Loading...
HomeMy WebLinkAboutInspection Reporti L / Buil t ,"Sidi .Mo B: itt,; ,�:$,t= better. Insp�-,.ctlon Report ❑ BuiltSmart Sampling ❑BuiltSmart 2 Inspections Eg'P-re-Drywall ❑ Final Inspection• ❑ Re -inspection . I Q ❑2009 IECC* ❑,2012 IECC* ❑ 2015 IECC* . Date: (_ / / V *Code Compliance only relates to Infiltration and Duct Leakage Testing Model: FA(95 DivisionOSV Community: 0-xw\ n6 LC'l(e5 Lot#_ Address: 53G$ 0cQc,y-,6 UeY,6 G\TCke_ City: ' oOA Q%e,rce. Orientation: E. State: R_ Zip code: 3Y 951 Electrical Meter # Gas Meter # Foundation: ❑Slab ❑ Crawl Space* ❑ Basement** ❑ Above Conditioned Space *If Crawl Space: ❑ Enclosed Vented ❑ Conditioned **If Basement: ❑ 50 percent below grade 9 List all deficient items, general notes, and recommendations (attach additional notes if necessary) R SR ,(R-Required; SR -Strongly Recommended) ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Additional deficient items are listed on page 2 ❑ 1. Duct Leakage @ 25 Pascal*: Total (cfmzs) Unconditioned (cfmzs) Cond. Area (ftz) Total Leakage (%)`i!L'eakag(tbUneonditioned'("/oj System 1) f Y5 ] i cfmzs cfmzs - oC 1 � 5 , ftz = a - � S %Total % to Unconditioned System 2) f cfmzs cfmzs] _ ftz = System 3) f cfmzs cfmzs] _ ftz = ❑ 2. Infiltration CFM50*t * 60 / Cu. Volume % Total % to Unconditioned % Total % to Unconditioned (Final) ACH50 1SILR_43 NWt:I,.;HA`r J y�i�liion 'yequation7.Scliu)/ person +Urfa/100s.f condidonedspacej IN S YSTEM 'Quami y n ncrirar !us + 1 = of ;, enple 7.5'�umberofWdrooms' _�'i aX.0�' A;Lot: —__.___...-- Total ventilatioll needed: = N 'Testing procedures compliant vith 2009IECC R102:4.23 Envelope and R403.Z2 Duct Leakage and 2012IECCR402.4.L2 Envelope and R403.Z2 Duct Leakage. (See local code official and code book for specific parameters.) Inspection i24-sult: DIASS ❑ FAIL ❑ N/A (Re -inspection Required if Fail is Checked) Duct Blaster Result: PASS ❑ FAIL ❑ N/A (Re -inspection Required if Fail is Checked) Infiltration (Final Inspection): ❑ PASS ❑ FAIL ELN/'(Re-inspection Required if Fail is Checked) HERS Provider: HERS Rater Signature: Builder Employee Signature: PEG HERS Co. Name: 15Lightyears — Builder Company Name: Ryan Homes Date: PEG LLtflie COPY 11130 FairfT, Va. 2203R PPROVAL 1�11i� File Copy A PARTIAL APPROVAL- Environmental ►� BuiltSm, art. Report & P EG Buitt i6live: ijetter. Observations IECC - 2009/2012/2015 , *Due to the stage of construction PEG, LLC is unable to visually inspect all building materials for suspected fungal growth Is Visible Suspected Fungal Growth Observed: ❑ Yes J6 No If yes, Ouantify the Total p <10sgft D >10sgft (PROFESSIONAL REMEDIATION RECOMMENDED) Do any building materials appear to be wet or have been wet: ❑ Yes 0 No Apparent source of water/moisture: 1. 2. 3. Are building, materials being stored in house that have possible exposure to -the elements: ❑ Yes 0 No List all observations below: R SR (R-Required; SR -Strongly Recommended) ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ PEG LLC 3975 Fair Ridge Drive, Fairfax, VA 22033 703-934-2777 Vwl'� Buller lluilf to We better. Data Collection Form IECC - 2009/2012/2015 Yes NO R value Grade Sections: Inspection Guidelines (Must Be selected) 1.1 Is the foundation/crawl space wall insulated? ❑ ❑ ❑ I ❑ 203 1. Thermal Qualities of the 1.2 If framed, list the stud spacing and R value of the