Client: Mel-Ry Construction Date: July 30, 2014
Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 14-2097
Project: Proposed Residence Lot 612 Permit #:
Address: 10701 S. Ocean Drive, Jensen Beach, FL Tech: AM
Area Tested: Building Pad Compaction Req.: 95%
Material Type: Brown Sand w/Some Rock Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NE Corner of Pad
12"
FL
8.6
112.4
114.0
10.1
98.6%
Yes
2
1 Center of Pad
12"
FL
7.0
110.9
114.0
10.1
97.3%
Yes
3
SW Corner of Pad
12"
FL
9.4
113.3
114.0
10.1
99.4%
Yes
4
5
6
7
8
9
10
NO
11
y
12
13
14
15
Remarks: See Reverse For Disclaimer Test Performed Only On Top 12" Of Pad Not A
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift
Submitted by:
SL = Springline FL = Final Lift KEITH LEBLANC ,�� 3i! !�
SG = Subgrade BG = Below Grade Professional .Engineer #59394
BC = Basecourse BOF = Bottom of Footing Cert. of Auth6rization.#5471
TOP = Top of Pipe FG = Finished Grade State of Florida
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for pdi ilcatron of, statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material
only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on
this work.
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the
referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the
tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil
boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services
only included testing the top 12" of added fill material. This testing does not include an analysis of the underlying
soil materials to determine if they are capable of supporting the proposed structure without settlement. This
density compaction test does not warranty any underlying soil materials or conditions below the tested top 12
inches of material. If no soil borings have been performed in the location of the proposed structure, we
recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the
soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The
scope of services is for determination of the degree of compaction of the tested layer of material only. No other
analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail
compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for
building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots.
If different specifications are required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site:,,w.,or'k and should not be relied upon to represent
conditions on other areas or dates. Any subsequent site diSkurbances clue To water erosion, rain waters, construction
activities, excavations, overgrown, vegetation, traffic and, bthei= di'stuibbar ces will void this test and the site must be
H.
re -compacted and re -tested prior to construction. �t, s ': °,••.f.:: „., `�^
As a mutual protection to clients, the public and ourselves ;,U redo is are subii7itted ai e,':fhe confidential property of
clients and authorization for use, publication of staternerits,.conclusions or extracts "ff4l or regarding our reports is
reserved pending written approval_
It has been a pleasure working with you and look forward to do so in the near future:.t�-4'
•
i