HomeMy WebLinkAboutMisc LettersFebruary 28, 2022
Re: Post Installation Affidavit
fr'eedo,m
F-0 R E V E R
Project: Christopher Roote
8803 Brookline' Ave.,
Fort Pierce,.FL 34951
Permit: SLC2202-0116
To: St. Lucie County - Building Department
I, Greg Albright, hereby confirm that I have inspected the solar installation on the above reference
project: The load on the structure directly supporting the additional gravity load due to the solar panel
supports and modules has been reviewed by me post installation and it has been determined to be in
accordance with the requirements of 2020 Florida Building Code 7th Edition (ASCE 7-16). The
installation has been completed as per approved plans. -
Shingle roofing supported by 2x4 trusses @ 24 in. OC spacing. The roof is sloped at approximately 18
degrees and has a max beam span of 5 ft between supports, and it has been determined to be adequate to
support the installed loads.
The mounts and 5/16" stainless steel lag bolts or structural screws have been designed and installed
according to Florida Building Code 2020, and they have been properly sealed.
Freedom For r FL, LLC
EC13008056
State of Florida County of Broward
This foregoing instrument was acknowledged before me by means of physical presence this r Y day of
2022 by who is personally known to me.
Notary P bl c slt&of Wrida
Notary Public State of Florida
�1 WerVdyl NoNsinger
Ivly m Comission
HH 2O7963
EXP. 1/28/2026