebLinkAboutLetter - EngineerBV, F
NEERING, INC.
BOW LES VILLANIZARA ASSOCIATES
ES -' I w pnbwng.pom CA #3718
May 13,2016
Mr. Ken Arnold
St. Lucie County Building Dept.
2300 Virginia Avenue
Fort Pierce, VL 14982
Subject Lftynskyj Resid 1308 Nettles Blvd,.
Permit # @R5604WABW
St. Lucie County, Florida-.
Engineer's ProJectNumben 16-0067ADD
Dear Mr;.Amold:
This letter -sha ' 11 ' se ' rve as certification that for the subject project, helical piers where- installed in
the locations required. by the structural engineer- of. record.
The helical piers were Chance Helibal.pier-9jilstalled to. depths -of 29 ft. inininium.. The sixteen
piers for the new residence: were 1.5 inches square shaft, with a triple helix (8".x107xl2'.'),
installed to: 50 kips to 54 kips ultimate load and stopped when hitting bedrock.
Should yqurjjav _e,3a y questions regarding i ' the, above subject, please do. not hesitate to contact our
P,
FL.1
RV/jeh
cc: PG1
MEL-RY Construction, lnc,.
1835 70th Street
.1250 W, Eau. Gallie Blvd., Suite L
8Q6. Qelaware,Avenue
Veeb Beach, FL 32960
Melboorrfe, FL 39235
Ft: Pierce, EL 34950
772569,0035
321.253, I S. 1,0
772.468.'9055
Fax 772.378N17
:Fax::321.253.09 H
Fax: 771.778.36[7
I c.-,, 00 c!
PROFESSIONAL GROUTINGA INC.
KILICALTILING LOG
PROJECT NAME- MEL`-RY, ConstrucOoii,,Inc
PROJECTADD RESS: 1306Nettles Boulevard
START Dktg: May 9, 2016
FINISH DATE: May 6,201.6
SHAFT SIZE:: square shaft
HELIX:CONFIGURATION FOR N'CQNFIQ EW CONSTRUCTION-. 8? x'10" x, 12"
.
HELIX CONFIGURATION FOR UNDERPINNING: none
LEAI). LENCTI'll: 7'
EXTENSION Lt%T-H., 7'
NEW
CONSTRUCTION
PILE
NUMBER
KIPS
(ULTIMATE)
PILE
SECTIONS
APPROXIMATE:
DEPTH IN.FEET
150
4
29
2
52
4�
29
8
51
4
29
4-
4
5
.50.
50
4
29
6
50;
4
29,
7
54
4
29.
8
50
4
29
9
so
29
10
5,
4
29
11
51.
4
.29.
12
51,
4
29
13
5,2
4
29
14
52
4
29
1.5
53
4
29
16
50
4
29