HomeMy WebLinkAboutEnergy Efficiency CodeVA
FORM R405-2020
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 144A RH- 3VL14XH2
Builder Name: FOCUS HOMES
Street: 7007 FORT WALTON AVE
Permit Office:
City, State, Zip: FORT PEIRCE , FL, 34951
Permit Number:
Owner: FOCUS HOMES
Jurisdiction:
Design Location: FL, ST LUCIE_CO_INTL
County: St. Lucie (Florida Climate
Zone 2 )
1. New construction or existing New (From Plans)
10. Wall Type�1642.7 sqft.)
Insulation Area
• 2. Single family or multiple family Detached
a. Concrete Block - Int Insul, Exterior
R=4.1 1325.30 ft2
3. Number of units, if multiple family 1
b. Frame - Wood, Adjacent
c. NIA
R=13.0 317.33 ft2
R= ftz
4. Number of Bedrooms 3
d. N/A
R= ft2
5. Is this a worst case? Yes
11. Ceiling Types (1443.0 sgft.)
Insulation Area
a. Under Attic (Vented)
R=30.0 1443.00 ft2
6. Conditioned floor area above grade (ft2) 1443
b. N/A
R= ft2
Conditioned floor area below grade (ft2) 0
c. N/A
R= ft2
7. Windows(115.0 sqft.) Description Area
12. Ducts
R ft2
a. U-Factor. Dbl, U=0.34 75.00 ft2
a. Sup: Attic, Ret: Main, AH: Main
6 300
SHGC: SHGC=0.23
b. U-Factor. Dbl, U=0.55 40.00 ft2
13. Cooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.25
a. Central Unit
22.8 SEER:16.00
c. U-Factor: N/A ft2
SHGC:
Area Weighted Average Overhang Depth: 1.000 ft.
14. Heating systems
kBtu/hr Efficiency
Area Weighted Average SHGC: 0.237
a. Electric Heat Pump
22.8 HSPF:9.00
8. Skylights Area
c. U-Faptor:(AVG) N/A ft2
15. Hot water systems
SHGC(AVG): N/A
a. Electric
Cap: 50 gallons
9. Floor Types (1443.0 sqft.) Insulation Area
EF: 0.950
a. Slab -On -Grade Edge Insulation R=0.0 1443.00 ft2
b. Conservation features
b. N/A R= ft2
None
c. N/A R= ft2
16. Credits
Pstat
Total Proposed Modified Loads: 43.93
Glass/Floor Area: 0.080
PASS
Total Baseline Loads: 46.79
I hereby certify that the plans and specifications covered by
Review of the plans and
ST,g1�
this calculation are in compliance the Florida Energy
Code.
specifications covered by this
indicates
OVVE
calculation compliance
with the Florida Energy Code.
PREPARED BY: / n
DATE: _olL>d l
Before construction is completed
this building will be inspected for
compliance with Section 553.908
I hereby certify that this building, as designed, is in compliance
Florida Statutes.
with the Florida E
Code.OWNER/AGEN
7er
BUILDING OFFICIAL:
DATE: `� ���
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
�t certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
10/12/2021 11:35 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 4
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
, 4!
