HomeMy WebLinkAboutAPPROVED TRUSS CUTSAlpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 1:
Customer: Central Florida Truss, Inc.Job Number: 21-0688
Job Description: /GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Address: 123 EDEN CREEK LANE, JENSEN BEACH, FL
Job Engineering Criteria:
Design Code: FBC 7th Ed. 2020 Res IntelliVIEW Version: 20.02.01A
JRef #: 1X7T7610019
Wind Standard: ASCE 7-16 Wind Speed (mph): 170 Design Loading (psf): 55.00
Building Type: Closed
This package contains general notes pages, 64 truss drawing(s) and 4 detail(s).
Item Drawing Number Truss Item Drawing Number Truss
1 221.21.1131.13113 FG1 2 221.21.1132.50875 T1
3 221.21.1132.50874 T2 4 221.21.1132.51155 T3
5 221.21.1132.51249 T4 6 221.21.1132.51139 T5
7 221.21.1132.51451 T6 8 221.21.1132.51342 T7
9 221.21.1132.51171 T8 10 221.21.1132.50935 T9
11 221.21.1132.51233 T10 12 221.21.1132.51420 T11
13 221.21.1132.51359 T12 14 221.21.1132.51530 T13
15 221.21.1132.50905 T14 16 221.21.1132.50921 T15
17 221.21.1132.50951 T16 18 221.21.1134.40857 T17
19 221.21.1134.43717 T18 20 221.21.1134.45920 T19
21 221.21.1134.52867 T20 22 221.21.1134.57970 T21
23 221.21.1135.03203 T22 24 221.21.1135.10783 T23
25 221.21.1135.41993 T24 26 221.21.1135.44393 T25
27 221.21.1135.46557 T26 28 221.21.1135.48960 T27
29 221.21.1135.58233 T28 30 221.21.1132.51326 T29
31 221.21.1132.51124 T30 32 221.21.1132.51217 T31
33 221.21.1132.50968 T32 34 221.21.1132.51060 T33
35 221.21.1132.51281 T34 36 221.21.1132.51093 T34A
37 221.21.1132.51545 T35 38 221.21.1132.51514 T36
39 221.21.1132.51468 T37 40 221.21.1132.51312 V1
41 221.21.1132.51014 V2 42 221.21.1131.15033 J1
43 221.21.1131.21090 J1T 44 221.21.1131.23070 J2
45 221.21.1131.32790 J2C 46 221.21.1131.34990 J3
47 221.21.1131.50697 K1 48 221.21.1132.07947 K1T
49 221.21.1132.51296 K2 50 221.21.1132.51404 K2C
51 221.21.1132.51406 K3 52 221.21.1128.30967 C1
Florida Certificate of Product Approval #FL1999 Printed 8/9/2021 12:46:16 PM
08/09/2021
COA #0 278
Alpine, an ITW Company
6750 Forum Drive, Suite 305
Orlando, FL 32821
Phone: (800)755-6001
www.alpineitw.com
Site Information:Page 2:
Customer: Central Florida Truss, Inc.Job Number: 21-0688
Job Description: /GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Address: 123 EDEN CREEK LANE, JENSEN BEACH, FL
Item Drawing Number Truss Item Drawing Number Truss
53 221.21.1128.33357 C1C 54 221.21.1128.55817 C2
55 221.21.1128.58077 C2T 56 221.21.1129.00130 C3
57 221.21.1129.02327 C3T 58 221.21.1129.06433 C4
59 221.21.1129.21740 C4CA 60 221.21.1129.24303 C4CB
61 221.21.1129.26490 C5 62 221.21.1129.31473 C5T
63 221.21.1129.33353 C6 64 221.21.1129.35387 C6T
65 BRCLBSUB0119 66 DEFLCAMB1014
67 VAL180160118 68 VALTN160118
Florida Certificate of Product Approval #FL1999 Printed 8/9/2021 12:46:16 PM
08/09/2021
COA #0 278
General Notes
Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities:
The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1,
Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate
Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design
Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and
dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to
independently verify the accuracy or completeness of the information provided by others and may rely on that information
without liability. The responsibility for verification of that information remains with others neither employed nor controlled
by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page
listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component
designs and not for the technical information furnished by others which technical information and consequences thereof
remain their sole responsibility.
The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in
accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and
loads for each truss component match those required by the plans and by the actual use of the individual component, and
for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any
additional factors required in the particular application. Truss components using metal connector plates with integral teeth
shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to
exceed 19% and/or cause corrosion of connector plates and other metal fasteners.
The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set
forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss
component design loads, inspection of the truss components before or after installation, the design of temporary or
permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear
walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the
foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports,
installation of the truss components, observation of the truss component installation process, review of truss assembly
procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in
the installation of the truss components and/or its connections.
This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic
file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request.
Temporary Lateral Restraint and Bracing:
Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2,
B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or
other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these
drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to
and may not be relied upon for the temporary stability of the truss components during their installation.
Permanent Lateral Restraint and Bracing:
The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of
the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of
BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional.
These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building
stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building
Designer.
Connector Plate Information:
Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations,
gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60.
Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at
www.icc-es.org.
Fire Retardant Treated Lumber:
Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all
stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special
handling care must be taken to prevent breakage during all handling activities.
Page 1 of 3
General Notes (continued)
Key to Terms:
Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed
information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be
found in calculation sheets available upon written request.
BCDL = Bottom Chord standard design Dead Load in pounds per square foot.
BCLL = Bottom Chord standard design Live Load in pounds per square foot.
CL = Certified lumber.
Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot.
FRT = Fire Retardant Treated lumber.
FRT-DB = D-Blaze Fire Retardant Treated lumber.
FRT-DC = Dricon Fire Retardant Treated lumber.
FRT-FP = FirePRO Fire Retardant Treated lumber.
FRT-FL = FlamePRO Fire Retardant Treated lumber.
FRT-FT = FlameTech Fire Retardant Treated lumber.
FRT-PG = PYRO-GUARD Fire Retardant Treated lumber.
g = green lumber.
HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches.
HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep
adjustment.
HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds.
Ic = Incised lumber.
FJ = Finger Jointed lumber.
L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value.
L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the
referenced panel point. Reported as 999 if greater than or equal to 999.
Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection.
Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases.
Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases.
Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases.
NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot.
PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds.
PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds
PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds.
PP = Panel Point.
R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc).
-R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc).
Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the
indicated location (Loc).
RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic)
load cases, at the indicated location (Loc).
Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
identified location (Loc).
TCDL = Top Chord standard design Dead Load in pounds per square foot.
TCLL = Top Chord standard design Live Load in pounds per square foot.
U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the
indicated location (Loc).
VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in
inches.
VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and
maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment.
VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load.
VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment.
W = Width of non-hanger bearing, in inches.
Refer to ASCE-7 for Wind and Seismic abbreviations.
Uppercase Acronyms not explained above are as defined in TPI 1.
Page 2 of 3
References:
1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org.
2. ICC: International Code Council; www.iccsafe.org.
3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO
63045; www.alpineitw.com.
4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org.
5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcindustry.com.
Page 3 of 3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W1,W5 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 90 plf at 0.00 to 90 plf at 8.50
BC: From 10 plf at 0.00 to 10 plf at 8.50
BC: 1410 lb Conc. Load at 1.25
BC: 1378 lb Conc. Load at 3.25, 5.25, 7.25
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Additional Notes
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 3209 /-/-/-/1295 /-
D 3187 /-/-/-/1282 /-
Wind reactions based on MWFRS
F Brg Width = 3.5 Min Req =1.9
D Brg Width = 3.5 Min Req =1.9
Bearings F & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 395 -982
Chords Tens.Comp.
B - C 395 -982
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 458 -1109
A - E 1425 -573
Webs Tens.Comp.
E - C 1425 -573
C - D 458 -1109
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.018 B 999 360
VERT(CL):0.033 B 999 240
HORZ(LL):0.004 A - -
HORZ(TL):0.007 A - -
Creep Factor: 2.0
Max TC CSI:0.223
Max BC CSI:0.821
Max Web CSI:0.322
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:FG1
Ply: 2
Qty:1
SEQN:185927 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T31
DrwNo:221.21.1131.13113
AK /WHK 08/09/2021
2 Complete Trusses Required
W1
W5
8'4"1"
4'3"
4'3"
8'6"
4'3"
4'3"
4'3"
8'6"
4'3"4'10"210'1"
A B C
DEF
4X4
3X8
1.5X4
6X8
4X4
3X8
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x6 SP #2;
Webs: 2x4 SP #2; W1,W5 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @12.00" o.c.
Bot Chord: 2 Rows @ 4.50" o.c. (Each Row)
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 90 plf at 0.00 to 90 plf at 8.50
BC: From 10 plf at 0.00 to 10 plf at 8.50
BC: 1410 lb Conc. Load at 1.25
BC: 1378 lb Conc. Load at 3.25, 5.25, 7.25
Purlins
The TC of this truss shall be braced with attached
spans at 24" oc in lieu of structural sheathing.
Wind
Wind loads and reactions based on MWFRS.
End verticals not exposed to wind pressure.
Additional Notes
Truss must be installed as shown with top chord up.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
F 3209 /-/-/-/1295 /-
D 3187 /-/-/-/1282 /-
Wind reactions based on MWFRS
F Brg Width = 3.5 Min Req =1.9
D Brg Width = 3.5 Min Req =1.9
Bearings F & D are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 395 -982
Chords Tens.Comp.
B - C 395 -982
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - F 458 -1109
A - E 1425 -573
Webs Tens.Comp.
E - C 1425 -573
C - D 458 -1109
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.018 B 999 360
VERT(CL):0.033 B 999 240
HORZ(LL):0.004 A - -
HORZ(TL):0.007 A - -
Creep Factor: 2.0
Max TC CSI:0.223
Max BC CSI:0.821
Max Web CSI:0.322
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:FG1
Ply: 2
Qty:1
SEQN:185927 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T31
DrwNo:221.21.1131.13113
AK /WHK 08/09/2021
2 Complete Trusses Required
W1
W5
8'4"1"
4'3"
4'3"
8'6"
4'3"
4'3"
4'3"
8'6"
4'3"4'10"210'1"
A B C
DEF
4X4
3X8
1.5X4
6X8
4X4
3X8
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3,T5 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x4 SP #2;
Webs: 2x4 SP #2; W5,W13 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 8.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 92 plf at -1.00 to 92 plf at 6.77
TC: From 46 plf at 6.77 to 46 plf at 43.90
TC: From 93 plf at 43.90 to 93 plf at 51.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.80
BC: From 10 plf at 6.80 to 10 plf at 43.86
BC: From 20 plf at 43.86 to 20 plf at 50.67
BC: From 4 plf at 50.67 to 4 plf at 51.67
TC: 647 lb Conc. Load at 6.80,43.86
TC: 285 lb Conc. Load at 7.83, 9.83,11.83,13.83
15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83
31.83,33.83,35.83,37.83,39.83,41.83
BC: 578 lb Conc. Load at 6.80,43.86
BC: 128 lb Conc. Load at 7.83, 9.83,11.83,13.83
15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83
31.83,33.83,35.83,37.83,39.83,41.83
Plating Notes
All plates are 6X8 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 3841 /-/-/-/1605 /-
P 9307 /-/-/-/3961 /-
W 686 /-/-/-/202 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
P Brg Width = 3.5 Min Req =1.8
W Brg Width = 7.6 Min Req =1.5
Bearings B, P, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1690 -4027
C - D 1961 -4665
D - E 1979 -4670
E - F 1465 -3492
F - G 706 -1698
Chords Tens.Comp.
G - H 706 -1698
H - I 996 -430
I - J 4450 -1893
J - K 1610 -643
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 3636 -1520
V - U 3649 -1519
U - T 4718 -1993
T - S 4638 -1971
Chords Tens.Comp.
S - R 3406 -1436
R - Q 333 -788
Q - P 1788 -4221
P - O 683 -1727
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 1194 -519
U - D 334 -518
T - E 469 -121
E - S 638 -1451
S - F 902 -305
F - R 912 -2141
G - R 248 -392
R - H 3049 -1298
Webs Tens.Comp.
H - Q 1009 -2186
Q - I 4073 -1717
I - P 1354 -2990
P - J 1411 -3337
J - O 1241 -415
O - K 788 -1890
N - K 390 -42
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.328 T 999 360
VERT(CL):0.607 T 667 240
HORZ(LL):0.073 R - -
HORZ(TL):0.135 R - -
Creep Factor: 2.0
Max TC CSI:0.655
Max BC CSI:0.914
Max Web CSI:0.972
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T1
Ply: 2
Qty:1
SEQN:185785 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T8
DrwNo:221.21.1132.50875
SSB /WHK 08/09/2021
2 Complete Trusses Required
T3
T5
B3
W5
W13
33'10"4 16'9"12
6'9"4
6'9"4
11'11"10
5'2"6
17'0"8
5'0"14
21'3"2
4'2"10
25'4"
4'0"14
29'4"14
4'0"14
33'7"8
4'2"10
38'8"6
5'0"14
43'10"12
5'2"6
50'8"
6'9"4
6'11"
6'11"
11'8"2
4'9"2
20'11"2
9'3"
25'4"
4'4"14
29'8"14
4'4"14
38'11"14
9'3"
43'9"
4'9"2
50'8"
6'11"1'1'
6"33'4"13'6"108'1"A B
C D E F G H I J K
L M
NOPQRSTUV W
5 12
4X7(B2)
5X8
1.5X4 4X4
5X6
H0615
7X6 1.5X4
5X12
7X6
H0615
5X6
4X4 1.5X4
5X8
4X7(B2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3,T5 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B3 2x4 SP #2;
Webs: 2x4 SP #2; W5,W13 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 8.75" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 92 plf at -1.00 to 92 plf at 6.77
TC: From 46 plf at 6.77 to 46 plf at 43.90
TC: From 93 plf at 43.90 to 93 plf at 51.67
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.80
BC: From 10 plf at 6.80 to 10 plf at 43.86
BC: From 20 plf at 43.86 to 20 plf at 50.67
BC: From 4 plf at 50.67 to 4 plf at 51.67
TC: 647 lb Conc. Load at 6.80,43.86
TC: 285 lb Conc. Load at 7.83, 9.83,11.83,13.83
15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83
31.83,33.83,35.83,37.83,39.83,41.83
BC: 578 lb Conc. Load at 6.80,43.86
BC: 128 lb Conc. Load at 7.83, 9.83,11.83,13.83
15.83,17.83,19.83,21.83,23.83,25.83,27.83,29.83
31.83,33.83,35.83,37.83,39.83,41.83
Plating Notes
All plates are 6X8 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 3841 /-/-/-/1605 /-
P 9307 /-/-/-/3961 /-
W 686 /-/-/-/202 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.6
P Brg Width = 3.5 Min Req =1.8
W Brg Width = 7.6 Min Req =1.5
Bearings B, P, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1690 -4027
C - D 1961 -4665
D - E 1979 -4670
E - F 1465 -3492
F - G 706 -1698
Chords Tens.Comp.
G - H 706 -1698
H - I 996 -430
I - J 4450 -1893
J - K 1610 -643
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - V 3636 -1520
V - U 3649 -1519
U - T 4718 -1993
T - S 4638 -1971
Chords Tens.Comp.
S - R 3406 -1436
R - Q 333 -788
Q - P 1788 -4221
P - O 683 -1727
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 1194 -519
U - D 334 -518
T - E 469 -121
E - S 638 -1451
S - F 902 -305
F - R 912 -2141
G - R 248 -392
R - H 3049 -1298
Webs Tens.Comp.
