Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Helical Pile Installation Record
L*'---------------------------------------1 BROWNIE COMPANIES LLC. ' Helical Pile Installation Observation Record PROJECT NAME Alioto Residence PROJECT NUMBER 15-2017 PROJECT LOCATION 121 Queens Guinevere Ct., Fort Pierce, FL 34949 DATE OF INSTALLATION 9/2/2017 PILE DESIGNATION 1 2 3 4 5 6 7 GRID LOCATION N/A N/A N/A N/A N/A N/A N/A Z FINISH FLOOR O ELEVATION I- PLANNED W TOP OF PILE J w DEVIATION N/A N/A N/A N/A N/A N/A N/A 0 HORIZONTAL DEVIATION N/A N/A N/A N/A N/A N/A N/A H rn INCLINATION ANGLE 90 90 90 90 90 90 90 d INCLINATION DEVIATION N/A N/A N/A N/A N/A N/A N/A 3: REQUIRED'. MINIMUM ' N/A N/A N/A N/A N/A N/A N/A Z TOTAL INSTALLED w ' J - ABOVEGROUND N/A N/A N/A N/A N/A N/A N/A } LENGTH 7' T 7' 71 7' 7' T J o NUMBER HELLICESF 3 3 3 3 3 3 3 0 HELIX DIAMETER 011/1211/14' 0"/12"/14' 0"/12'714' O'712'714' O'712"/14' O'712'714' 0"/12'714" z O LENGTHS ` 7' 7' 7' 7' 7' 7' 7' HELICES NIA N/A N/A N/A N/A, N/A N/A rw W CUT-OFF LENGTH NIA N/A N/A N/A 1__NIALI. N/A N/A DEPTH FT 7 600 500 500 600 500 500 600 z 14 700 600 700 600 800 800 700 w 21 900 1000 1100 1100 1100 1100 9Omit D 28 1800 1800 2000 1900 1800 2000 w .•�,� o p �• 6 o a REQUIRED CAPACITY 14 TONS 14 TONS 14 TONS 14 TONS 14 TONS 14 TONS 4 N FINAL CAPACITY 15.1 TONS 15.1 TONS 16.8 TONS 16 TONS 15.1 TONS 16.8 TONS 15.1�� rW- OTHER N/A N/A N/A N/A N/A N/A N/A PLANNED TYPE N/A N/A N/A N/A N/A N/A N/A LL r= REQUIRED PENETRATION N/A N/A N/A N/A N/A N/A N/A W CO) MEASURED PENETRATION N/A N/A N/A N/A N/A N/A N/A PILE MANUFACTURER MAGNUM PIERING INSTALLATION CONTRACTOR Brownie Co. INSTALLATION EQUIPMENT 12K PRO -DIG HYDRAULIC DRIVE HEAD METHOD OF TORQUE MEASUREMENT IN -LINE PRESSURE RELIEF FIELD REPRESENTATIVE Jamison Brownie REVIEWER Stiles Engineering Group f � •______________________________________-------------------- BROWNIE COMPANIES Helical Pile Installation LLC. Observation Record L----------------------------------------------------------------------' PROJECT NAME Alioto Residence PROJECT NUMBER 15-2017 PROJECT LOCATION 121 Queens Guinevere Ct., Fort Pierce, FL 34949 DATE OF INSTALLATION 9/2/2017 PILE DESIGNATION 8 GRID LOCATION N/A Z FINISH FLOOR 0 ELEVATION I!_ PLANNED TOP OF PILE _j J w DEVIATION N/A IL HDEVIATION ZO N/A F- INCLINATION fn ANGLE 90 d INCLINATION DEVIATION N/A REQUIRED' _ -MINIMUM., N/A Z w TOTAL INSTALLED.,.-.;;, J ABOVE GROUND NIA LENGTH 71 w NUMBER OF ui 0 HELICES 3 w 5 HELIX DIAMETER r� rr 0 /12 /14rr OLENGTHS 71 HELICES N/A WW W CUT-OFF LENGTH t` „ N/A DEPTH FT 7 500 14 600 Z Lu 21 900 y 28 1900 a w i w O 0 0 REQUIRED o < CAPACITY 14 TONS cc FINAL CAPACITY 16 TONS 4 n OTHER NIA PLANNED TYPE N/A O F REQUIRED N/A F PENETRATION (n Cl) MEASURED N/A PENETRATION PILE MANUFACTURER MAGNUM PIERING INSTALLATION CONTRACTOR Brownie Co. INSTALLATION EQUIPMENT 12K PRO -DIG HYDRAULIC DRIVE HEAD METHOD OF TORQUE MEASUREMENT IN -LINE PRESSURE RELIEF FIELD REPRESENTATIVE Jamison Brownie REVIEWER Stiles Engineering Group