PROJECT
Title:
tj Building Type:
Owner Name:
# of Units:
Builder Name:
Permit Office:
Jurisdiction:
Family Type:
New/Existing:
Comment:
144A RH- 3VL14XH2
User
FOCUS HOMES
1
FOCUS HOMES
Detached
New (From Plans)
Bedrooms: 3
Conditioned Area: 1443
Total Stories: 1
Worst Case: Yes
Rotate Angle: 0
Cross Ventilation:' No
Whole House Fan: No
Address Type: Street Address
Lot #
Block/Subdivision:
PlatBook:
Street: 7007 FORT WALTON
County: St. Lucie
City, State, Zip: FORT PEIRCE ,
FL, 34951
CLIMATE
/
V/ Design Location
Design Temp
TMY Site 97.5 % 2.5 %
Int Design Temp Heating Design Daily Temp
Winter Summer Degree Days Moisture Range
FL, ST LUCIE_CO_INTL FL_VERO_BEACH_MUNI 39 90
70 75 299 58 Medium
BLOCKS
Number
Name
Area Volume
1
Blocki
1443 12987
SPACES
Number
Name
Area Volume Kitchen Occupants
Bedrooms InfilID Finished Cooled Heated
1
Main
1443 12987 Yes 4
3 1 Yes Yes Yes
•
FLOORS
#
Floor Type
Space Perimeter R-Value
Area Tile Wood Carpet
1 Slab -On -Grade Edge Insulatio Main 179 ft 0
1443 ft2 ---- 0.3 0 0.7
ROOF
/
V #
Type
Roof Gable Roof
Materials Area Area Color
Rad Solar SA Emitt Emitt Deck Pitch
Barr Absor. Tested Tested Insul. (deg)
1
Hip Composition shingles 1614 ft2 0 ft2 Medium
N 0.85 No 0.9 No 0 26.6
ATTIC
/
V #
Type
Ventilation Vent Ratio (1 in)
Area RBS IRCC
1
Full attic
Vented 150 1443 ft2 N N
CEILING
#
Ceiling Type
Space R-Value Ins Type Area Framing Frac Truss Type
1
Under Attic (Vented)
Main 30 Blown
1443 ft2 0.07 Wood
10/12/2021 11:35 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 4
FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
WALLS
/
Adjacent Space
Cavity Width
Height
Sheathing Framing Solar Below
v # Omt To Wall Type p R-Value Et In-EtJn Qrea_
R-Value-Eraction--Absor_Grade%--
1 N
Exterior Concrete Block - Int Insul Main
4.1 20 9
4 186.7 ft2
0 0.6
0
,2 E
Exterior Concrete Block- Int Insul Main
4.1 48 9
4 448.0 ft2
0 0.6
0
_ 3 S
Exterior Concrete Block - Int Insul Main
4.1 40 9
4 373.3 ft2
0 0.6
0
4 W
Exterior Concrete Block - Int Insul Main
4.1 34 9
4 317.3 ft2
0 0.6
0
5 N
Garage Frame - Wood Main
13 34 9
4 317.3 ft2
0.19 0.01
0
DOORS
#
Ornt Door Type Space
Storms
U-Value
Width Height
Area
Ft
In Ft In
1
N Insulated Main
None
.16 3
8
24 ft2
2
N Insulated Main
None
.16 2
6 6 8
16.7 ft2
WINDOWS
Orientation shown is the entered orientation =>) changed to Worst Case.
/
Wall
Overhang
V #
Ornt ID Frame Panes NFRC
U-Factor SHGC Imp
Area Depth
Separation Int Shade
Screening
1
N 1 Vinyl Low-E Double Yes
0.34 0.23 N
20.0 ft2 1 ft 0 in
2 ft 0 in Drapes/blinds
None
2
E 2 Vinyl Low-E Double Yes
0.34 0.23 N
15.0 ft2 1 ft 0 in
2 ft 0 in Drapes/blinds
None
3
S 3 Vinyl Low-E Double Yes
0.34 0.23 N
20.0 ft2 1 ft 0 in
2 ft 0 in Drapes/blinds
None
4
S 3 Vinyl Low-E Double Yes
0.34 0.23 N
20.0 ft2 1 ft 0 in
2 ft 0 in Drapes/blinds
None
5
S 3 Metal Low-E Double Yes
0.55 0.25 N
40.0 ft' 1 ft 0 in
1 ft 0 in Drapes/blinds
None
GARAGE
#
Floor Area Ceiling Area
Exposed Wall Perimeter
Avg. Wall Height
Exposed Wall Insulation
1
413 ft2 413 ft2