H - Q 1009 -2186
Q - I 4073 -1717
I - P 1354 -2990
P - J 1411 -3337
J - O 1241 -415
O - K 788 -1890
N - K 390 -42
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.328 T 999 360
VERT(CL):0.607 T 667 240
HORZ(LL):0.073 R - -
HORZ(TL):0.135 R - -
Creep Factor: 2.0
Max TC CSI:0.655
Max BC CSI:0.914
Max Web CSI:0.972
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T1
Ply: 2
Qty:1
SEQN:185785 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T8
DrwNo:221.21.1132.50875
SSB /WHK 08/09/2021
2 Complete Trusses Required
T3
T5
B3
W5
W13
33'10"4 16'9"12
6'9"4
6'9"4
11'11"10
5'2"6
17'0"8
5'0"14
21'3"2
4'2"10
25'4"
4'0"14
29'4"14
4'0"14
33'7"8
4'2"10
38'8"6
5'0"14
43'10"12
5'2"6
50'8"
6'9"4
6'11"
6'11"
11'8"2
4'9"2
20'11"2
9'3"
25'4"
4'4"14
29'8"14
4'4"14
38'11"14
9'3"
43'9"
4'9"2
50'8"
6'11"1'1'
6"33'4"13'6"108'1"A B
C D E F G H I J K
L M
NOPQRSTUV W
5 12
4X7(B2)
5X8
1.5X4 4X4
5X6
H0615
7X6 1.5X4
5X12
7X6
H0615
5X6
4X4 1.5X4
5X8
4X7(B2)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2,T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1712 /-/-/992 /657 /200
Q 3812 /-/-/1743 /1526 /-
U 701 /-119 /-/407 /185 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =1.5
U Brg Width = 7.6 Min Req =1.5
Bearings B, Q, & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1256 -3168
C - D 1087 -2797
D - E 1061 -2545
E - F 1227 -2986
F - G 1227 -2986
G - H 482 -1250
Chords Tens.Comp.
H - I 482 -1250
I - J 2881 -1072
J - K 2881 -1072
K - L 848 -259
L - M 919 -371
M - N 681 -869
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2815 -1060
T - S 2951 -1010
S - R 2329 -736
Chords Tens.Comp.
R - Q 395 -648
Q - P 712 -1675
P - N 732 -584
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - T 621 -183
T - E 341 -566
S - G 912 -334
G - R 667 -1492
H - R 219 -387
R - I 2328 -861
Webs Tens.Comp.
I - Q 1220 -2971
J - Q 222 -397
Q - K 827 -1982
K - P 1418 -514
P - L 270 -535
P - M 366 -566
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.202 F 999 360
VERT(CL):0.391 F 999 240
HORZ(LL):0.052 R - -
HORZ(TL):0.101 R - -
Creep Factor: 2.0
Max TC CSI:0.927
Max BC CSI:0.972
Max Web CSI:0.864
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T2
Ply: 1
Qty:1
SEQN:185870 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T2
DrwNo:221.21.1132.50874
SSB /WHK 08/09/2021
T2 T3
B2
33'10"4 16'9"12
4'5"15
4'5"15
8'9"4
4'3"5
12'10"6
4'1"2
16'9"12
3'11"6
21'0"14
4'3"2
25'4"
4'3"2
29'7"2
4'3"2
33'10"4
4'3"2
37'9"10
3'11"6
41'10"12
4'1"2
46'2"1
4'3"5
50'8"
4'5"15
8'11"
8'11"
25'4"
16'5"
41'9"
16'5"
50'8"
8'11"1'1'
6"34'2"14'4"10(a)(a)
8'1"A B
C
D E F G H I J K L
M
N O
PQRST U
5 12
4X6(B2)
1.5X4
5X6
4X8
4X5 1.5X4
7X8
4X8 5X8
5X10
4X8 1.5X4
7X8
4X5
4X8
5X6
1.5X4
4X6(B2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T2,T3 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1712 /-/-/992 /657 /200
Q 3812 /-/-/1743 /1526 /-
U 701 /-119 /-/407 /185 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =1.5
U Brg Width = 7.6 Min Req =1.5
Bearings B, Q, & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1256 -3168
C - D 1087 -2797
D - E 1061 -2545
E - F 1227 -2986
F - G 1227 -2986
G - H 482 -1250
Chords Tens.Comp.
H - I 482 -1250
I - J 2881 -1072
J - K 2881 -1072
K - L 848 -259
L - M 919 -371
M - N 681 -869
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2815 -1060
T - S 2951 -1010
S - R 2329 -736
Chords Tens.Comp.
R - Q 395 -648
Q - P 712 -1675
P - N 732 -584
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
D - T 621 -183
T - E 341 -566
S - G 912 -334
G - R 667 -1492
H - R 219 -387
R - I 2328 -861
Webs Tens.Comp.
I - Q 1220 -2971
J - Q 222 -397
Q - K 827 -1982
K - P 1418 -514
P - L 270 -535
P - M 366 -566
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.202 F 999 360
VERT(CL):0.391 F 999 240
HORZ(LL):0.052 R - -
HORZ(TL):0.101 R - -
Creep Factor: 2.0
Max TC CSI:0.927
Max BC CSI:0.972
Max Web CSI:0.864
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T2
Ply: 1
Qty:1
SEQN:185870 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T2
DrwNo:221.21.1132.50874
SSB /WHK 08/09/2021
T2 T3
B2
33'10"4 16'9"12
4'5"15
4'5"15
8'9"4
4'3"5
12'10"6
4'1"2
16'9"12
3'11"6
21'0"14
4'3"2
25'4"
4'3"2
29'7"2
4'3"2
33'10"4
4'3"2
37'9"10
3'11"6
41'10"12
4'1"2
46'2"1
4'3"5
50'8"
4'5"15
8'11"
8'11"
25'4"
16'5"
41'9"
16'5"
50'8"
8'11"1'1'
6"34'2"14'4"10(a)(a)
8'1"A B
C
D E F G H I J K L
M
N O
PQRST U
5 12
4X6(B2)
1.5X4
5X6
4X8
4X5 1.5X4
7X8
4X8 5X8
5X10
4X8 1.5X4
7X8
4X5
4X8
5X6
1.5X4
4X6(B2)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1700 /-/-/1007 /656 /238
O 3869 /-/-/1787 /1523 /-
T 662 /-143 /-/405 /215 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
O Brg Width = 3.5 Min Req =1.5
T Brg Width = 7.6 Min Req =1.5
Bearings B, O, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1188 -3094
C - D 1048 -2578
D - E 1056 -2410
E - F 1056 -2409
F - G 380 -856
Chords Tens.Comp.
G - H 2470 -814
H - I 2470 -814
I - J 1158 -252
J - K 723 -764
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 2748 -992
S - R 2748 -995
R - Q 2304 -736
Q - P 1896 -582
Chords Tens.Comp.
P - O 325 -563
O - N 464 -1049
N - M 620 -629
M - K 624 -624
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 290 -504
D - R 376 -73
E - Q 257 -419
Q - F 788 -267
F - P 740 -1611
P - G 1857 -623
Webs Tens.Comp.
G - O 1133 -2781
H - O 287 -499
O - I 803 -2099
I - N 520 -156
N - J 452 -876
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.164 E 999 360
VERT(CL):0.321 E 999 240
HORZ(LL):0.044 P - -
HORZ(TL):0.087 P - -
Creep Factor: 2.0
Max TC CSI:0.885
Max BC CSI:0.906
Max Web CSI:0.857
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T3
Ply: 1
Qty:1
SEQN:185877 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T3
DrwNo:221.21.1132.51155
SSB /WHK 08/09/2021
T3 T4
B2
33'10"4 16'9"12
5'7"11
5'7"11
10'9"4
5'1"9
16'9"12
6'0"8
21'1"12
4'4"
29'6"4
8'4"8
33'10"4
4'4"
39'10"12
6'0"8
45'0"5
5'1"9
50'8"
5'7"11
5'5"15
5'5"15
10'9"4
5'3"5
25'4"
14'6"12
39'10"12
14'6"12
45'2"1
5'3"5
50'8"
5'5"151'
1'
6"35'0"15'2"10(a)(a)(a)
8'1"A B
C
D E F G H I
J
K L
MNOPQRS T
5
12
4X6(B2)1.5X4
3X4
5X8
3X4
1.5X4
7X8
H0610
4X6
H0610 1.5X4
7X8
5X8
3X4
3X4
1.5X4 4X6(B2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E; B2 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1700 /-/-/1007 /656 /238
O 3869 /-/-/1787 /1523 /-
T 662 /-143 /-/405 /215 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
O Brg Width = 3.5 Min Req =1.5
T Brg Width = 7.6 Min Req =1.5
Bearings B, O, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1188 -3094
C - D 1048 -2578
D - E 1056 -2410
E - F 1056 -2409
F - G 380 -856
Chords Tens.Comp.
G - H 2470 -814
H - I 2470 -814
I - J 1158 -252
J - K 723 -764
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 2748 -992
S - R 2748 -995
R - Q 2304 -736
Q - P 1896 -582
Chords Tens.Comp.
P - O 325 -563
O - N 464 -1049
N - M 620 -629
M - K 624 -624
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 290 -504
D - R 376 -73
E - Q 257 -419
Q - F 788 -267
F - P 740 -1611
P - G 1857 -623
Webs Tens.Comp.
G - O 1133 -2781
H - O 287 -499
O - I 803 -2099
I - N 520 -156
N - J 452 -876
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.164 E 999 360
VERT(CL):0.321 E 999 240
HORZ(LL):0.044 P - -
HORZ(TL):0.087 P - -
Creep Factor: 2.0
Max TC CSI:0.885
Max BC CSI:0.906
Max Web CSI:0.857
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T3
Ply: 1
Qty:1
SEQN:185877 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T3
DrwNo:221.21.1132.51155
SSB /WHK 08/09/2021
T3 T4
B2
33'10"4 16'9"12
5'7"11
5'7"11
10'9"4
5'1"9
16'9"12
6'0"8
21'1"12
4'4"
29'6"4
8'4"8
33'10"4
4'4"
39'10"12
6'0"8
45'0"5
5'1"9
50'8"
5'7"11
5'5"15
5'5"15
10'9"4
5'3"5
25'4"
14'6"12
39'10"12
14'6"12
45'2"1
5'3"5
50'8"
5'5"151'
1'
6"35'0"15'2"10(a)(a)(a)
8'1"A B
C
D E F G H I
J
K L
MNOPQRS T
5
12
4X6(B2)1.5X4
3X4
5X8
3X4
1.5X4
7X8
H0610
4X6
H0610 1.5X4
7X8
5X8
3X4
3X4
1.5X4 4X6(B2)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B1,B6 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1704 /-/-/1031 /660 /275
P 3854 /-/-/1787 /1508 /-
U 667 /-134 /-/431 /239 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =1.5
U Brg Width = 7.6 Min Req =1.5
Bearings B, P, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1191 -3101
C - D 973 -2342
D - E 945 -2038
E - F 945 -2038
F - G 445 -844
Chords Tens.Comp.
G - H 445 -844
H - I 2075 -622
I - J 2075 -623
J - K 1285 -323
K - L 767 -716
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2748 -985
T - S 2746 -988
S - R 2058 -621
R - Q 1591 -441
Chords Tens.Comp.
Q - P 339 -528
P - O 570 -1163
O - N 564 -663
N - L 568 -658
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 408 -772
D - S 397 -121
R - F 763 -264
F - Q 551 -1263
Q - H 2001 -727
G - Q 224 -396
Webs Tens.Comp.
H - P 1009 -2500
I - P 251 -450
P - J 658 -1728
J - O 596 -205
O - K 539 -1075
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.154 S 999 360
VERT(CL):0.299 S 999 240
HORZ(LL):0.044 Q - -
HORZ(TL):0.086 Q - -
Creep Factor: 2.0
Max TC CSI:0.914
Max BC CSI:0.867
Max Web CSI:0.920
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T4
Ply: 1
Qty:1
SEQN:185883 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T4
DrwNo:221.21.1132.51249
SSB /WHK 08/09/2021
T5
B1 B6
33'10"4 16'9"12
6'7"11
6'7"11
12'9"4
6'1"9
16'9"12
4'0"8
21'0"14
4'3"2
25'4"
4'3"2
29'7"2
4'3"2
33'10"4
4'3"2
37'10"12
4'0"8
44'0"5
6'1"9
50'8"
6'7"11
6'5"15
6'5"15
12'9"4
6'3"5
25'4"
12'6"12
37'10"12
12'6"12
44'2"1
6'3"5
50'8"
6'5"151'1'
6"35'10"16'0"10(a)(a)(a)
8'1"A B
C
D E F G H I J
K
L M
NOPQRST U
5
12
4X6(B2)
1.5X4
3X4
5X8
5X6
1.5X4
6X8
6X6 1.5X4
6X8
6X6 1.5X4
6X8
5X8
5X6
3X4
1.5X4 4X6(B2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T5 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B1,B6 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1704 /-/-/1031 /660 /275
P 3854 /-/-/1787 /1508 /-
U 667 /-134 /-/431 /239 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =1.5
U Brg Width = 7.6 Min Req =1.5
Bearings B, P, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1191 -3101
C - D 973 -2342
D - E 945 -2038
E - F 945 -2038
F - G 445 -844
Chords Tens.Comp.
G - H 445 -844
H - I 2075 -622
I - J 2075 -623
J - K 1285 -323
K - L 767 -716
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2748 -985
T - S 2746 -988
S - R 2058 -621
R - Q 1591 -441
Chords Tens.Comp.
Q - P 339 -528
P - O 570 -1163
O - N 564 -663
N - L 568 -658
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 408 -772
D - S 397 -121
R - F 763 -264
F - Q 551 -1263
Q - H 2001 -727
G - Q 224 -396
Webs Tens.Comp.
H - P 1009 -2500
I - P 251 -450
P - J 658 -1728
J - O 596 -205
O - K 539 -1075
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.154 S 999 360
VERT(CL):0.299 S 999 240
HORZ(LL):0.044 Q - -
HORZ(TL):0.086 Q - -
Creep Factor: 2.0
Max TC CSI:0.914
Max BC CSI:0.867
Max Web CSI:0.920
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T4
Ply: 1
Qty:1
SEQN:185883 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T4
DrwNo:221.21.1132.51249
SSB /WHK 08/09/2021
T5
B1 B6
33'10"4 16'9"12
6'7"11
6'7"11
12'9"4
6'1"9
16'9"12
4'0"8
21'0"14
4'3"2
25'4"
4'3"2
29'7"2
4'3"2
33'10"4
4'3"2
37'10"12
4'0"8
44'0"5
6'1"9
50'8"
6'7"11
6'5"15
6'5"15
12'9"4
6'3"5
25'4"
12'6"12
37'10"12
12'6"12
44'2"1
6'3"5
50'8"
6'5"151'1'
6"35'10"16'0"10(a)(a)(a)
8'1"A B
C
D E F G H I J
K
L M
NOPQRST U
5
12
4X6(B2)
1.5X4
3X4
5X8
5X6
1.5X4
6X8
6X6 1.5X4
6X8
6X6 1.5X4
6X8
5X8
5X6
3X4
1.5X4 4X6(B2)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
(b) 2x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 10d Box or Gun (0.128"x3",min.)nails @ 6" oc. or
(1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 442 /-17 /-/191 /150 /312
X 2353 /-/-/1410 /848 /-
R 2743 /-/-/1448 /1066 /-
Z 707 /-/-/495 /247 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
X Brg Width = 3.5 Min Req =2.4
R Brg Width = 3.5 Min Req =2.9
Z Brg Width = 7.6 Min Req =1.5
Bearings B, X, R, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 422 -286
C - D 970 -225
D - E 269 -521
E - F 289 -409
F - G 613 -1288
Chords Tens.Comp.
