Loading...
HomeMy WebLinkAboutLETTER- SOLAR INSTALLATION INSPECTIONFebruary 22, 2022 Re: Post Installation Affidavit 0 sib o freedom FOREVER Project: Patricia Coleman 7704 Penny Lane, Fort Pierce, FL 34951 Permit: SLC2202-0445 To: St. Lucie County - Building Department I, Greg Albright, hereby confirm that I have inspected the solar installation on the above reference project. The load on the structure directly supporting the additional gravity load due to the solar panel supports and modules has been reviewed by me post installation and. it has been determined to be in accordance with the requirements of 2020 Florida Building Code 7th Edition (ASCE 7-16). The installation has been completed as per approved plans. Shingle roofing supported by 2x4 trusses @ 24 in. OC spacing. The roof is sloped at approximately 22 degrees and has a max beam span of 5 ft between supports, and it has been determined to be adequate to support the installed loads. The mounts and 5/16" stainless steel lag bolts or structural screws have been designed and installed according to Florida Building Code 2020, and they have been properly sealed. r_U 1 JUUOuPt3 State of Florida County of Broward This foregoing instrument was acknowledged before me by means of physical presence this day of 0. fib, i 2022 by GQZcr At%3(z Cal-F'r who is personally known to me. i t N tart' Pu c St to of ri ENotary Public StateDFloridandy Noffsing H 079631onP. 1/28/2026