HomeMy WebLinkAboutEnergy Efficiency CodeI+'ile Copy
FORM R405-2014
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: TOM & SHARON ENGLISH
Builder Name:
f Vreet: 5339 MONTEGO CIRCLE
Permit Office:
CiVtate, Zip: FT. PIERCE, FL,
Permit Number:
Ovoft,�r:
Jurisdiction:
Design Location: FL, Fort Pierce
County:: ST. LUCIE COUNTY (Florida Climate Zone 2 )
1. New construction or existing Addition
9. Wall Types (354.7 sgft.)
Insulation Area
2. Single family or multiple family Single-family
a. Frame - Wood, Exterior
R=11.0 354.67 ft2
b. N/A
R= ft2
3. Number of units, if multiple family 1
c. N/A
R= ft2
4. Number of Bedrooms(Bedrms In Addition) 1(1)
d. N/A
R= ft2
10. Ceiling Types (235.0 sgft.)
Insulation Area
5. Is this a worst case? No
a. Under Attic (Vented)
R=19.0 235.00 ft2
6. Conditioned floor area above grade (ft2) 235
b. N/A
R= ft2
Conditioned floor area below grade (ftz) 0
c. N/A
R= ft2
11: Ducts
R ft2
7. Windows(26.0 sqft.) Description Area
a. Sup: Attic, Ret: Attic, AH: Exterior
6 47
a. U-Factor: Dbl, U=0.65 26.00 ft2
SHGC: SHGC=0.25
b. U-Factor: N/A ft2
12. Cooling systems
kStu/hr Efficiency
SHGC:
a. Central Unit
35.0 SEER:13.00
c. U-Factor: N/A ft2
SHGC:
13. Heating systems
kBtu/hr Efficiency
d. U-Factor: N/A ft2
a. Electric Strip Heat
17.0 COP:1.00
SHGC:
Area Weighted Average Overhang Depth: 2.000 ft.
Area Weighted Average SHGC: 0.250
14. Hot water systems - None required
a.
Cap: N/A
pes (235.0 sgft. Insulation Area
8. FloorTypes y )
EF: 0.000
a. Raised Floor R=19.0 235.00 ft2
b. Conservation features
b. N/A R= ft2
c. N/A R= ft2
15. Credits
CF, Pstat
Glass/Floor Area: 0.111 Total Proposed Modified Loads: 14.15
PASS
Total Baseline Loads: 14.52
1 hereby certify that the plans and specifications covered by
Review of the plans and
this calculation are in compliance with the, Florida Energy
specifications covered by this
Code.
calculation indicates compliance
with the Florida Energy Code.
PREPARED BY:
DATE: -
Before construction is completed
this building will be inspected for
compliance with Section 553.908
0 F.;I y
I hereby certify that this building, as designed, is in complian
Florida Statutes.
✓�, ��
B
CO'D
with the Florida Energy Cod J
WE
OWNER/AGENT:
BUILDING OFFICIAL:
DATE: 71DATE:
/ -r_r
- Compliance requires certification by the air handier unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.2.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage
test report in accordance with R402.4.1.2.
1/12/2017 6:17 AM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 4
FORM R405-2014
PROJECT
Title:
Building Type:
Owner:
# of Units:
Builder Name:
Permit Office:
Jurisdiction:
Family Type:
New/Existing:
Comment:
TOM & SHARON ENGLISH Bedrooms: 1
User Conditioned Area: 235
Total Stories: 1
1 > Worst Case: No
Rotate Angle: 0
Cross Ventilation: No
Whole House Fan: No
Single-family
Addition
Address Type:
Lot #
Block/SubDivision:
PlatBook:
Street:
County.
City, State, Zip:
Street Address
5339 MONTEGO CIRC
ST. LUCIE COUNTY
FT. PIERCE,
FL,
CLIMATE
/
V Design Location
IECC Design Temp
TMY Site Zone 97.5 % 2.5 %
int Design Temp Heating Design Daily Temp
Winter Summer Degree Days Moisture Range
FL, Fort Pierce
FL VERO_BEACH_MUNI 2 39 90
70
75 299
62 Low
BLOCKS
Number
Name
Area Volume
1
Blockl
235 1880
SPACES
Number
Name
Area Volume Kitchen Occupants
Bedrooms
Infi11D Finished Cooled Heated
1
ADDITION
235 1880 Yes 1
1
1 Yes
Yes Yes
FLOORS
#
Floor Type
Space R-Value
Area
Tile Wood Carpet
1 Raised Floor
ADDITION
235 ft2
19
1 0 0
ROOF
/
#
Type
Roof Gable Roof
Materials Area Area Color
Solar
Absor.
SA Emitt
Tested
Emitt Deck Pitch
Tested Insul. (deg)
1
Gable or shed
Composition shingles 255 ft2 48 ft2 Medium
0.6
No 0.9
No 0 22.6
ATTIC
V #
Type
Ventilation Vent Ratio (1 in)
Area
RBS IRCC
1
Full attic
Vented 150 235 ft2
L
N N
CEILING
#
Ceiling Type
Space R-Value Ins Type Area Framing Frac Truss Type
1
Under Attic (Vented) ADDITION 19 Blown
235 ft2 0.11
Wood
1/12/2017 6:17 AM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 2 of 4
FORM R405-2014
WALLS
# Ornt
Adjacent
To Wall Type
Cavity Width Height Sheathing Framing Solar
Space R-Value Ft In Et In Area R-Value Fraction Ahsor
Below
Grade/
1 N
—2 E
3 S
Exterior Frame - Wood
Exterior Frame - Wood
Exterior Frame - Wood
ADDITION 11 13 8 8 109.3 ft2 0.23 0.5
ADDITION 11 17 8 136.0 ft2 0.23 0.5
ADDITION 11 13 8 8 109.3 ft2 0.23 0.5
0
0
0
WINDOWS
Orientation shown is the entered, Proposed orientation.