G - H 398 -872
H - I 1246 -357
I - J 1300 -374
J - K 1308 -424
K - L 236 -739
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - T 558 -124
T - S 1312 -243
S - R 844 -185
Chords Tens.Comp.
R - O 729 -1205
N - L 579 -131
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 368 -758
X - D 535 -1501
X - V 398 -890
D - V 1293 -307
V - F 374 -898
F - T 931 -292
Webs Tens.Comp.
G - S 288 -693
S - H 489 -93
H - R 896 -2215
R - I 380 -938
O - N 591 -134
O - K 789 -1507
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 G 999 360
VERT(CL):0.119 G 999 240
HORZ(LL):0.030 N - -
HORZ(TL):0.055 N - -
Creep Factor: 2.0
Max TC CSI:0.885
Max BC CSI:0.562
Max Web CSI:0.842
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T5
Ply: 1
Qty:1
SEQN:185894 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T16
DrwNo:221.21.1132.51139
SSB /WHK 08/09/2021
T3
T4
9'10"4 25'6"15'3"12
5'3"1
5'3"1
10'
4'8"15
14'9"4
4'9"4
21'8"12
6'11"8
28'8"4
6'11"8
35'10"12
7'2"8
43'0"15
7'2"3
50'8"
7'7"1
5'1"5
5'1"5
9'10"4
4'8"15
14'5"8
4'7"4
21'5"4
6'11"12
28'4"12
6'11"8
36'
7'7"4
43'0"15
7'0"15
50'8"
7'7"11'1'
6"32'6'8"16'10"10(a)(b)
(a)
8'1"
10'1"
A B
C
D
E F G H IJ
K
L M
N
O
PQ
RST
U
V
WXY Z
5
12
3X5(B1)1.5X4 3X8
3X6
1.5X4
6X81.5X4
5X6
5X6
7X6
3X6
5X6
5X81.5X4
1.5X4(**)
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3,T4 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
(b) 2x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 10d Box or Gun (0.128"x3",min.)nails @ 6" oc. or
(1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 442 /-17 /-/191 /150 /312
X 2353 /-/-/1410 /848 /-
R 2743 /-/-/1448 /1066 /-
Z 707 /-/-/495 /247 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
X Brg Width = 3.5 Min Req =2.4
R Brg Width = 3.5 Min Req =2.9
Z Brg Width = 7.6 Min Req =1.5
Bearings B, X, R, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 422 -286
C - D 970 -225
D - E 269 -521
E - F 289 -409
F - G 613 -1288
Chords Tens.Comp.
G - H 398 -872
H - I 1246 -357
I - J 1300 -374
J - K 1308 -424
K - L 236 -739
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
V - T 558 -124
T - S 1312 -243
S - R 844 -185
Chords Tens.Comp.
R - O 729 -1205
N - L 579 -131
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 368 -758
X - D 535 -1501
X - V 398 -890
D - V 1293 -307
V - F 374 -898
F - T 931 -292
Webs Tens.Comp.
G - S 288 -693
S - H 489 -93
H - R 896 -2215
R - I 380 -938
O - N 591 -134
O - K 789 -1507
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 G 999 360
VERT(CL):0.119 G 999 240
HORZ(LL):0.030 N - -
HORZ(TL):0.055 N - -
Creep Factor: 2.0
Max TC CSI:0.885
Max BC CSI:0.562
Max Web CSI:0.842
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T5
Ply: 1
Qty:1
SEQN:185894 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T16
DrwNo:221.21.1132.51139
SSB /WHK 08/09/2021
T3
T4
9'10"4 25'6"15'3"12
5'3"1
5'3"1
10'
4'8"15
14'9"4
4'9"4
21'8"12
6'11"8
28'8"4
6'11"8
35'10"12
7'2"8
43'0"15
7'2"3
50'8"
7'7"1
5'1"5
5'1"5
9'10"4
4'8"15
14'5"8
4'7"4
21'5"4
6'11"12
28'4"12
6'11"8
36'
7'7"4
43'0"15
7'0"15
50'8"
7'7"11'1'
6"32'6'8"16'10"10(a)(b)
(a)
8'1"
10'1"
A B
C
D
E F G H IJ
K
L M
N
O
PQ
RST
U
V
WXY Z
5
12
3X5(B1)1.5X4 3X8
3X6
1.5X4
6X81.5X4
5X6
5X6
7X6
3X6
5X6
5X81.5X4
1.5X4(**)
3X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 453 /-/-/192 /152 /350
AA 2390 /-/-/1469 /895 /-
S 2487 /-/-/1344 /938 /-
AC 811 /-/-/578 /323 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
AA Brg Width = 3.5 Min Req =2.4
S Brg Width = 3.5 Min Req =2.6
AC Brg Width = 7.6 Min Req =1.5
Bearings B, AA, S, & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 376 -307
C - D 892 -248
D - E 333 -698
E - F 519 -989
F - G 675 -1290
Chords Tens.Comp.
G - H 567 -1042
H - I 567 -1042
J - K 540 0
K - L 660 -96
L - M 380 -963
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - W 591 -184
W -V 877 -169
V - U 1306 -244
Chords Tens.Comp.
T - S 419 -540
S - P 410 -562
O - M 778 -231
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AA 362 -740
AA- D 591 -1583
AA- Y 387 -811
D - Y 1370 -361
Y - E 368 -936
E - W 623 -168
F - W 177 -462
F - V 600 -221
G - U 165 -447
Webs Tens.Comp.
H - U 303 -535
U - I 1438 -549
I - T 527 -1394
T - J 1477 -484
J - S 331 -1384
S - K 422 -892
P - O 802 -243
P - L 619 -1189
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 G 999 360
VERT(CL):0.109 G 999 240
HORZ(LL):0.022 O - -
HORZ(TL):0.040 O - -
Creep Factor: 2.0
Max TC CSI:0.937
Max BC CSI:0.542
Max Web CSI:0.664
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T6
Ply: 1
Qty:1
SEQN:185891 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T7
DrwNo:221.21.1132.51451
SSB /WHK 08/09/2021
9'10"4 25'6"15'3"12
5'2"11
5'2"11
10'
4'9"5
14'2"
4'2"
16'9"4
2'7"4
22'8"1
5'10"13
28'1"11
5'5"9
33'10"12
5'9"1
35'2"8
1'3"12
36'
9"8
43'0"15
7'0"15
50'8"
7'7"1
5'1"5
5'1"5
9'10"4
4'8"15
14'5"8
4'7"4
16'9"4
2'3"12
22'4"9
5'7"5
28'1"11
5'9"1
33'11"4
5'9"9
36'
2'0"12
43'0"15
7'0"15
50'8"
7'7"11'1'
6"32'7'6"17'8"10(a)
8'1"
10'1"
A B
C
D
E
F G H I J K
L
M N
O
P
QR
STUVW
X
Y
ZAAAB AC
5
12
3X5(B1)1.5X4
5X6
3X8
3X6
6X81.5X4
5X8
5X6
1.5X4
4X8
5X8
3X8
4X5
5X81.5X4
7X6
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 453 /-/-/192 /152 /350
AA 2390 /-/-/1469 /895 /-
S 2487 /-/-/1344 /938 /-
AC 811 /-/-/578 /323 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
AA Brg Width = 3.5 Min Req =2.4
S Brg Width = 3.5 Min Req =2.6
AC Brg Width = 7.6 Min Req =1.5
Bearings B, AA, S, & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 376 -307
C - D 892 -248
D - E 333 -698
E - F 519 -989
F - G 675 -1290
Chords Tens.Comp.
G - H 567 -1042
H - I 567 -1042
J - K 540 0
K - L 660 -96
L - M 380 -963
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
Y - W 591 -184
W -V 877 -169
V - U 1306 -244
Chords Tens.Comp.
T - S 419 -540
S - P 410 -562
O - M 778 -231
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AA 362 -740
AA- D 591 -1583
AA- Y 387 -811
D - Y 1370 -361
Y - E 368 -936
E - W 623 -168
F - W 177 -462
F - V 600 -221
G - U 165 -447
Webs Tens.Comp.
H - U 303 -535
U - I 1438 -549
I - T 527 -1394
T - J 1477 -484
J - S 331 -1384
S - K 422 -892
P - O 802 -243
P - L 619 -1189
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 G 999 360
VERT(CL):0.109 G 999 240
HORZ(LL):0.022 O - -
HORZ(TL):0.040 O - -
Creep Factor: 2.0
Max TC CSI:0.937
Max BC CSI:0.542
Max Web CSI:0.664
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T6
Ply: 1
Qty:1
SEQN:185891 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T7
DrwNo:221.21.1132.51451
SSB /WHK 08/09/2021
9'10"4 25'6"15'3"12
5'2"11
5'2"11
10'
4'9"5
14'2"
4'2"
16'9"4
2'7"4
22'8"1
5'10"13
28'1"11
5'5"9
33'10"12
5'9"1
35'2"8
1'3"12
36'
9"8
43'0"15
7'0"15
50'8"
7'7"1
5'1"5
5'1"5
9'10"4
4'8"15
14'5"8
4'7"4
16'9"4
2'3"12
22'4"9
5'7"5
28'1"11
5'9"1
33'11"4
5'9"9
36'
2'0"12
43'0"15
7'0"15
50'8"
7'7"11'1'
6"32'7'6"17'8"10(a)
8'1"
10'1"
A B
C
D
E
F G H I J K
L
M N
O
P
QR
STUVW
X
Y
ZAAAB AC
5
12
3X5(B1)1.5X4
5X6
3X8
3X6
6X81.5X4
5X8
5X6
1.5X4
4X8
5X8
3X8
4X5
5X81.5X4
7X6
3X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 627 /-/-/305 /293 /387
X 1968 /-/0 /1324 /698 /0
R 2587 /-/-/1426 /985 /-
Z 809 /-/-/581 /329 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
X Brg Width = 3.5 Min Req =2.3
R Brg Width = 3.5 Min Req =2.7
Z Brg Width = 7.6 Min Req =1.5
Bearings B, X, R, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 372 -698
C - D 439 -328
D - E 419 -283
E - F 732 -1490
F - G 731 -1325
Chords Tens.Comp.
G - H 731 -1325
H - I 363 -577
I - J 533 0
J - K 645 -76
K - L 393 -960
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 564 -251
Y - X 560 -253
W -U 1171 -314
U - T 1308 -235
Chords Tens.Comp.
T - S 495 -96
S - R 399 -531
R - O 384 -533
N - L 775 -243
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 314 -675
X - W 570 -1615
D - W 285 -442
W -E 465 -1634
T - H 1188 -476
G - T 374 -662
Webs Tens.Comp.
H - S 449 -1128
S - I 1518 -488
I - R 417 -1517
R - J 446 -949
O - N 799 -255
O - K 611 -1184
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 G 999 360
VERT(CL):0.107 G 999 240
HORZ(LL):0.017 N - -
HORZ(TL):0.034 N - -
Creep Factor: 2.0
Max TC CSI:0.933
Max BC CSI:0.785
Max Web CSI:0.722
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T7
Ply: 1
Qty:1
SEQN:185861 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T5
DrwNo:221.21.1132.51342
SSB /WHK 08/09/2021
9'10"4 25'6"15'3"12
5'2"11
5'2"11
9'10"4
4'7"9
14'4"10
4'6"6
18'9"4
4'4"10
25'4"
6'6"12
31'10"12
6'6"12
35'2"8
3'3"12
36'
9"8
43'0"15
7'0"15
50'8"
7'7"1
5'1"5
5'1"5
10'1"8
5'0"3
18'9"4
8'7"12
25'4"
6'6"12
31'10"12
6'6"12
36'
4'1"4
43'0"15
7'0"15
50'8"
7'7"11'1'
6"32'8'4"18'6"10(a)
(a)
(a)
8'1"
10'1"
A B
C
D
E
F G H
I J
K
L M
N
O
PQ
RSTU
V
W
XY Z
5 12
3X5(B1)
5X6
6X65X5
4X4
5X8
3X4 5X8
5X8
4X5
4X5
3X4
3X4
5X8 3X4
7X6
3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
WARNING: Furnish a copy of this DWG to the
installation contractor. Special care must be taken
during handling, shipping and installation of trusses.
See "W ARNING" note below.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 627 /-/-/305 /293 /387
X 1968 /-/0 /1324 /698 /0
R 2587 /-/-/1426 /985 /-
Z 809 /-/-/581 /329 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
X Brg Width = 3.5 Min Req =2.3
R Brg Width = 3.5 Min Req =2.7
Z Brg Width = 7.6 Min Req =1.5
Bearings B, X, R, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 372 -698
C - D 439 -328
D - E 419 -283
E - F 732 -1490
F - G 731 -1325
Chords Tens.Comp.
G - H 731 -1325
H - I 363 -577
I - J 533 0
J - K 645 -76
K - L 393 -960
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 564 -251
Y - X 560 -253
W -U 1171 -314
U - T 1308 -235
Chords Tens.Comp.
T - S 495 -96
S - R 399 -531
R - O 384 -533
N - L 775 -243
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 314 -675
X - W 570 -1615
D - W 285 -442
W -E 465 -1634
T - H 1188 -476
G - T 374 -662
Webs Tens.Comp.
H - S 449 -1128
S - I 1518 -488
I - R 417 -1517
R - J 446 -949
O - N 799 -255
O - K 611 -1184
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 5.07 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 G 999 360
VERT(CL):0.107 G 999 240
HORZ(LL):0.017 N - -
HORZ(TL):0.034 N - -
Creep Factor: 2.0
Max TC CSI:0.933
Max BC CSI:0.785
Max Web CSI:0.722
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T7
Ply: 1
Qty:1
SEQN:185861 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T5
DrwNo:221.21.1132.51342
SSB /WHK 08/09/2021
9'10"4 25'6"15'3"12
5'2"11
5'2"11
9'10"4
4'7"9
14'4"10
4'6"6
18'9"4
4'4"10
25'4"
6'6"12
31'10"12
6'6"12
35'2"8
3'3"12
36'
9"8
43'0"15
7'0"15
50'8"
7'7"1
5'1"5
5'1"5
10'1"8
5'0"3
18'9"4
8'7"12
25'4"
6'6"12
31'10"12
6'6"12
36'
4'1"4
43'0"15
7'0"15
50'8"
7'7"11'1'
6"32'8'4"18'6"10(a)
(a)
(a)
8'1"
10'1"
A B
C
D
E
F G H
I J
K
L M
N
O
PQ
RSTU
V
W
XY Z
5 12
3X5(B1)
5X6
6X65X5
4X4
5X8
3X4 5X8
5X8
4X5
4X5
3X4
3X4
5X8 3X4
7X6
3X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 612 /-/-/324 /106 /410
W 2069 /-/0 /1285 /923 /0
L 1410 /-/-/683 /555 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
W Brg Width = 3.5 Min Req =2.4
L Brg Width = -Min Req =-
Bearings B & W are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 21 -667
D - E 389 -1265
E - F 471 -1333
F - G 710 -1724
Chords Tens.Comp.
