Loading...
HomeMy WebLinkAboutpower release+COU NTY F 1 0 P. I O A Planning & Development Services Building & ICode Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 Request for, 30-Day Temporary Power Release Dave - -9 _ a a— _ Permit Number: _ a 10t� _O A01 Project Address: _ y -A _hA _� C- .'e ,c -�ERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POVNER TO THE ABOVE DE5CRI9ED PRC` E;! ", FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AN.; E-`JIPMEN7 IN PREPARATION FOR A FINAL INSPECTION. IN CO"JSIDEFRATION OF APPROVAL OF TFiF RE-_ -`' WE HE;.=BY ACKNOWLEDGE AND AGREE AS FOLLOWS: -`is temnora y power r_Ieas is requested for the above statel purpose o��iy and there ti;,'1 be no :upar,Cy of any type, other than that perrnitted by construction during this ame peril. AS witness by our signatures, we hereby cl;ree to abide by all terms and conditions of this age?ment, ir:cluding Euitiding Division Policy, which is incorporated herein by reference. 41i coldit ons and requiremen`.s listed in the attached dxurnent entitled "Regjirements for 3i, ;jey -ower for 7estinq" have beTn fulfilled and the premise is ready for compliance inspection A" -equesL for an extension beyond 30 days must be rnade in writing to the Budding Gffical sta_i.,g the rFason for the request. Power may be removed from the site. and. a, a St(V Work Order issuec; ji try Firial Inspection has not beer; approved within 30 days. A fee of :''e Stop V"Ork Order. $ I00 0+.) will be reqnra,, cc ! ft WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNPr, A-L LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISENON, OR IN HE FOTUR Fn� OF THIS TRANSACTICN, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE ' OJT DISCONNECTION OF ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREE.MEN �1\ 1;NATu?= GE-NEP,AL COtdTPACTC P. SIGNATURE ELECTRi Cfih ONTRACTOk 51 )NATURE 3 -9 - 2 2- nAT>E 3 (DATE -S-kga , U.4IE -------- ----