Loading...
HomeMy WebLinkAboutREQUEST FOR 30 DAY FOR POWER 03-07-- 22 12:54 FROM- Wynne Building Corp. 7728780224 T-862 P0003/0005 F-624 P1tij 'Jlvlar�1'en seftites Bust lit j:. bdie tson D�v�sion 230Q°V jWa Ave 0 02 . a72=462-M Fax 772-462-6-443 Request for 30-DaY Temp'oem Power;Reuse Date: `^? Permitft rtbee- Cn:�->z i sect Address: THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT'TO EXCEEQ THIRTY(30)-DAYS,FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN'PIZEPARiATTON FOR A FINAL.INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEtWY ACKNOWUDGE AND AGIEE AS FOLLOWS: 1. 7hts temporary power release is mquested for the above sited purpose only,and tiere Will be no =vancy of any type,other than that perri ittad by construction during this time period. 2. As witness by-our sign6bk-es,we hdrdby agree tb abide by all terms and conditions of this agreement, including Building Division Polley,which is 34cotterated herein by reference, 3. All conditions and ieq.uremep%listed in the attached document enIItled"Requirements fior 30 Day Power for Testing"h8ve'been"Had and the premise is ready for compliance Inspection. 4. All requests for an extension beyond 30 days must be.made in writing to the Suilding Officiai stating the reasori for the request. Power maybe removed'from,the site and/or a Stop Work Order issued If the Real:Diction has not been approved within 30 days. A fee of$100.00 will be required to Tilt the Stop Work Order: -WE HEREBY( M-USE AND AGREE TO HOLD i MLE.SSS,ST.-.LUdE COUNTY,AND THEIR EMPLOYEES..FROM:..... . ALL-LIABnMES AND CLAIMS OF'AWT)n:'B_QF N !-U W-'WCN ill!ARLSi+.NOW"O(t IN l'HE FllTIIRE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE'WHICH*MAY BE INCURRED DUE'la0 THE. DISMMECMN OF ELECTRICAL PMM IN THE EVENT OF VMLA170'N OF THIS AGREEMNT. OWNER SIGN ATU DATE CONTIiAC'1• DATE FIECMCAL CONTRACTOR SIGNATUP.E DATE FtECE1VED MAR 0 7 2022. St.Lucie County,PerFnittin0.