G - H 691 -1466
H - I 691 -1466
I - J 494 -992
J - K 415 -1008
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 535 -258
X - W 532 -259
S - Q 1684 -720
Chords Tens.Comp.
Q - P 1514 -569
P - M 1029 -394
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 359 -691
W -V 777 -1707
V - D 753 -1629
D - S 1480 -602
S - F 326 -724
Webs Tens.Comp.
H - P 261 -452
P - I 729 -275
I - M 222 -494
M - K 1238 -478
K - L 566 -1374
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 Q 999 360
VERT(CL):0.111 Q 999 240
HORZ(LL):0.026 L - -
HORZ(TL):0.050 L - -
Creep Factor: 2.0
Max TC CSI:0.400
Max BC CSI:0.852
Max Web CSI:0.548
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T8
Ply: 1
Qty:1
SEQN:185857 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T18
DrwNo:221.21.1132.51171
SSB /WHK 08/09/2021
9'10"4 25'4"4
5'2"11
5'2"11
10'
4'9"5
11'9"2
1'9"2
16'4"1
4'6"15
20'9"4
4'5"3
25'5"12
4'8"8
29'10"12
4'5"
31'7"12
1'9"
35'2"8
3'6"12
5'1"5
5'1"5
10'1"8
5'0"3
12'2"6
2'0"14
20'9"4
8'6"14
25'5"12
4'8"8
31'6"
6'0"4
35'2"8
3'8"81'
6"3 2'4'11"83'9'2"19'4"108'1"
10'1"
A B
C
D
E
F
G H I
J
K
L
MNOPQ
RST
U
V
WX
5
12
3X4(B1)
5X5
6X65X5
4X5
6X8
3X4
5X8
5X5 3X8
5X5
6X8
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 612 /-/-/324 /106 /410
W 2069 /-/0 /1285 /923 /0
L 1410 /-/-/683 /555 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
W Brg Width = 3.5 Min Req =2.4
L Brg Width = -Min Req =-
Bearings B & W are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 21 -667
D - E 389 -1265
E - F 471 -1333
F - G 710 -1724
Chords Tens.Comp.
G - H 691 -1466
H - I 691 -1466
I - J 494 -992
J - K 415 -1008
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 535 -258
X - W 532 -259
S - Q 1684 -720
Chords Tens.Comp.
Q - P 1514 -569
P - M 1029 -394
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 359 -691
W -V 777 -1707
V - D 753 -1629
D - S 1480 -602
S - F 326 -724
Webs Tens.Comp.
H - P 261 -452
P - I 729 -275
I - M 222 -494
M - K 1238 -478
K - L 566 -1374
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 Q 999 360
VERT(CL):0.111 Q 999 240
HORZ(LL):0.026 L - -
HORZ(TL):0.050 L - -
Creep Factor: 2.0
Max TC CSI:0.400
Max BC CSI:0.852
Max Web CSI:0.548
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T8
Ply: 1
Qty:1
SEQN:185857 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T18
DrwNo:221.21.1132.51171
SSB /WHK 08/09/2021
9'10"4 25'4"4
5'2"11
5'2"11
10'
4'9"5
11'9"2
1'9"2
16'4"1
4'6"15
20'9"4
4'5"3
25'5"12
4'8"8
29'10"12
4'5"
31'7"12
1'9"
35'2"8
3'6"12
5'1"5
5'1"5
10'1"8
5'0"3
12'2"6
2'0"14
20'9"4
8'6"14
25'5"12
4'8"8
31'6"
6'0"4
35'2"8
3'8"81'
6"3 2'4'11"83'9'2"19'4"108'1"
10'1"
A B
C
D
E
F
G H I
J
K
L
MNOPQ
RST
U
V
WX
5
12
3X4(B1)
5X5
6X65X5
4X5
6X8
3X4
5X8
5X5 3X8
5X5
6X8
4X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 480 /-/-/357 /209 /403
V 2298 /-/-/1600 /952 /-
L 1378 /-/-/673 /540 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
V Brg Width = 7.6 Min Req =2.7
L Brg Width = -Min Req =-
Bearings B & V are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 421 -691
C - D 847 -498
D - E 1053 -532
E - F 231 -893
F - G 657 -1780
Chords Tens.Comp.
G - H 651 -1500
H - I 570 -1086
I - J 574 -1240
J - K 407 -987
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 700 -444
Y - X 638 -377
W -V 257 -808
T - R 853 -365
Chords Tens.Comp.
R - Q 1566 -632
Q - P 1292 -473
P - M 877 -340
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 426 -1017
D - V 227 -503
V - E 578 -1367
V - T 376 -1067
E - T 1718 -751
Webs Tens.Comp.
T - F 507 -1133
F - R 905 -278
J - M 340 -743
M - K 1205 -466
K - L 552 -1340
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.052 Q 999 360
VERT(CL):0.102 Q 999 240
HORZ(LL):0.026 L - -
HORZ(TL):0.053 L - -
Creep Factor: 2.0
Max TC CSI:0.487
Max BC CSI:0.428
Max Web CSI:0.534
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T9
Ply: 1
Qty:1
SEQN:185853 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T6
DrwNo:221.21.1132.50935
SSB /WHK 08/09/2021
9'5"13 25'8"11
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
11'10"14
2'3"11
17'5"13
5'6"15
22'9"4
5'3"7
27'10"12
5'1"8
31'6"
3'7"4
35'2"8
3'8"8
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
17'2"5
4'11"15
22'9"4
5'6"15
27'9"
4'11"12
31'6"
3'9"
35'2"8
3'8"81'
6"3 2'4'11"81'7"63'10'0"110'2"10(a)
8'1"
10'1"
A B
C
D E
F
G
H I
J
K
L
MNOPQR
STUVWX
Y
5
12
2.5
12
4X6(F3)
1.5X4
3X3
4X4
3X8
5X6
6X81.5X4
5X8
5X5 3X8
5X5
6X81.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 480 /-/-/357 /209 /403
V 2298 /-/-/1600 /952 /-
L 1378 /-/-/673 /540 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
V Brg Width = 7.6 Min Req =2.7
L Brg Width = -Min Req =-
Bearings B & V are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 421 -691
C - D 847 -498
D - E 1053 -532
E - F 231 -893
F - G 657 -1780
Chords Tens.Comp.
G - H 651 -1500
H - I 570 -1086
I - J 574 -1240
J - K 407 -987
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Y 700 -444
Y - X 638 -377
W -V 257 -808
T - R 853 -365
Chords Tens.Comp.
R - Q 1566 -632
Q - P 1292 -473
P - M 877 -340
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - X 426 -1017
D - V 227 -503
V - E 578 -1367
V - T 376 -1067
E - T 1718 -751
Webs Tens.Comp.
T - F 507 -1133
F - R 905 -278
J - M 340 -743
M - K 1205 -466
K - L 552 -1340
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.052 Q 999 360
VERT(CL):0.102 Q 999 240
HORZ(LL):0.026 L - -
HORZ(TL):0.053 L - -
Creep Factor: 2.0
Max TC CSI:0.487
Max BC CSI:0.428
Max Web CSI:0.534
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T9
Ply: 1
Qty:1
SEQN:185853 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T6
DrwNo:221.21.1132.50935
SSB /WHK 08/09/2021
9'5"13 25'8"11
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
11'10"14
2'3"11
17'5"13
5'6"15
22'9"4
5'3"7
27'10"12
5'1"8
31'6"
3'7"4
35'2"8
3'8"8
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
17'2"5
4'11"15
22'9"4
5'6"15
27'9"
4'11"12
31'6"
3'9"
35'2"8
3'8"81'
6"3 2'4'11"81'7"63'10'0"110'2"10(a)
8'1"
10'1"
A B
C
D E
F
G
H I
J
K
L
MNOPQR
STUVWX
Y
5
12
2.5
12
4X6(F3)
1.5X4
3X3
4X4
3X8
5X6
6X81.5X4
5X8
5X5 3X8
5X5
6X81.5X4
4X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 483 /-/-/347 /216 /437
U 2295 /-/-/1607 /952 /-
L 1379 /-/-/670 /538 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
U Brg Width = 7.6 Min Req =2.7
L Brg Width = -Min Req =-
Bearings B & U are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 437 -703
C - D 834 -502
D - E 1041 -537
E - F 243 -928
F - G 669 -1813
Chords Tens.Comp.
G - H 590 -1309
H - I 608 -1108
I - J 589 -1294
J - K 413 -1001
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 718 -445
X - W 657 -379
V - U 262 -796
Chords Tens.Comp.
S - Q 905 -389
Q - P 1571 -623
P - M 901 -353
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 425 -1015
D - U 240 -513
U - E 559 -1343
U - S 391 -1062
E - S 1779 -789
S - F 536 -1148
Webs Tens.Comp.
F - Q 847 -240
G - P 318 -595
J - M 367 -757
M - K 1239 -484
K - L 550 -1342
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.054 G 999 360
VERT(CL):0.106 G 999 240
HORZ(LL):0.026 L - -
HORZ(TL):0.052 L - -
Creep Factor: 2.0
Max TC CSI:0.742
Max BC CSI:0.531
Max Web CSI:0.685
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T10
Ply: 1
Qty:1
SEQN:185849 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T19
DrwNo:221.21.1132.51233
SSB /WHK 08/09/2021
9'5"13 25'8"11
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
11'10"8
2'2"15
18'9"3
6'10"11
24'9"4
6'0"1
25'10"12
1'1"8
31'6"
5'7"4
35'2"8
3'8"8
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
18'2"8
6'0"2
25'4"
7'1"8
31'6"
6'2"
35'2"8
3'8"81'
6"3 2'4'11"81'7"63'10'10"111'0"108'1"
10'1"
A B
C
D E
F
G
H I
J
K
L
MNOPQ
RSTUVW
X
5 12
2.5
12
4X6(F3)
1.5X4
3X3
4X4
3X8
4X5
6X81.5X4
5X5
5X10
5X5
3X10
5X5
6X81.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 483 /-/-/347 /216 /437
U 2295 /-/-/1607 /952 /-
L 1379 /-/-/670 /538 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
U Brg Width = 7.6 Min Req =2.7
L Brg Width = -Min Req =-
Bearings B & U are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 437 -703
C - D 834 -502
D - E 1041 -537
E - F 243 -928
F - G 669 -1813
Chords Tens.Comp.
G - H 590 -1309
H - I 608 -1108
I - J 589 -1294
J - K 413 -1001
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - X 718 -445
X - W 657 -379
V - U 262 -796
Chords Tens.Comp.
S - Q 905 -389
Q - P 1571 -623
P - M 901 -353
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - W 425 -1015
D - U 240 -513
U - E 559 -1343
U - S 391 -1062
E - S 1779 -789
S - F 536 -1148
Webs Tens.Comp.
F - Q 847 -240
G - P 318 -595
J - M 367 -757
M - K 1239 -484
K - L 550 -1342
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.054 G 999 360
VERT(CL):0.106 G 999 240
HORZ(LL):0.026 L - -
HORZ(TL):0.052 L - -
Creep Factor: 2.0
Max TC CSI:0.742
Max BC CSI:0.531
Max Web CSI:0.685
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T10
Ply: 1
Qty:1
SEQN:185849 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T19
DrwNo:221.21.1132.51233
SSB /WHK 08/09/2021
9'5"13 25'8"11
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
11'10"8
2'2"15
18'9"3
6'10"11
24'9"4
6'0"1
25'10"12
1'1"8
31'6"
5'7"4
35'2"8
3'8"8
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
18'2"8
6'0"2
25'4"
7'1"8
31'6"
6'2"
35'2"8
3'8"81'
6"3 2'4'11"81'7"63'10'10"111'0"108'1"
10'1"
A B
C
D E
F
G
H I
J
K
L
MNOPQ
RSTUVW
X
5 12
2.5
12
4X6(F3)
1.5X4
3X3
4X4
3X8
4X5
6X81.5X4
5X5
5X10
5X5
3X10
5X5
6X81.5X4
4X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 483 /-/-/343 /217 /446
T 2295 /-/-/1608 /952 /-
K 1378 /-/-/668 /537 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
T Brg Width = 7.6 Min Req =2.7
K Brg Width = -Min Req =-
Bearings B & T are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 441 -702
C - D 837 -503
D - E 1043 -538
E - F 245 -924
Chords Tens.Comp.
F - G 669 -1813
G - H 590 -1308
H - I 589 -1292
I - J 413 -1003
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 721 -445
W -V 659 -378
U - T 262 -798
Chords Tens.Comp.
R - P 901 -387
P - O 1572 -624
O - L 904 -354
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 425 -1015
D - T 240 -513
T - E 559 -1344
T - R 391 -1064
E - R 1777 -787
R - F 536 -1148
Webs Tens.Comp.
F - P 852 -243
G - O 322 -601
I - L 368 -759
L - J 1242 -486
J - K 549 -1342
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 G 999 360
VERT(CL):0.107 G 999 240
HORZ(LL):0.026 K - -
HORZ(TL):0.053 K - -
Creep Factor: 2.0
Max TC CSI:0.756
Max BC CSI:0.531
Max Web CSI:0.535
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T11
Ply: 1
Qty:1
SEQN:185845 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T20
DrwNo:221.21.1132.51420
SSB /WHK 08/09/2021
9'5"13 25'8"11
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
11'10"8
2'2"15
18'9"3
6'10"11
25'4"
6'6"13
31'6"
6'2"
35'2"8
3'8"8
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
18'5"11
6'3"5
25'4"
6'10"5
31'6"
6'2"
35'2"8
3'8"81'
6"3 2'4'11"81'7"63'11'0"1411'3"7(a)
8'1"
10'1"
A B
C
D E
F
G
H
I
J
K
LMNOP
QRSTUV
W
5 12
2.5
12
4X6(F3)
1.5X4
3X34X43X8
4X5
6X81.5X4
5X5
5X5
5X5
3X8
6X81.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 483 /-/-/343 /217 /446
T 2295 /-/-/1608 /952 /-
K 1378 /-/-/668 /537 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
T Brg Width = 7.6 Min Req =2.7
K Brg Width = -Min Req =-
Bearings B & T are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 441 -702
C - D 837 -503
D - E 1043 -538
E - F 245 -924
Chords Tens.Comp.
F - G 669 -1813
G - H 590 -1308
H - I 589 -1292
I - J 413 -1003
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 721 -445
W -V 659 -378
U - T 262 -798
Chords Tens.Comp.
R - P 901 -387
P - O 1572 -624
O - L 904 -354
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 425 -1015
D - T 240 -513
T - E 559 -1344
T - R 391 -1064
E - R 1777 -787
R - F 536 -1148
Webs Tens.Comp.
F - P 852 -243
G - O 322 -601
I - L 368 -759
L - J 1242 -486
J - K 549 -1342
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.52 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.055 G 999 360
VERT(CL):0.107 G 999 240
HORZ(LL):0.026 K - -
HORZ(TL):0.053 K - -
Creep Factor: 2.0
Max TC CSI:0.756
Max BC CSI:0.531
Max Web CSI:0.535
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T11
Ply: 1
Qty:1
SEQN:185845 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T20
DrwNo:221.21.1132.51420
SSB /WHK 08/09/2021
9'5"13 25'8"11
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
11'10"8
2'2"15
18'9"3
6'10"11
25'4"
6'6"13
31'6"
6'2"
35'2"8
3'8"8
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
18'5"11
6'3"5
25'4"
6'10"5
31'6"
6'2"
35'2"8
3'8"81'
6"3 2'4'11"81'7"63'11'0"1411'3"7(a)
8'1"
10'1"
A B
C
D E
F
G
H
I
J
K
LMNOP
QRSTUV
W
5 12
2.5
12
4X6(F3)
1.5X4
3X34X43X8
4X5
6X81.5X4
5X5
5X5
5X5
3X8
6X81.5X4
4X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 482 /-/-/341 /218 /447
T 2314 /-/-/1619 /957 /-
K 1395 /-/-/681 /543 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
T Brg Width = 7.6 Min Req =2.7
K Brg Width = 3.5 Min Req =1.6
Bearings B, T, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 443 -698
C - D 848 -502
D - E 1054 -537
E - F 247 -932
Chords Tens.Comp.