40 ft
9 ft
1
INFILTRATION
# Scope
Method SLA CFM 50 ELA EgLA ACH
ACH 50
1 Wholehouse Proposed ACH(50) .0004
1515.2 83.13 156.06 .1324
7
HEATING SYSTEM
#
System Type Subtype
Speed Efficiency
Capacity
Block
Ducts
1
Electric Heat Pump/ None
Singl HSPF:9
22.8 kBtu/hr
1
sys#1
COOLING SYSTEM
#
System Type Subtype
Subtype Efficiency
Capacity Air Flow SHR Block
Ducts
1
Central Unit/ None
Singl SEER: 16 22.8 kBtu/hr 684 cfm 0.73 1
sys#1
4-
10/12/2021 11:35 AM EnergyGaugeO USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 3 of 4
FORM R405-2020 INPUT SUMMARY CHECKLIST RFPnRT
HOT WATER SYSTEM
#
System Type SubType
Location
EF Cap Use
SetPnt
Conservation
1
Electric None
Garage
0.95 50 gal 60 gal
120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cert #
Company Name
System Model # Collector Model # Area
Volume
FEF
None
None
ft2
DUCTS
--- Supply —
--- Return ---
Air
CFM 25
CFM25
HVAC #
#
Location R-Value Area
Location
Area Leakage Type
Handler
TOT
OUT QN RLF
Heat Cool
1
Attic 6 300 ft2
Main
20 ft2 Default Leakage
Main
(Default) (Default)
1 1
TEMPERATURES
Programable Thermostat: Y
Ceiling Fans:
Coolin ]Jan
f X]
rX] Feb �X Mar
X A r
f
[X Ma Jun ]Jul
X1 Au
] Se
] Oct Nov
[X Dec
Heating Jan
EX] Feb EX� Mar
X� Apr
[X1 May X� JunX] Jul
f X] Aug
X] Sep
JX
IX]
X] Oct X] Nov
IX
(X� Dec
Venting X Jan
X Feb X Mar
X Apr
X May [X]] Jun [X] Jul
[X]]] Aug
X] Sep
Xj Oct XJ Nov
[X]]] Dec
Thermostat Schedule: HERS 2006 Reference
Hours
Schedule Type
1
2 3
4, 5 6
7
8
9
10 11
12
Cooling (WD)
AM 78
78 78
78 78 78
78
78
80
80 80
80
PM 80
80 78
78 78 78
78
78
78
78 78
78
Cooling (WEH)
AM 78
78 78
78 78 78
78
78
78
78 78
78
PM 78
78 78
78 78 78
78
78
78
78 78
78
Heating (W'D)
AM 66
66 66
66 66 68
68
68
68
68 68
68
PM 68
68 68
68 68 68
68
68
68
68 66
66
Heating (WEH)
AM 66
66 66
66 66 68
68
68
68
68 68
68
PM 68
68 68
68 68 68
68
68
68
68 66
66
MECHANICAL VENTILATION
Type
Supply CFM
Exhaust CFM Fan Watts HRV Heating System
Run Time Cooling System
None
0
0
0 0 1 - Electric Heat Pump
0%
1 -Central Unit
MASS
Mass Type
Area
Thickness Furniture Fraction
Space
Default(8 Ibs/sq.ft.
0 ft2
Oft
0.3
Main
10/12/2021 11:35 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software . Page 4 of 4
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIRBARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: 144A RH- 3VL14XH2 Builder Name: FOCUS HOMES
Street: 7007 FORT WALTON AVE Permit Office:
City, State, Zip: FORT PEIRCE , FL, 34951 Permit Number:
Y
Owner: FOCUS HOMES Jurisdiction:
U
_
Design Location: FL, ST_LUCIE_CO_INTL
c�
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and an gaps in the air barrier shall be sealed.
Y 9 P
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be airtight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind piping and wiring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinkler cover plates and walls or ceilings.
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
10/12/2021 11:35 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1