insulation ❑ ❑ Eli ❑ 2❑3 foundation and slab 1.3 Is the slab insulated? ❑ ❑ ❑ I ❑ 2❑3 1.4 Special circumstances: El i ❑ 1 ❑ 2❑3 2. Framed Floors 2.1 Is there a framed floor above a garage? ❑ ❑ ❑ 1 ❑ 2❑3 2.2 Are there any cantilever floors requiring insulation? ❑ ❑ ❑ 1 El2❑3 2.3 Are there any crawl space floors requiring insulation? ❑ ❑ Ell ❑ 2❑3 3. Rim/Band 3.1 Rim/Band Joist Insulation ❑ ❑ ❑ 1 ❑ 2❑3 Joists, Above 3.2 Above grade wall insulation (Must touch all 6 sides) ❑ ❑ ❑ 1 ❑ 203 Grade Walls, Attic Knee 3.2a Insulation Brand: Walls, Continuous 3.3 Attic knee wall insulation (Must touch all 6 sides) ❑ El 1 ❑ 2❑3 Insulation and 3.4 Ceilings: Batt: ❑Blown: ❑✓ ❑✓ ❑ R-38 [DI ❑ 2❑3 Ceilings 3.5 Attic access panel/stairs: 6 ft2 ❑✓ ❑ R-30 ❑✓ 1 ❑ 2❑3 3.6 Continuous Insulation- Building material: ❑ ❑ ❑ 1 ❑ 2❑3 3.7 Special circumstances: ❑ ❑ ❑1 ❑ 2❑3 U SHGC E-Star 4. Windows and 4.1 Window type: Vinyl ❑ Wood ❑ Metal ❑ Other ❑ Y❑ N ❑ doors 4.2 Glass doors: Vinyl ❑ Wood ❑ Metal ❑ Other ❑ Y❑ N ❑ 4.3 Door: Fiberglass❑ Wood ❑ Metal ❑ Other ❑ Y❑ N ❑ Notes: 5. Mechanicals 5.1 Number of mechanical systems: ❑ 1 02 ❑ 3 ❑ Natural' Gas 5.2 System 1: Programmable stat 0 Forced air ❑ Hydronic ❑ ❑ Propane Gas 5.2a Manufacturer: Location: ❑ Heat Pump 5.2b Model: Serial: ❑ GS Pump 5.2c Condenser coil int. Model: Serial: ❑ Oil 5.2d Condenser exterior Model: Serial: 5.2e Percentage of duct system in un-conditioned space: 5.2f Are the correct circuit breakers installed?: Y: ❑N: ❑ _ PEG LLC 3975 Fair Ridge Drive, Fairfax, VA 22033 703-934-2777 5.3 System 2: Programmable stat ❑ Forced air ❑ Hydronic ❑ 5. Mechanicals continued 5.3a Manufacturer: Location: ❑ Natural Gas 5.3b Model: Serial: ❑ Propane Gas 5.3c Condenser coil int. Model: Serial: ❑ Heat Pump 5.3d Condenser exterior Model: Serial: ❑ GS Pump 5.3e Percentage of duct system in un-conditioned space: ❑ Oil 5.3f Are the correct circuit breakers installed?: Y: ❑ N: ❑ 5.4 System 3: Programmable stat ❑ Forced air ❑ Hydronic ❑ l 5.4a Manufacturer: Location: ❑ Natural Gas 5.4b Model: Serial: ❑ Propane Gas 5.4c Condenser coil int. Model: Serial: ❑ Heat Pump 5.4d Condenser exterior Model: Serial: ❑ GS Pump 5.4e Percentage of duct system in un-conditioned space: ❑ Oil 5.4fAre the correct circuit breakers installed?: Y:❑ N:❑ 6.1 Manufacturer: 6. Water heater 6.2 Model: Serial: ❑ Natural Gas 6.3 Type: Tanked ❑ Tankless ❑ ❑ Propane 6.4 Location: Conditioned space ❑ d Un-conditioned space ❑ ❑ Electric .6.5 Plumbing pipes: Insulated ❑ Insulation jacket ❑ ❑ Oil 7.1 Type: ERV ❑ HRV ❑ Exhaust ❑ Supply ❑ 7. Mechanical ventilation 7.2 Manufacturer/model/serial: Wattage: 7.4 Con hols0im�]"� i'ar ASHRAE 62-2-2010 Ca�ul��Q�fton�5cfm)�Pe Ic m/IOOs.. conditioneds ace *Quantity ofbedrooms +/ = k ofpeople 7.5 Number of Bedrooms: Total conditioned s.f. of Lot: Total ventilation needed: _ 8.1 Lighting: a) CFL Bulbs °/a 95 8. Lighting and b) Pin -Based Fluorescent Bulbs % appliances c) Energy Star Incandescent Bulbs % d) LED Bulbs % 8.2 Energy Star Refrigerator Model: Serial: kWh: 8.3 Energy Star Dishwasher Model: Serial: EF : 8.4 Energy Star Cloths Washer: Model: Serial: 8.5 Range/Oven: ❑ Induction Range ❑ Convection Oven Fuel: ❑Natural Gas ❑ Propane ❑Electric 8.6 Clothes Dryer: Fuel: ❑Natural Gas ❑ Propane ❑Electric 8.7 Number of Energy Star Ceiling Fans: 0 8.7 Number of Energy Star Bathroom Fans: 