F - G 682 -1841
G - H 606 -1341
H - I 605 -1326
I - J 446 -1084
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 721 -444
W -V 660 -377
U - T 269 -809
Chords Tens.Comp.
R - P 909 -385
P - O 1598 -629
O - L 973 -379
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 424 -1017
D - T 238 -512
T - E 563 -1359
T - R 398 -1075
E - R 1796 -792
R - F 541 -1161
Webs Tens.Comp.
F - P 871 -250
G - O 320 -595
H - O 389 -131
I - L 354 -723
L - J 1272 -494
J - K 556 -1355
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 G 999 360
VERT(CL):0.110 G 999 240
HORZ(LL):0.027 K - -
HORZ(TL):0.054 K - -
Creep Factor: 2.0
Max TC CSI:0.757
Max BC CSI:0.535
Max Web CSI:0.514
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T12
Ply: 1
Qty:1
SEQN:185841 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T21
DrwNo:221.21.1132.51359
SSB /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
11'10"8
2'2"15
18'9"3
6'10"11
25'4"
6'6"13
31'6"
6'2"
35'6"
4'
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
18'5"11
6'3"5
25'4"
6'10"5
31'6"
6'2"
35'6"
4'1'
6"3 2'4'10"1'7"63'11'0"1411'3"7(a)
8'1"
10'1"
A B
C
D E
F
G
H
I
J
K
LMNOP
QRSTUV
W
5 12
2.5
12
4X6(F3)
1.5X4
3X3
4X4
3X8
4X5
6X81.5X4
5X5
5X5
5X5
3X8
6X81.5X4
4X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 482 /-/-/341 /218 /447
T 2314 /-/-/1619 /957 /-
K 1395 /-/-/681 /543 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
T Brg Width = 7.6 Min Req =2.7
K Brg Width = 3.5 Min Req =1.6
Bearings B, T, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 443 -698
C - D 848 -502
D - E 1054 -537
E - F 247 -932
Chords Tens.Comp.
F - G 682 -1841
G - H 606 -1341
H - I 605 -1326
I - J 446 -1084
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - W 721 -444
W -V 660 -377
U - T 269 -809
Chords Tens.Comp.
R - P 909 -385
P - O 1598 -629
O - L 973 -379
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - V 424 -1017
D - T 238 -512
T - E 563 -1359
T - R 398 -1075
E - R 1796 -792
R - F 541 -1161
Webs Tens.Comp.
F - P 871 -250
G - O 320 -595
H - O 389 -131
I - L 354 -723
L - J 1272 -494
J - K 556 -1355
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 G 999 360
VERT(CL):0.110 G 999 240
HORZ(LL):0.027 K - -
HORZ(TL):0.054 K - -
Creep Factor: 2.0
Max TC CSI:0.757
Max BC CSI:0.535
Max Web CSI:0.514
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T12
Ply: 1
Qty:1
SEQN:185841 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T21
DrwNo:221.21.1132.51359
SSB /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
11'10"8
2'2"15
18'9"3
6'10"11
25'4"
6'6"13
31'6"
6'2"
35'6"
4'
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
12'2"6
3'6"6
18'5"11
6'3"5
25'4"
6'10"5
31'6"
6'2"
35'6"
4'1'
6"3 2'4'10"1'7"63'11'0"1411'3"7(a)
8'1"
10'1"
A B
C
D E
F
G
H
I
J
K
LMNOP
QRSTUV
W
5 12
2.5
12
4X6(F3)
1.5X4
3X3
4X4
3X8
4X5
6X81.5X4
5X5
5X5
5X5
3X8
6X81.5X4
4X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 495 /-/-/357 /203 /447
P 2276 /-/-/1562 /909 /-
K 1532 /-/-/691 /560 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 7.6 Min Req =2.7
K Brg Width = 3.5 Min Req =1.8
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 387 -746
C - D 567 -355
D - E 713 -377
E - F 495 -1574
Chords Tens.Comp.
F - G 640 -1683
G - H 588 -1291
H - I 590 -1294
I - J 422 -1110
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 777 -392
S - R 719 -328
Q - P 136 -519
P - O 175 -428
Chords Tens.Comp.
O - N 1400 -543
N - M 1464 -526
M - L 987 -345
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 420 -961
D - P 185 -409
P - E 805 -1880
E - O 1849 -671
O - F 317 -652
Webs Tens.Comp.
G - M 296 -582
H - M 463 -192
I - L 364 -743
L - J 1329 -460
J - K 574 -1499
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 N 999 360
VERT(CL):0.104 N 999 240
HORZ(LL):0.015 L - -
HORZ(TL):0.027 L - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.470
Max Web CSI:0.570
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T13
Ply: 1
Qty:2
SEQN:185833 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T22
DrwNo:221.21.1132.51530
SSB /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
14'10"9
5'3"
20'2"6
5'3"12
25'4"
5'1"10
30'5"10
5'1"10
35'6"
5'0"6
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
14'7"7
5'11"7
19'10"14
5'3"6
25'4"
5'5"2
30'9"2
5'5"2
35'6"
4'8"141'
6"3 2'4'10"1'7"611'0"1411'3"7(a)
8'1"
10'1"
A B
C
D E
F
G
H
I
J
KLMNOPQR
S
5 12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
3X4
3X5
4X6
4X5
5X5
5X5
3X4
5X5
3X8
3X4
4X4
4X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Loading
Truss passed check for 20 psf additional bottom
chord live load in areas with 42"-high x 24"-wide
clearance.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 495 /-/-/357 /203 /447
P 2276 /-/-/1562 /909 /-
K 1532 /-/-/691 /560 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 7.6 Min Req =2.7
K Brg Width = 3.5 Min Req =1.8
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 387 -746
C - D 567 -355
D - E 713 -377
E - F 495 -1574
Chords Tens.Comp.
F - G 640 -1683
G - H 588 -1291
H - I 590 -1294
I - J 422 -1110
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 777 -392
S - R 719 -328
Q - P 136 -519
P - O 175 -428
Chords Tens.Comp.
O - N 1400 -543
N - M 1464 -526
M - L 987 -345
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 420 -961
D - P 185 -409
P - E 805 -1880
E - O 1849 -671
O - F 317 -652
Webs Tens.Comp.
G - M 296 -582
H - M 463 -192
I - L 364 -743
L - J 1329 -460
J - K 574 -1499
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.056 N 999 360
VERT(CL):0.104 N 999 240
HORZ(LL):0.015 L - -
HORZ(TL):0.027 L - -
Creep Factor: 2.0
Max TC CSI:0.599
Max BC CSI:0.470
Max Web CSI:0.570
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T13
Ply: 1
Qty:2
SEQN:185833 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T22
DrwNo:221.21.1132.51530
SSB /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"9
11"9
14'10"9
5'3"
20'2"6
5'3"12
25'4"
5'1"10
30'5"10
5'1"10
35'6"
5'0"6
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
14'7"7
5'11"7
19'10"14
5'3"6
25'4"
5'5"2
30'9"2
5'5"2
35'6"
4'8"141'
6"3 2'4'10"1'7"611'0"1411'3"7(a)
8'1"
10'1"
A B
C
D E
F
G
H
I
J
KLMNOPQR
S
5 12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
3X4
3X5
4X6
4X5
5X5
5X5
3X4
5X5
3X8
3X4
4X4
4X5
2X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 500 /-/-/361 /201 /437
Q 2205 /-/-/1559 /908 /-
L 1434 /-/-/694 /560 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 7.6 Min Req =2.6
L Brg Width = 3.5 Min Req =1.7
Bearings B, Q, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 384 -763
C - D 543 -352
D - E 690 -373
E - F 498 -1502
F - G 641 -1572
Chords Tens.Comp.
G - H 588 -1206
H - I 593 -1040
I - J 589 -1208
J - K 422 -1028
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 775 -393
T - S 718 -330
R - Q 133 -496
Q - P 174 -420
Chords Tens.Comp.
P - O 1333 -547
O - N 1360 -526
N - M 910 -345
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 420 -957
D - Q 188 -421
Q - E 794 -1795
E - P 1772 -677
P - F 319 -613
Webs Tens.Comp.
G - N 289 -537
J - M 364 -735
M - K 1224 -460
K - L 574 -1396
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 O 999 360
VERT(CL):0.096 O 999 240
HORZ(LL):0.013 M - -
HORZ(TL):0.026 M - -
Creep Factor: 2.0
Max TC CSI:0.582
Max BC CSI:0.374
Max Web CSI:0.564
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T14
Ply: 1
Qty:1
SEQN:185837 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T23
DrwNo:221.21.1132.50905
AK /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
14'10"15
5'3"12
20'2"6
5'3"6
24'9"4
4'6"14
25'10"12
1'1"8
30'5"10
4'6"14
35'6"
5'0"6
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
14'7"7
5'11"7
19'9"8
5'2"
25'4"
5'6"8
30'9"2
5'5"2
35'6"
4'8"141'
6"3 2'4'10"1'7"610'10"111'0"10(a)
8'1"
10'1"
A B
C
D E
F
G
H I
J
K
LMNOPQRS
T
5 12
2.5
12
4X6(F3)
1.5X4
3X34X4
3X5
5X8
4X5 5X6
5X5
3X10
5X5
3X5
4X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 500 /-/-/361 /201 /437
Q 2205 /-/-/1559 /908 /-
L 1434 /-/-/694 /560 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 7.6 Min Req =2.6
L Brg Width = 3.5 Min Req =1.7
Bearings B, Q, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 384 -763
C - D 543 -352
D - E 690 -373
E - F 498 -1502
F - G 641 -1572
Chords Tens.Comp.
G - H 588 -1206
H - I 593 -1040
I - J 589 -1208
J - K 422 -1028
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 775 -393
T - S 718 -330
R - Q 133 -496
Q - P 174 -420
Chords Tens.Comp.
P - O 1333 -547
O - N 1360 -526
N - M 910 -345
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 420 -957
D - Q 188 -421
Q - E 794 -1795
E - P 1772 -677
P - F 319 -613
Webs Tens.Comp.
G - N 289 -537
J - M 364 -735
M - K 1224 -460
K - L 574 -1396
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 O 999 360
VERT(CL):0.096 O 999 240
HORZ(LL):0.013 M - -
HORZ(TL):0.026 M - -
Creep Factor: 2.0
Max TC CSI:0.582
Max BC CSI:0.374
Max Web CSI:0.564
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T14
Ply: 1
Qty:1
SEQN:185837 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T23
DrwNo:221.21.1132.50905
AK /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
14'10"15
5'3"12
20'2"6
5'3"6
24'9"4
4'6"14
25'10"12
1'1"8
30'5"10
4'6"14
35'6"
5'0"6
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
14'7"7
5'11"7
19'9"8
5'2"
25'4"
5'6"8
30'9"2
5'5"2
35'6"
4'8"141'
6"3 2'4'10"1'7"610'10"111'0"10(a)
8'1"
10'1"
A B
C
D E
F
G
H I
J
K
LMNOPQRS
T
5 12
2.5
12
4X6(F3)
1.5X4
3X34X4
3X5
5X8
4X5 5X6
5X5
3X10
5X5
3X5
4X5
2X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 507 /-/-/378 /198 /403
O 2187 /-/-/1541 /902 /-
K 1438 /-/-/700 /564 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
O Brg Width = 7.6 Min Req =2.6
K Brg Width = 3.5 Min Req =1.7
Bearings B, O, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 377 -792
C - D 483 -326
D - E 629 -349
E - F 562 -1645
Chords Tens.Comp.
F - G 621 -1468
G - H 552 -1032
H - I 554 -1188
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 778 -400
R - Q 730 -347
P - O 113 -430
O - N 167 -377
Chords Tens.Comp.
N - M 1446 -595
M - L 1235 -456
L - K 759 -308
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 417 -945
D - O 190 -404
O - E 814 -1803
E - N 1788 -676
Webs Tens.Comp.
N - F 296 -480
L - I 496 -123
I - K 588 -1449
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.048 M 999 360
VERT(CL):0.091 M 999 240
HORZ(LL):0.017 K - -
HORZ(TL):0.033 K - -
Creep Factor: 2.0
Max TC CSI:0.753
Max BC CSI:0.614
Max Web CSI:0.540
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T15
Ply: 1
Qty:1
SEQN:185829 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T24
DrwNo:221.21.1132.50921
AK /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
15'10"6
6'3"3
22'9"4
6'10"14
27'10"12
5'1"8
31'8"6
3'9"10
35'6"
3'9"10
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
15'6"14
6'10"14
22'9"4
7'2"6
27'9"
4'11"12
35'6"
7'9"1'
6"3 2'4'10"1'7"610'0"110'2"10(a)
(a)
(a)
8'1"
10'1"
A B
C
D E
F
G H
I
J
KLMNOPQ
R
5 12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
3X4
3X5
5X6
4X5
3X4
5X8
5X5 3X8
5X5
3X5
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 507 /-/-/378 /198 /403
O 2187 /-/-/1541 /902 /-
K 1438 /-/-/700 /564 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
O Brg Width = 7.6 Min Req =2.6
K Brg Width = 3.5 Min Req =1.7
Bearings B, O, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 377 -792
C - D 483 -326
D - E 629 -349
E - F 562 -1645
Chords Tens.Comp.
F - G 621 -1468
G - H 552 -1032
H - I 554 -1188
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - R 778 -400
R - Q 730 -347
P - O 113 -430
O - N 167 -377
Chords Tens.Comp.
N - M 1446 -595
M - L 1235 -456
L - K 759 -308
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Q 417 -945
D - O 190 -404
O - E 814 -1803
E - N 1788 -676
Webs Tens.Comp.
N - F 296 -480
L - I 496 -123
I - K 588 -1449
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.048 M 999 360
VERT(CL):0.091 M 999 240
HORZ(LL):0.017 K - -
HORZ(TL):0.033 K - -
Creep Factor: 2.0
Max TC CSI:0.753
Max BC CSI:0.614
Max Web CSI:0.540
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T15
Ply: 1
Qty:1
SEQN:185829 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T24
DrwNo:221.21.1132.50921
AK /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
15'10"6
6'3"3
22'9"4
6'10"14
27'10"12
5'1"8
31'8"6
3'9"10
35'6"
3'9"10
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
15'6"14
6'10"14
22'9"4
7'2"6
27'9"
4'11"12
35'6"
7'9"1'
6"3 2'4'10"1'7"610'0"110'2"10(a)
(a)
(a)
8'1"
10'1"
A B
C
D E
F
G H
I
J
KLMNOPQ
R
5 12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
3X4
3X5
5X6
4X5
3X4
5X8
5X5 3X8
5X5
3X5
1.5X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 499 /-/-/385 /192 /384
P 2213 /-/-/1536 /910 /-
K 1433 /-/-/694 /564 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 7.6 Min Req =2.6
K Brg Width = 3.5 Min Req =1.7
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 364 -762
C - D 548 -352
D - E 700 -372
E - F 501 -1503
Chords Tens.Comp.