#
Wall
Ornt ID Frame Panes
Overhang
NFRC U-Factor SHGC Area Depth Separation Int Shade
Screening
1
2
E 2 Metal Low-E Double Yes 0.65 0.25' 20.0 ft2 2 ft 0 in 1 ft 4 in Drapes/blinds
E 2 Metal Low-E Double Yes 0.65 0.25 6.0 ft2 2 ft 0 in 1 ft 4 in Drapes/blinds
None
None
INFILTRATION
# Scope
Method
SLA CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Proposed ACH(50)
.000356 219.3 12.04 22.65 .2598 7
HEATING SYSTEM
#
System Type
Subtype Efficiency Capacity Block
Ducts
1
Electric Strip Heat
None COP:1 17 kBtu/hr 1
sys#1
COOLING SYSTEM
#
System Type
Subtype Efficiency Capacity Air Flow SHR Block
Ducts
1
Central Unit
None SEER: 13 35 kBtu/hr 1050 cfm 0.75 1 .
sys#1
SOLAR HOT WATER SYSTEM
FSEC
Cert # Company Name
Collector Storage
System Model # Collector Model # Area Volume FEF
ft2
DUCTS
#
--- Supply --
Location R-Value Area
-- Return -- Air CFM 25 CFM25 HVAC #
Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool
1
Attic 6 47 ft2
Attic 10 ft2 Default Leakage Exterior (Default) (Default)
1 1
1/12/2017 6:17 AM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 3 of 4
Fr)PR l Rdnti_gnIA
TEMPERATURES
Programable Y
Ceiling Fans:
]Thermostat:
Heating X] Jan
Feb
Mar
ki
ri Jun
Jul
rl
Au
ri
ri
Se
Sep
Oct
W Oct
Nov
Nov
Dec
H DecVenting
[[ jj Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
X�
Thermostat Schedule:
HERS 2006
Reference
Hours
Schedule Type
1
2
3
4
5
6
7
8
9
10
11
12
Cooling (WD)
AM
78
78
78
78
78
78
78
78
80
80
80
80
PM
80
80
78
78
78
78
78
78
78
78
78
78
Cooling (WEH)
AM
78
78
78
78
78
78
78
78
78
78
78
78
PM
78
78
78
78
78
78
78
78
78
78
78
78
Heating (WD)
AM
66
66
66
66
66
68
68
68
68
68
68
68
PM
68
68
68
68
68
68
68
68
68
68
66
66
Heating (WEH)
AM
66
66
66
66
66
68
68
68
68
68
68
68
PM
68
68
68
68
68
68
68
68
68
68
66
66
1/12/2017 6:17 AM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 4 of 4
FORM R405-2014
TABLE 402.4.1.
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: TOM & SHARON ENGLISH Builder Name:
Street: 5339 MONTEGO CIRCLE Permit Office:
City, State, Zip: FT. PIERCE, FL, Permit Number:
Owner: Jurisdiction:
Design Location: FL, Fort Pierce
COMPONENT
CRITERIA
CHECK
Air barrier and thermal barrier
A continuous air barrier shall be installed in the building envelope.
Exterior thermal envelope contains a continuous barrier.
Breaks or joints in the air barrier shall be sealed.
Air -permeable insulation shall not be used as a sealing material.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with the
insulation and any gaps in the air barrier shall be sealed.
Access openings, drop down stairs or knee wall doors to unconditioned
attic spaces shall be sealed.
Corners and headers shall be insulated and the junction of the foundation
Walls
and sill plate shall be sealed.
The junction of the top plate and the top or exterior walls shall be sealed.
Exterior thermal envelope insulation for framed walls shall be installed in
substantial contact and continuous alignment with the air barrier.
Knee walls shall be sealed.
Windows, skylights and doors
The space between window/door jambs and framing and skylights and
framing shall be sealed.
Rim joists
Rim joists are insulated and include an air barrier.
Floors (including above -garage
Insulation shall be installed to maintain permanent contact with underside
and cantilevered floors)
of subfloor decking.
The air barrier shall be installed at any exposed edge of insulation.
Crawl space walls
Where provided in lieu of floor insulation, insulation shall be permanently
attached to the crawlspace walls.
Exposed earth in unvented crawl spaces shall be covered with a Class I
vapor retarder with overlapping joints taped.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shaft openings to exterior or
unconditioned space shall be sealed.
Narrow cavities
Batts in narrow cavities shall be cut to fit, or narrow cavities shall be filled
by insulation that on installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spaces.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope shall be
air tight, IC rated, and sealed to the drywall.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring and plumbing in
exterior walls, or insulation that on installation readily conforms to available
space shall extend behind piping and wiring.
Shower/tub on exterior wall
Exterior walls adjacent to showers and tubs shall be insulated and the air
barrier installed separating them from the showers and tubs.
Electrical/phone box on
The air barrier shall be installed behind electrical or communication boxes or
air sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall be
sealed to the sub -floor or drywall.
Fireplace
An air barrier shall be installed on fireplace walls. Fireplaces shall have
gasketed doors
1/12/2017 6:17 AM EnergyGauge® USA - FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 1