0 PEG LLC 3975 Fair Ridge.Drive, Fairfax, VA 22033 703-934-2777 1 Bui ItSniart Bultudl live better. PEG IN IECC - 2009/2012/2015 SEF Oakland Lakes NWJF 7 5368 Oakland Lake Circle Fort Pierce FL 34951 1 Overall A><r Barr><er and Thermal 8arr><e>r-'Al><griment Defcteneies gater vezl�d N/ Requirement: Insulation shall be installed in full contact with sealed interior and exterior air barrier except for aLtemate to interior air barrier under item no. 2 (Walls Adjoining Exterior Walls or Unconditioned Spaces) 1.1 Overall alignment Throughout home J 1.2 Garage Rim/Band Joist Air Barrier ✓ 1.3 Attic Eave Baffles where Vent/Leakage Exists J 1.4 Air seal all Rim Joist Cavities J Full:; Ali ned A_ �rnBarriers , 2.1 Walls Behind Shower and Tubs J 2.2 Wall Behind Fireplace J 2.3 Insulated Attic Slopes/Walls J 2.4 Attic Knee Walls J 2.5 Double Walls ✓ 2.6 Dropped Ceiling/Soffit J 2.7 All other Exterior Walls J 3: Floors between Conditioned and Exterior S aces ; Requirement: Insulation is installed to maintain permanent contact with sub -floor above including necessary supports 3.1 InsulatedFloor Above Garage J 3.2 Insulated Cantilever Floor ✓ 3.3 Floor Above Unconditioned Basement or Unconditioned Crawlspace ✓ 3.4 Air Barriers Installed at Any Exposed Fibrous Insulation Edges J 4 A>tre Sealin : ; Requirements:. -Openings to unconditioned space are fully sealed with solid blocking or flashing and any remaining gaps are sealed with caulk or foam (provide fire - rated collars and caulking where required) - All attic penetrations and dropped ceilings include a full interior air barrier aligned with insulation with any gaps fully sealed with caulk or foam -Movable insulation fits snugly in opening and air barrier is fully Gsketed 4.1 Duct/Flue Penetration 4.2 Plumbing/Piping Penetration J 4.3 Electrical Wiring Penetration 4.4 Continuous. Top and bottom Plates Sealed J 4.5 Rough Opening Around Windows and Doors Sealed with Caulk or Foam V 4.6 Common Wall Between Dwelling Units Sealed at All Exterior Boundaries J 4.7 Attic Access Panel/ Drop Down Stairs fully Gasketed and Insulated ✓ 4.8 Door Adjacent to Unconditioned Space or Ambient Conditions made Substantially Air -Tight ✓ -4.9 Recessed Light Fixtures are ICAT Labeled and Sealed to Drywall ✓ 4.10 Bathroom and Kitchen Exhaust Fans are Sealed to Drywall ✓ 4.11 Light Tubes Adjacent to Unconditioned Space Include Lens Separating Unconditioned and Conditioned Space and Are Fully Gasketed ✓ 4.12 All Above -Grade Sill Plates Adjacent to Conditioned Space Sealed to Foundation or Sub -Floor with Caulk, Foam, or Equivalent Material. Foam -gasket also Placed Beneath Above -grade Sill Plates if Resting Atop Concrete or Masonry and Adjacent to Conditioned Space ✓ 4.13 At Top of Wall Adjoining Unconditioned Spaces, Continues Top Plates or Sealed Blocking using Caulk, Foam, or Equivalent 5: *Reduce Thermal�Br.><d in ik 5.1 For Insulated Ceiling with Attic Space Above, Insulation Extends to The Inside Face of the Exterior Wall J 5.2 All Corners Insulated to Edge J 5.3 All Headers above Window and Door are Insulated / R�ater`�Nai»e�'Dylan Txtxdalls aterfSYgnafriieDyT ADuilder Name 4 R an Ho es � f mm- - � m �yy �_ +�+ 3 it �.i � '� c S x �� Austin Blankenship >Enspect><on Dafe 04/19/2018' Field Rater/Inspector , c % PEG LLC 3975 Fair Ridge Drive, Fairfax, VA 22033 703-934-2777