F - G 637 -1555
G - H 631 -1294
H - I 631 -1294
I - J 461 -1118
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 748 -401
S - R 691 -339
Q - P 125 -501
P - O 163 -434
Chords Tens.Comp.
O - N 1340 -555
N - M 1332 -510
M - L 954 -357
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 421 -958
D - P 192 -439
P - E 780 -1783
E - O 1802 -693
O - F 334 -618
Webs Tens.Comp.
H - M 239 -380
M - I 614 -255
I - L 336 -650
L - J 1227 -459
J - K 582 -1388
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.051 N 999 360
VERT(CL):0.097 N 999 240
HORZ(LL):0.013 L - -
HORZ(TL):0.024 L - -
Creep Factor: 2.0
Max TC CSI:0.726
Max BC CSI:0.398
Max Web CSI:0.540
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T16
Ply: 1
Qty:1
SEQN:185825 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T25
DrwNo:221.21.1132.50951
SSB /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
14'10"6
5'3"3
20'9"4
5'10"14
25'4"
4'6"12
29'10"12
4'6"12
35'6"
5'7"4
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
14'6"14
5'10"14
20'9"4
6'2"6
25'4"
4'6"12
29'10"12
4'6"12
35'6"
5'7"41'
6"3 2'4'10"1'7"69'2"19'4"108'1"
10'1"
A B
C
D E
F
G H I
J
KLMNOPQR
S
5
12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
3X4
3X5
5X8
4X5
3X4
5X8
5X5
1.5X4
3X8
5X8
3X5
4X4
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 499 /-/-/385 /192 /384
P 2213 /-/-/1536 /910 /-
K 1433 /-/-/694 /564 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 7.6 Min Req =2.6
K Brg Width = 3.5 Min Req =1.7
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 364 -762
C - D 548 -352
D - E 700 -372
E - F 501 -1503
Chords Tens.Comp.
F - G 637 -1555
G - H 631 -1294
H - I 631 -1294
I - J 461 -1118
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 748 -401
S - R 691 -339
Q - P 125 -501
P - O 163 -434
Chords Tens.Comp.
O - N 1340 -555
N - M 1332 -510
M - L 954 -357
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 421 -958
D - P 192 -439
P - E 780 -1783
E - O 1802 -693
O - F 334 -618
Webs Tens.Comp.
H - M 239 -380
M - I 614 -255
I - L 336 -650
L - J 1227 -459
J - K 582 -1388
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.55 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.051 N 999 360
VERT(CL):0.097 N 999 240
HORZ(LL):0.013 L - -
HORZ(TL):0.024 L - -
Creep Factor: 2.0
Max TC CSI:0.726
Max BC CSI:0.398
Max Web CSI:0.540
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T16
Ply: 1
Qty:1
SEQN:185825 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T25
DrwNo:221.21.1132.50951
SSB /WHK 08/09/2021
9'5"13 26'0"3
4'5"12
4'5"12
8'8"
4'2"4
9'7"3
11"3
14'10"6
5'3"3
20'9"4
5'10"14
25'4"
4'6"12
29'10"12
4'6"12
35'6"
5'7"4
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
14'6"14
5'10"14
20'9"4
6'2"6
25'4"
4'6"12
29'10"12
4'6"12
35'6"
5'7"41'
6"3 2'4'10"1'7"69'2"19'4"108'1"
10'1"
A B
C
D E
F
G H I
J
KLMNOPQR
S
5
12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
3X4
3X5
5X8
4X5
3X4
5X8
5X5
1.5X4
3X8
5X8
3X5
4X4
2X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 485 /-/-/377 /192 /334
P 2361 /-/-/1596 /957 /-
K 1546 /-/-/777 /603 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 7.6 Min Req =2.8
K Brg Width = 3.5 Min Req =1.8
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 365 -710
C - D 685 -368
D - E 842 -387
E - F 482 -1410
Chords Tens.Comp.
F - G 723 -1779
G - H 823 -1808
H - I 823 -1808
I - J 566 -1409
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 731 -392
S - R 670 -324
Q - P 192 -642
P - O 194 -561
Chords Tens.Comp.
O - N 1283 -501
N - M 1565 -581
M - L 1220 -452
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 422 -988
D - P 184 -436
P - E 816 -1938
E - O 1922 -737
O - F 400 -853
F - N 429 -119
Webs Tens.Comp.
H - M 374 -634
M - I 798 -335
I - L 337 -632
L - J 1428 -526
J - K 620 -1499
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.074 H 999 360
VERT(CL):0.140 H 999 240
HORZ(LL):0.016 K - -
HORZ(TL):0.031 K - -
Creep Factor: 2.0
Max TC CSI:0.776
Max BC CSI:0.473
Max Web CSI:0.446
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T17
Ply: 1
Qty:1
SEQN:185819 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T26
DrwNo:221.21.1134.40857
AK /WHK 08/09/2021
9'5"13 28'1"11
4'5"12
4'5"12
8'7"10
4'1"14
9'7"9
11"15
13'10"6
4'2"13
18'9"4
4'10"14
25'4"
6'6"12
31'10"12
6'6"12
37'7"8
5'8"12
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
13'6"6
4'10"6
18'9"4
5'2"14
25'4"
6'6"12
31'10"12
6'6"12
37'7"8
5'8"121'
6"3 2'3'11"61'7"68'4"18'6"108'1"
10'1"
A B
C
D
E
F
G H I
J
KLMNOPQR
S
5 12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
5X5
3X5
4X6
3X8
3X4
5X8
3X4
1.5X4
5X8
5X8
4X4
4X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 485 /-/-/377 /192 /334
P 2361 /-/-/1596 /957 /-
K 1546 /-/-/777 /603 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 7.6 Min Req =2.8
K Brg Width = 3.5 Min Req =1.8
Bearings B, P, & K are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 365 -710
C - D 685 -368
D - E 842 -387
E - F 482 -1410
Chords Tens.Comp.
F - G 723 -1779
G - H 823 -1808
H - I 823 -1808
I - J 566 -1409
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - S 731 -392
S - R 670 -324
Q - P 192 -642
P - O 194 -561
Chords Tens.Comp.
O - N 1283 -501
N - M 1565 -581
M - L 1220 -452
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - R 422 -988
D - P 184 -436
P - E 816 -1938
E - O 1922 -737
O - F 400 -853
F - N 429 -119
Webs Tens.Comp.
H - M 374 -634
M - I 798 -335
I - L 337 -632
L - J 1428 -526
J - K 620 -1499
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.074 H 999 360
VERT(CL):0.140 H 999 240
HORZ(LL):0.016 K - -
HORZ(TL):0.031 K - -
Creep Factor: 2.0
Max TC CSI:0.776
Max BC CSI:0.473
Max Web CSI:0.446
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T17
Ply: 1
Qty:1
SEQN:185819 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T26
DrwNo:221.21.1134.40857
AK /WHK 08/09/2021
9'5"13 28'1"11
4'5"12
4'5"12
8'7"10
4'1"14
9'7"9
11"15
13'10"6
4'2"13
18'9"4
4'10"14
25'4"
6'6"12
31'10"12
6'6"12
37'7"8
5'8"12
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
13'6"6
4'10"6
18'9"4
5'2"14
25'4"
6'6"12
31'10"12
6'6"12
37'7"8
5'8"121'
6"3 2'3'11"61'7"68'4"18'6"108'1"
10'1"
A B
C
D
E
F
G H I
J
KLMNOPQR
S
5 12
2.5
12
4X6(F3)
1.5X4
3X4
3X3
4X4
5X5
3X5
4X6
3X8
3X4
5X8
3X4
1.5X4
5X8
5X8
4X4
4X5
2X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 487 /-/-/254 /79 /349
Q 2381 /-/-/1395 /1026 /-
L 1534 /-/-/750 /597 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 7.6 Min Req =2.8
L Brg Width = 3.5 Min Req =1.8
Bearings B, Q, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 18 -711
C - D 693 -384
D - E 854 -455
E - F 908 -414
F - G 646 -1685
Chords Tens.Comp.
G - H 863 -2022
H - I 811 -1878
I - J 811 -1878
J - K 451 -1124
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 596 -302
T - S 602 -313
R - Q 213 -648
Q - P 942 -358
Chords Tens.Comp.
P - O 1495 -553
O - N 2043 -784
N - M 991 -374
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 486 -985
D - Q 252 -408
Q - F 1015 -2365
F - P 805 -255
G - P 221 -393
G - O 747 -306
Webs Tens.Comp.
O - H 250 -401
N - J 1195 -464
I - N 306 -526
J - M 405 -860
M - K 1380 -520
K - L 607 -1508
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.084 H 999 360
VERT(CL):0.160 H 999 240
HORZ(LL):0.024 L - -
HORZ(TL):0.045 L - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.523
Max Web CSI:0.936
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T18
Ply: 1
Qty:1
SEQN:185815 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T27
DrwNo:221.21.1134.43717
AK /WHK 08/09/2021
9'5"13 28'1"11
4'5"6
4'5"6
8'8"
4'2"10
9'5"13
9"13
12'8"10
3'2"13
16'9"4
4'0"10
22'8"1
5'10"13
28'1"11
5'5"9
33'10"12
5'9"1
37'7"8
3'8"12
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
16'9"4
8'1"4
22'4"9
5'7"5
28'1"11
5'9"1
33'10"12
5'9"1
37'7"8
3'8"121'
6"3 2'3'11"61'7"67'6"17'8"108'1"
10'1"
A B
C
D E
F
G H I J
K
LMNOPQRS
T
5 12
2.5
12
4X6(F3)
5X5
3X3
4X4
3X4
5X8
3X8
5X8
3X4 5X5
3X4
3X10
5X8
4X4
4X5
2X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.715'
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Additional Notes
Shim all supports to solid bearing.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 487 /-/-/254 /79 /349
Q 2381 /-/-/1395 /1026 /-
L 1534 /-/-/750 /597 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 7.6 Min Req =2.8
L Brg Width = 3.5 Min Req =1.8
Bearings B, Q, & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 18 -711
C - D 693 -384
D - E 854 -455
E - F 908 -414
F - G 646 -1685
Chords Tens.Comp.
G - H 863 -2022
H - I 811 -1878
I - J 811 -1878
J - K 451 -1124
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 596 -302
T - S 602 -313
R - Q 213 -648
Q - P 942 -358
Chords Tens.Comp.
P - O 1495 -553
O - N 2043 -784
N - M 991 -374
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - S 486 -985
D - Q 252 -408
Q - F 1015 -2365
F - P 805 -255
G - P 221 -393
G - O 747 -306
Webs Tens.Comp.
O - H 250 -401
N - J 1195 -464
I - N 306 -526
J - M 405 -860
M - K 1380 -520
K - L 607 -1508
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.084 H 999 360
VERT(CL):0.160 H 999 240
HORZ(LL):0.024 L - -
HORZ(TL):0.045 L - -
Creep Factor: 2.0
Max TC CSI:0.614
Max BC CSI:0.523
Max Web CSI:0.936
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T18
Ply: 1
Qty:1
SEQN:185815 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T27
DrwNo:221.21.1134.43717
AK /WHK 08/09/2021
9'5"13 28'1"11
4'5"6
4'5"6
8'8"
4'2"10
9'5"13
9"13
12'8"10
3'2"13
16'9"4
4'0"10
22'8"1
5'10"13
28'1"11
5'5"9
33'10"12
5'9"1
37'7"8
3'8"12
7"10
7"10
4'4"
3'8"6
8'8"
4'4"
16'9"4
8'1"4
22'4"9
5'7"5
28'1"11
5'9"1
33'10"12
5'9"1
37'7"8
3'8"121'
6"3 2'3'11"61'7"67'6"17'8"108'1"
10'1"
A B
C
D E
F
G H I J
K
LMNOPQRS
T
5 12
2.5
12
4X6(F3)
5X5
3X3
4X4
3X4
5X8
3X8
5X8
3X4 5X5
3X4
3X10
5X8
4X4
4X5
2X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 717 /-/-/422 /168 /349
P 2704 /-/-/1451 /1118 /-
J 1083 /-/-/524 /412 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =2.8
J Brg Width = 3.5 Min Req =1.5
Bearings B, P, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 204 -759
C - D 979 -387
E - F 437 -1100
Chords Tens.Comp.
F - G 437 -1100
G - H 479 -1179
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 596 -290
Q - P 592 -292
Chords Tens.Comp.
L - K 1212 -463
K - J 376 -152
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 621 -1234
D - P 728 -1599
D - N 1270 -509
P - N 381 -968
N - E 570 -1251
Webs Tens.Comp.
E - L 1193 -451
F - L 287 -494
G - K 298 -504
K - H 1031 -381
H - J 415 -1005
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.048 F 999 360
VERT(CL):0.094 F 999 240
HORZ(LL):0.016 J - -
HORZ(TL):0.030 J - -
Creep Factor: 2.0
Max TC CSI:0.659
Max BC CSI:0.494
Max Web CSI:0.590
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T19
Ply: 1
Qty:1
SEQN:185809 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T28
DrwNo:221.21.1134.45920
AK /WHK 08/09/2021
T1
14'9"12 22'9"12
7'7"11
7'7"11
14'9"4
7'1"9
19'0"8
4'3"4
24'7"5
5'6"13
30'2"3
5'6"13
35'10"12
5'8"9
37'7"8
1'8"12
7'5"15
7'5"15
14'11"
7'5"1
19'4"
4'5"
24'7"5
5'3"5
30'5"11
5'10"5
37'7"8
7'1"131'
6"3 2'3'11"66'8"16'10"10(a)
(a)
8'1"
10'1"
A B
C
D E F G H
I
JKL
M
N
OPQ
5
12
3X4(B1)5X5
3X4
5X8
4X7 6X81.5X4
3X5 5X5
3X10
3X4
5X5
5X5
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 717 /-/-/422 /168 /349
P 2704 /-/-/1451 /1118 /-
J 1083 /-/-/524 /412 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =2.8
J Brg Width = 3.5 Min Req =1.5
Bearings B, P, & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 204 -759
C - D 979 -387
E - F 437 -1100
Chords Tens.Comp.
F - G 437 -1100
G - H 479 -1179
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - Q 596 -290
Q - P 592 -292
Chords Tens.Comp.
L - K 1212 -463
K - J 376 -152
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 621 -1234
D - P 728 -1599
D - N 1270 -509
P - N 381 -968
N - E 570 -1251
Webs Tens.Comp.
E - L 1193 -451
F - L 287 -494
G - K 298 -504
K - H 1031 -381
H - J 415 -1005
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.048 F 999 360
VERT(CL):0.094 F 999 240
HORZ(LL):0.016 J - -
HORZ(TL):0.030 J - -
Creep Factor: 2.0
Max TC CSI:0.659
Max BC CSI:0.494
Max Web CSI:0.590
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T19
Ply: 1
Qty:1
SEQN:185809 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T28
DrwNo:221.21.1134.45920
AK /WHK 08/09/2021
T1
14'9"12 22'9"12
7'7"11
7'7"11
14'9"4
7'1"9
19'0"8
4'3"4
24'7"5
5'6"13
30'2"3
5'6"13
35'10"12
5'8"9
37'7"8
1'8"12
7'5"15
7'5"15
14'11"
7'5"1
19'4"
4'5"
24'7"5
5'3"5
30'5"11
5'10"5
37'7"8
7'1"131'
6"3 2'3'11"66'8"16'10"10(a)
(a)
8'1"
10'1"
A B
C
D E F G H
I
JKL
M
N
OPQ
5
12
3X4(B1)5X5
3X4
5X8
4X7 6X81.5X4
3X5 5X5
3X10
3X4
5X5
5X5
1.5X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 421 /-/-/251 /25 /341
P 2921 /-/-/1646 /1312 /-
M 1212 /-/-/616 /487 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =3.1
M Brg Width = 3.5 Min Req =1.5
Bearings B, P, & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 568 -404
E - F 1362 -717
F - G 1217 -616
Chords Tens.Comp.
G - H 417 -520
H - I 226 -786
I - J 226 -786
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - V 198 -454
V - T 140 -407
T - Q 140 -416
Chords Tens.Comp.
P - O 676 -1331
O - N 564 -387
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - Q 520 -1052
F - Q 345 -677
Q - P 784 -1535
Q - G 563 -232
P - G 1015 -2125
G - O 1814 -774
Webs Tens.Comp.
O - H 553 -1021
H - N 581 -285
I - N 363 -631
N - J 927 -273
J - M 471 -1118
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.130 U 999 360
VERT(CL):0.260 U 671 240
HORZ(LL):0.042 X - -
HORZ(TL):0.086 X - -
Creep Factor: 2.0
Max TC CSI:0.925
Max BC CSI:0.503
Max Web CSI:0.882
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:185805 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T32
DrwNo:221.21.1134.52867
AK /WHK 08/09/2021
T1
14'9"12 20'9"12 2'
11"11
11"11
7'8"13
6'9"2
12'9"4
5'0"7
14'9"12
2'0"8
21'10"3
7'0"7
28'7"1
6'8"15
35'4"
6'8"15
37'7"8
2'3"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
7'7"1
4'10"11
12'9"4
5'2"3
14'8"
1'10"12
21'6"11
6'10"11
28'7"1
7'0"7
35'7"8
7'0"7
37'7"8
2'1'
6"3 5'10"18"6'0"10(a)(a)
8'1"A B C D
E
F G H I J K
LMNOP
Q
R
ST
UVWX
5 12
3X4(B1)
3X3
1.5X4(**)
1.5X6
3X4
5X5
5X8 4X5
5X8
5X8
3X4 5X5
3X8
3X4
3X4
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 421 /-/-/251 /25 /341
P 2921 /-/-/1646 /1312 /-
M 1212 /-/-/616 /487 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
P Brg Width = 3.5 Min Req =3.1
M Brg Width = 3.5 Min Req =1.5
Bearings B, P, & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 568 -404
E - F 1362 -717
F - G 1217 -616
Chords Tens.Comp.
G - H 417 -520
H - I 226 -786
I - J 226 -786
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - V 198 -454
V - T 140 -407
T - Q 140 -416
Chords Tens.Comp.
P - O 676 -1331
O - N 564 -387
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
E - Q 520 -1052
F - Q 345 -677
Q - P 784 -1535
Q - G 563 -232
P - G 1015 -2125
G - O 1814 -774
Webs Tens.Comp.
O - H 553 -1021
H - N 581 -285
I - N 363 -631
N - J 927 -273
J - M 471 -1118
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.130 U 999 360
VERT(CL):0.260 U 671 240
HORZ(LL):0.042 X - -
HORZ(TL):0.086 X - -
Creep Factor: 2.0
Max TC CSI:0.925
Max BC CSI:0.503
Max Web CSI:0.882
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T20
Ply: 1
Qty:1
SEQN:185805 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T32
DrwNo:221.21.1134.52867
AK /WHK 08/09/2021
T1
14'9"12 20'9"12 2'
11"11
11"11
7'8"13
6'9"2
12'9"4
5'0"7
14'9"12
2'0"8
21'10"3
7'0"7
28'7"1
6'8"15
35'4"
6'8"15
37'7"8
2'3"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
7'7"1
4'10"11
12'9"4
5'2"3
14'8"
1'10"12
21'6"11
6'10"11
28'7"1
7'0"7
35'7"8
7'0"7
37'7"8
2'1'
6"3 5'10"18"6'0"10(a)(a)
8'1"A B C D
E
F G H I J K
LMNOP
Q
R
ST
UVWX
5 12
3X4(B1)
3X3
1.5X4(**)
1.5X6
3X4
5X5
5X8 4X5
5X8
5X8
3X4 5X5
3X8
3X4
3X4
4X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 579 /-/-/357 /127 /291
Q 2924 /-/-/1572 /1274 /-
N 1072 /-/-/538 /439 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.1
N Brg Width = 3.5 Min Req =1.5
Bearings B, Q, & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 49 -530
E - F 598 -305
F - G 987 -502
G - H 984 -500
Chords Tens.Comp.
H - I 613 -398
I - J 613 -398
J - K 182 -668
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - V 435 -149
V - U 428 -149
U - R 238 -552
Chords Tens.Comp.
Q - P 798 -1637
P - O 690 -194
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 318 -524
E - U 445 -896
F - U 499 -191
F - R 513 -1064
R - Q 838 -1724
R - H 1102 -483
Webs Tens.Comp.
Q - H 1124 -2411
H - P 1872 -798
I - P 323 -577
P - J 351 -719
O - K 776 -219
K - N 410 -966
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.150 W 999 360
VERT(CL):0.297 W 668 240
HORZ(LL):0.054 Z - -
HORZ(TL):0.107 Z - -
Creep Factor: 2.0
Max TC CSI:0.862
Max BC CSI:0.507
Max Web CSI:0.941
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T21
Ply: 1
Qty:1
SEQN:185799 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T30
DrwNo:221.21.1134.57970
AK /WHK 08/09/2021
16'9"12 18'9"12 2'
11"11
11"11
6'8"13
5'9"2
10'9"4
4'0"7
13'1"4
2'4"
16'9"12
3'8"8
23'0"7
6'2"11
29'1"5
6'0"15
35'4"
6'2"11
37'7"8
2'3"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'7"1
3'10"11
10'9"4
4'2"3
12'11"8
2'2"4
16'8"
3'8"8
23'0"7
6'4"7
29'4"13
6'4"7
35'7"8
6'2"11
37'7"8
2'1'
6"3 5'0"18"5'2"108'1"A B C D
E
F G H I J K L
MNOPQ
R
S
TUV
WXYZ
5 12
3X4(B1)
3X3
2X41.5X6(**)
3X4
5X8
3X4
5X8 4X5
5X8 5X5
5X8
3X4
5X5
3X4
3X4
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 579 /-/-/357 /127 /291
Q 2924 /-/-/1572 /1274 /-
N 1072 /-/-/538 /439 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.1
N Brg Width = 3.5 Min Req =1.5
Bearings B, Q, & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 49 -530
E - F 598 -305
F - G 987 -502
G - H 984 -500
Chords Tens.Comp.
H - I 613 -398
I - J 613 -398
J - K 182 -668
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
X - V 435 -149
V - U 428 -149
U - R 238 -552
Chords Tens.Comp.
Q - P 798 -1637
P - O 690 -194
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 318 -524
E - U 445 -896
F - U 499 -191
F - R 513 -1064
R - Q 838 -1724
R - H 1102 -483
Webs Tens.Comp.
Q - H 1124 -2411
H - P 1872 -798
I - P 323 -577
P - J 351 -719
O - K 776 -219
K - N 410 -966
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.150 W 999 360
VERT(CL):0.297 W 668 240
HORZ(LL):0.054 Z - -
HORZ(TL):0.107 Z - -
Creep Factor: 2.0
Max TC CSI:0.862
Max BC CSI:0.507
Max Web CSI:0.941
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T21
Ply: 1
Qty:1
SEQN:185799 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T30
DrwNo:221.21.1134.57970
AK /WHK 08/09/2021
16'9"12 18'9"12 2'
11"11
11"11
6'8"13
5'9"2
10'9"4
4'0"7
13'1"4
2'4"
16'9"12
3'8"8
23'0"7
6'2"11
29'1"5
6'0"15
35'4"
6'2"11
37'7"8
2'3"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'7"1
3'10"11
10'9"4
4'2"3
12'11"8
2'2"4
16'8"
3'8"8
23'0"7
6'4"7
29'4"13
6'4"7
35'7"8
6'2"11
37'7"8
2'1'
6"3 5'0"18"5'2"108'1"A B C D
E
F G H I J K L
MNOPQ
R
S
TUV
WXYZ
5 12
3X4(B1)
3X3
2X41.5X6(**)
3X4
5X8
3X4
5X8 4X5
5X8 5X5
5X8
3X4
5X5
3X4
3X4
3X3
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 682 /-/-/418 /190 /240
S 2750 /-/-/1404 /1169 /-
O 1102 /-/-/549 /467 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
S Brg Width = 3.5 Min Req =2.9
O Brg Width = 3.5 Min Req =1.5
Bearings B, S, & O are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 9 -428
D - E 130 -799
E - F 82 -377
F - G 1461 -703
G - H 1463 -702
Chords Tens.Comp.
H - I 675 -287
I - J 675 -287
J - K 226 -822
K - L 224 -717
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - Z 554 -162
Z - X 686 -246
X - W 680 -245
Chords Tens.Comp.
S - R 774 -1633
R - Q 820 -228
Q - P 755 -242
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AB 353 -598
E - W 357 -677
F - W 593 -217
F - T 821 -1806
G - T 279 -541
T - S 905 -1895
T - H 598 -249
Webs Tens.Comp.
S - H 760 -1747
H - R 1778 -741
I - R 247 -434
R - J 419 -948
K - P 239 -505
P - L 896 -295
L - O 406 -966
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.163 Y 999 360
VERT(CL):0.322 Y 616 240
HORZ(LL):0.060 V - -
HORZ(TL):0.122 V - -
Creep Factor: 2.0
Max TC CSI:0.948
Max BC CSI:0.582
Max Web CSI:0.636
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T22
Ply: 1
Qty:1
SEQN:185795 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T34
DrwNo:221.21.1135.03203
AK /WHK 08/09/2021
T1
16'9"12 18'9"12 2'
11"11
11"11
7'0"12
6'1"1
8'9"4
1'8"8
15'1"4
6'4"
16'9"12
1'8"8
21'5"12
4'8"
26'
4'6"4
30'8"
4'8"
35'4"
4'8"
37'7"8
2'3"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'11"
4'2"10
8'9"4
1'10"4
14'11"8
6'2"4
16'8"
1'8"8
21'5"12
4'9"12
26'3"8
4'9"12
30'11"8
4'8"
35'7"8
4'8"
37'7"8
2'1'
6"3 4'2"18"4'4"10(a)
8'1"A B C D
E
F G H I J K L M
NOPQRS
T
U
VWX
YZAAAB
5
12
3X4(B1)
1.5X4
1.5X4
3X3
2X4
1.5X6(**)
1.5X4
5X8 1.5X4
6X8
1.5X4 4X4
5X8 5X5
5X8 5X5
3X3
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T1 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Plating Notes
All plates are 3X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 682 /-/-/418 /190 /240
S 2750 /-/-/1404 /1169 /-
O 1102 /-/-/549 /467 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
S Brg Width = 3.5 Min Req =2.9
O Brg Width = 3.5 Min Req =1.5
Bearings B, S, & O are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 9 -428
D - E 130 -799
E - F 82 -377
F - G 1461 -703
G - H 1463 -702
Chords Tens.Comp.
H - I 675 -287
I - J 675 -287
J - K 226 -822
K - L 224 -717
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - Z 554 -162
Z - X 686 -246
X - W 680 -245
Chords Tens.Comp.
S - R 774 -1633
R - Q 820 -228
Q - P 755 -242
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C -AB 353 -598
E - W 357 -677
F - W 593 -217
F - T 821 -1806
G - T 279 -541
T - S 905 -1895
T - H 598 -249
Webs Tens.Comp.
S - H 760 -1747
H - R 1778 -741
I - R 247 -434
R - J 419 -948
K - P 239 -505
P - L 896 -295
L - O 406 -966
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.163 Y 999 360
VERT(CL):0.322 Y 616 240
HORZ(LL):0.060 V - -
HORZ(TL):0.122 V - -
Creep Factor: 2.0
Max TC CSI:0.948
Max BC CSI:0.582
Max Web CSI:0.636
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T22
Ply: 1
Qty:1
SEQN:185795 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T34
DrwNo:221.21.1135.03203
AK /WHK 08/09/2021
T1
16'9"12 18'9"12 2'
11"11
11"11
7'0"12
6'1"1
8'9"4
1'8"8
15'1"4
6'4"
16'9"12
1'8"8
21'5"12
4'8"
26'
4'6"4
30'8"
4'8"
35'4"
4'8"
37'7"8
2'3"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'11"
4'2"10
8'9"4
1'10"4
14'11"8
6'2"4
16'8"
1'8"8
21'5"12
4'9"12
26'3"8
4'9"12
30'11"8
4'8"
35'7"8
4'8"
37'7"8
2'1'
6"3 4'2"18"4'4"10(a)
8'1"A B C D
E
F G H I J K L M
NOPQRS
T
U
VWX
YZAAAB
5
12
3X4(B1)
1.5X4
1.5X4
3X3
2X4
1.5X6(**)
1.5X4
5X8 1.5X4
6X8
1.5X4 4X4
5X8 5X5
5X8 5X5
3X3
1.5X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2 2x4 SP 2250f-1.9E; W10,
W16 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 8.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at -1.00 to 93 plf at 6.77
TC: From 46 plf at 6.77 to 46 plf at 37.62
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.80
BC: From 10 plf at 6.80 to 10 plf at 37.62
TC: 670 lb Conc. Load at 6.80
TC: 272 lb Conc. Load at 7.27, 9.27,11.27,13.27
TC: 285 lb Conc. Load at 15.27,17.27,19.27,21.27
23.27,25.27,27.27,29.27,31.27,33.27,35.27,37.27
BC: 536 lb Conc. Load at 6.80
BC: 122 lb Conc. Load at 7.27, 9.27,11.27,13.27
BC: 128 lb Conc. Load at 15.27,17.27,19.27,21.27
23.27,25.27,27.27,29.27,31.27,33.27,35.27,37.27
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1478 /-/-/-/624 /-
Q 6354 /-/1 /-/2724 /0
N 2492 /-/0 /-/1076 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.4
N Brg Width = 3.5 Min Req =1.5
Bearings B, Q, & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 166 -386
C - D 257 -591
D - E 694 -1619
E - F 181 -398
Chords Tens.Comp.
F - G 1728 -723
G - H 1724 -722
J - K 407 -953
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - X 1274 -535
X - V 1492 -634
V - U 1519 -639
Chords Tens.Comp.
Q - P 1640 -3895
P - O 977 -428
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 333 -735
E - V 444 -69
E - U 529 -1297
U - F 783 -257
F - R 1001 -2328
R - Q 1018 -2381
R - H 624 -286
Webs Tens.Comp.
Q - H 1005 -2088
H - P 2504 -1063
I - P 366 -572
P - J 328 -755
O - K 1026 -430
K - N 515 -975
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.181 W 999 360
VERT(CL):0.334 W 600 240
HORZ(LL):0.078 T - -
HORZ(TL):0.143 T - -
Creep Factor: 2.0
Max TC CSI:0.688
Max BC CSI:0.845
Max Web CSI:0.565
VIEW Ver: 20.02.01A.1209.11
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T23
Ply: 2
Qty:1
SEQN:22882 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T61
DrwNo:221.21.1135.10783
AK /WHK 08/09/2021
2 Complete Trusses Required
T3
W2
W10
W16
16'9"12 18'9"12 2'
11"11
11"11
6'9"4
5'9"9
11'1"14
4'4"10
15'1"4
3'11"6
16'9"12
1'8"8
23'0"12
6'3"
29'1"
6'0"4
35'3"
6'2"
37'7"8
2'4"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'11"
4'2"10
10'10"6
3'11"6
14'11"8
4'1"2
16'7"
1'7"8
23'0"12
6'5"12
29'4"8
6'3"12
35'8"8
6'4"
37'7"8
1'11"1'
6"3 3'4"18"3'6"108'1"A B C D
E F G H I J K L
MNOPQ
R
S
TUV
WXYZ
5
12
3X4(B1)
3X4
3X32X6
5X8
3X4
4X5
6X81.5X6 4X6
5X12 5X5
4X12
3X4
5X5
3X6
3X6
3X3
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E; T3 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W2 2x4 SP 2250f-1.9E; W10,
W16 2x6 SP #2;
Nailnote
Nail Schedule:0.128"x3", min. nails
Top Chord: 1 Row @ 8.25" o.c.
Bot Chord: 1 Row @12.00" o.c.
Webs : 1 Row @ 4" o.c.
Use equal spacing between rows and stagger nails
in each row to avoid splitting.
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at -1.00 to 93 plf at 6.77
TC: From 46 plf at 6.77 to 46 plf at 37.62
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 6.80
BC: From 10 plf at 6.80 to 10 plf at 37.62
TC: 670 lb Conc. Load at 6.80
TC: 272 lb Conc. Load at 7.27, 9.27,11.27,13.27
TC: 285 lb Conc. Load at 15.27,17.27,19.27,21.27
23.27,25.27,27.27,29.27,31.27,33.27,35.27,37.27
BC: 536 lb Conc. Load at 6.80
BC: 122 lb Conc. Load at 7.27, 9.27,11.27,13.27
BC: 128 lb Conc. Load at 15.27,17.27,19.27,21.27
23.27,25.27,27.27,29.27,31.27,33.27,35.27,37.27
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Right end vertical not exposed to wind pressure.
Right cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1478 /-/-/-/624 /-
Q 6354 /-/1 /-/2724 /0
N 2492 /-/0 /-/1076 /0
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
Q Brg Width = 3.5 Min Req =3.4
N Brg Width = 3.5 Min Req =1.5
Bearings B, Q, & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 166 -386
C - D 257 -591
D - E 694 -1619
E - F 181 -398
Chords Tens.Comp.
F - G 1728 -723
G - H 1724 -722
J - K 407 -953
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - X 1274 -535
X - V 1492 -634
V - U 1519 -639
Chords Tens.Comp.
Q - P 1640 -3895
P - O 977 -428
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - Z 333 -735
E - V 444 -69
E - U 529 -1297
U - F 783 -257
F - R 1001 -2328
R - Q 1018 -2381
R - H 624 -286
Webs Tens.Comp.
Q - H 1005 -2088
H - P 2504 -1063
I - P 366 -572
P - J 328 -755
O - K 1026 -430
K - N 515 -975
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.76 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.181 W 999 360
VERT(CL):0.334 W 600 240
HORZ(LL):0.078 T - -
HORZ(TL):0.143 T - -
Creep Factor: 2.0
Max TC CSI:0.688
Max BC CSI:0.845
Max Web CSI:0.565
VIEW Ver: 20.02.01A.1209.11
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T23
Ply: 2
Qty:1
SEQN:22882 HIPM
FROM:
Cust: R 761 JRef:1X7T7610019 T61
DrwNo:221.21.1135.10783
AK /WHK 08/09/2021
2 Complete Trusses Required
T3
W2
W10
W16
16'9"12 18'9"12 2'
11"11
11"11
6'9"4
5'9"9
11'1"14
4'4"10
15'1"4
3'11"6
16'9"12
1'8"8
23'0"12
6'3"
29'1"
6'0"4
35'3"
6'2"
37'7"8
2'4"8
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'11"
4'2"10
10'10"6
3'11"6
14'11"8
4'1"2
16'7"
1'7"8
23'0"12
6'5"12
29'4"8
6'3"12
35'8"8
6'4"
37'7"8
1'11"1'
6"3 3'4"18"3'6"108'1"A B C D
E F G H I J K L
MNOPQ
R
S
TUV
WXYZ
5
12
3X4(B1)
3X4
3X32X6
5X8
3X4
4X5
6X81.5X6 4X6
5X12 5X5
4X12
3X4
5X5
3X6
3X6
3X3
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.000'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at 0.00 to 93 plf at 2.70
TC: From 76 plf at 2.70 to 76 plf at 17.30
TC: From 93 plf at 17.30 to 93 plf at 21.33
BC: From 20 plf at 0.00 to 20 plf at 2.70
BC: From 10 plf at 2.70 to 10 plf at 17.30
BC: From 20 plf at 17.30 to 20 plf at 20.33
BC: From 4 plf at 20.33 to 4 plf at 21.33
TC: 222 lb Conc. Load at 2.70,17.30
PLT: 111 lb Conc. Load at ( 4.73, 9.81), (6.73,9.81)
(8.73,9.81), (10.00,9.81), (11.27,9.81), (13.27,9.81)
(15.27,9.81)
BC: 85 lb Conc. Load at 2.70,17.30
BC: 55 lb Conc. Load at 4.73, 6.73, 8.73,10.00
11.27,13.27,15.27
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
See DWGS A18015ENC101014 & GBLLETIN0118
for more requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1841 /-/-/-/676 /-
AF 1941 /-/-/-/729 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
AF Brg Width = 7.6 Min Req =1.6
Bearings A & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1272 -3452
B - C 892 -2438
C - D 807 -2294
D - E 816 -2311
E - F 819 -2319
F - G 797 -2270
Chords Tens.Comp.
G - H 797 -2269
H - I 820 -2321
I - J 815 -2308
J - K 804 -2286
K - L 885 -2420
L - M 1277 -3475
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 3089 -1133
S - R 3067 -1116
R - Q 3396 -1216
Chords Tens.Comp.
Q - P 3493 -1250
P - O 3086 -1117
O - M 3094 -1129
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 459 -1275
U - V 459 -1275
V - W 462 -1282
W -Q 434 -1154
G - Z 1450 -472
Q -AC 471 -1260
Webs Tens.Comp.
Z - Q 1158 -340
AC-AD 496 -1379
P - L 441 -131
AD-AE 492 -1371
AE- L 491 -1370
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.136 K 999 360
VERT(CL):0.245 K 990 240
HORZ(LL):0.046 O - -
HORZ(TL):0.083 O - -
Creep Factor: 2.0
Max TC CSI:0.549
Max BC CSI:0.670
Max Web CSI:0.328
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T24
Ply: 1
Qty:1
SEQN:185768 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T45
DrwNo:221.21.1135.41993
AK /WHK 08/09/2021
T3
20'4"
4'8"1'4"
(TYP)
3'5"2
3'5"2
10'
6'6"14
17'3"5
7'3"5
20'4"
3'0"11
2'9"12
2'9"12
6'3"2
3'5"6
10'
3'8"14
13'8"14
3'8"14
17'2"4
3'5"6
20'4"
3'1"12 1'
7"14 6"34'9"145'0"78'1"
A
B
C
D
E
F
G
H
I
J
K L
M
N
OPQRS
U VW Z AC AD
AE
AF
5 12
7X6(E4)
5X8
3X43X4
4X4
3X85X8 3X43X4
5X8
4X7(B2)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T3 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.000'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at 0.00 to 93 plf at 2.70
TC: From 76 plf at 2.70 to 76 plf at 17.30
TC: From 93 plf at 17.30 to 93 plf at 21.33
BC: From 20 plf at 0.00 to 20 plf at 2.70
BC: From 10 plf at 2.70 to 10 plf at 17.30
BC: From 20 plf at 17.30 to 20 plf at 20.33
BC: From 4 plf at 20.33 to 4 plf at 21.33
TC: 222 lb Conc. Load at 2.70,17.30
PLT: 111 lb Conc. Load at ( 4.73, 9.81), (6.73,9.81)
(8.73,9.81), (10.00,9.81), (11.27,9.81), (13.27,9.81)
(15.27,9.81)
BC: 85 lb Conc. Load at 2.70,17.30
BC: 55 lb Conc. Load at 4.73, 6.73, 8.73,10.00
11.27,13.27,15.27
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
See DWGS A18015ENC101014 & GBLLETIN0118
for more requirements.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1841 /-/-/-/676 /-
AF 1941 /-/-/-/729 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
AF Brg Width = 7.6 Min Req =1.6
Bearings A & M are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 1272 -3452
B - C 892 -2438
C - D 807 -2294
D - E 816 -2311
E - F 819 -2319
F - G 797 -2270
Chords Tens.Comp.
G - H 797 -2269
H - I 820 -2321
I - J 815 -2308
J - K 804 -2286
K - L 885 -2420
L - M 1277 -3475
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - S 3089 -1133
S - R 3067 -1116
R - Q 3396 -1216
Chords Tens.Comp.
Q - P 3493 -1250
P - O 3086 -1117
O - M 3094 -1129
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - U 459 -1275
U - V 459 -1275
V - W 462 -1282
W -Q 434 -1154
G - Z 1450 -472
Q -AC 471 -1260
Webs Tens.Comp.
Z - Q 1158 -340
AC-AD 496 -1379
P - L 441 -131
AD-AE 492 -1371
AE- L 491 -1370
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.136 K 999 360
VERT(CL):0.245 K 990 240
HORZ(LL):0.046 O - -
HORZ(TL):0.083 O - -
Creep Factor: 2.0
Max TC CSI:0.549
Max BC CSI:0.670
Max Web CSI:0.328
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T24
Ply: 1
Qty:1
SEQN:185768 HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T45
DrwNo:221.21.1135.41993
AK /WHK 08/09/2021
T3
20'4"
4'8"1'4"
(TYP)
3'5"2
3'5"2
10'
6'6"14
17'3"5
7'3"5
20'4"
3'0"11
2'9"12
2'9"12
6'3"2
3'5"6
10'
3'8"14
13'8"14
3'8"14
17'2"4
3'5"6
20'4"
3'1"12 1'
7"14 6"34'9"145'0"78'1"
A
B
C
D
E
F
G
H
I
J
K L
M
N
OPQRS
U VW Z AC AD
AE
AF
5 12
7X6(E4)
5X8
3X43X4
4X4
3X85X8 3X43X4
5X8
4X7(B2)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.000'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1135 /-/-/587 /439 /182
K 1250 /-/-/683 /486 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
K Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 802 -2092
B - C 651 -1522
Chords Tens.Comp.
C - D 648 -1517
D - E 810 -2093
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 1843 -651
I - H 1840 -653
Chords Tens.Comp.
H - G 1835 -653
G - E 1836 -651
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 310 -577
C - H 636 -243
Webs Tens.Comp.
H - D 311 -572
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 D 999 360
VERT(CL):0.163 D 999 240
HORZ(LL):0.037 G - -
HORZ(TL):0.069 G - -
Creep Factor: 2.0
Max TC CSI:0.635
Max BC CSI:0.768
Max Web CSI:0.315
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T25
Ply: 1
Qty:1
SEQN:185931 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T1
DrwNo:221.21.1135.44393
AK /WHK 08/09/2021
20'4"
5'0"3
5'0"3
10'
4'11"13
14'11"13
4'11"13
20'4"
5'4"3
4'10"7
4'10"7
10'
5'1"9
15'1"9
5'1"9
20'4"
5'2"7 1'
7"14 6"34'9"145'0"78'1"
A
B
C
D
E
F
GHI K
5
12
6X6(E1)1.5X4
3X4
4X4
5X8
3X4
1.5X4 4X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.000'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
A 1135 /-/-/587 /439 /182
K 1250 /-/-/683 /486 /-
Wind reactions based on MWFRS
A Brg Width = 3.6 Min Req =1.5
K Brg Width = 7.6 Min Req =1.5
Bearings A & E are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 802 -2092
B - C 651 -1522
Chords Tens.Comp.
C - D 648 -1517
D - E 810 -2093
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - I 1843 -651
I - H 1840 -653
Chords Tens.Comp.
H - G 1835 -653
G - E 1836 -651
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - H 310 -577
C - H 636 -243
Webs Tens.Comp.
H - D 311 -572
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.088 D 999 360
VERT(CL):0.163 D 999 240
HORZ(LL):0.037 G - -
HORZ(TL):0.069 G - -
Creep Factor: 2.0
Max TC CSI:0.635
Max BC CSI:0.768
Max Web CSI:0.315
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T25
Ply: 1
Qty:1
SEQN:185931 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T1
DrwNo:221.21.1135.44393
AK /WHK 08/09/2021
20'4"
5'0"3
5'0"3
10'
4'11"13
14'11"13
4'11"13
20'4"
5'4"3
4'10"7
4'10"7
10'
5'1"9
15'1"9
5'1"9
20'4"
5'2"7 1'
7"14 6"34'9"145'0"78'1"
A
B
C
D
E
F
GHI K
5
12
6X6(E1)1.5X4
3X4
4X4
5X8
3X4
1.5X4 4X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1108 /-/-/566 /429 /180
M 1216 /-/-/669 /473 /-
Wind reactions based on MWFRS
L Brg Width = -Min Req =-
M Brg Width = 7.6 Min Req =1.5
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 700 -1806
C - D 615 -1438
Chords Tens.Comp.
D - E 615 -1435
E - F 780 -2018
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 1621 -564
I - H 1766 -625
Chords Tens.Comp.
H - F 1768 -623
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 439 -1066
B - J 1559 -569
C - I 245 -418
Webs Tens.Comp.
D - I 565 -211
I - E 313 -579
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.079 E 999 360
VERT(CL):0.147 E 999 240
HORZ(LL):0.030 H - -
HORZ(TL):0.056 H - -
Creep Factor: 2.0
Max TC CSI:0.615
Max BC CSI:0.847
Max Web CSI:0.352
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T26
Ply: 1
Qty:2
SEQN:185935 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T35
DrwNo:221.21.1135.46557
AK /WHK 08/09/2021
19'9"10
4"4
4"4
4'5"13
4'1"9
9'5"10
4'11"13
14'5"7
4'11"13
19'9"10
5'4"3
2"3
2"3
4'2"5
4'0"2
9'5"10
5'3"5
14'7"3
5'1"9
19'9"10
5'2"7 1'
10"8 6"34'9"145'0"78'1"
A B
C
D
E
F
G
HIJKL M
5 12
4X4
1.5X6(**)3X6
3X4
4X4
5X8
3X4
1.5X4 3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Hangers / Ties
(J) Hanger Support Required, by others
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1108 /-/-/566 /429 /180
M 1216 /-/-/669 /473 /-
Wind reactions based on MWFRS
L Brg Width = -Min Req =-
M Brg Width = 7.6 Min Req =1.5
Bearing F is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 700 -1806
C - D 615 -1438
Chords Tens.Comp.
D - E 615 -1435
E - F 780 -2018
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 1621 -564
I - H 1766 -625
Chords Tens.Comp.
H - F 1768 -623
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - K 439 -1066
B - J 1559 -569
C - I 245 -418
Webs Tens.Comp.
D - I 565 -211
I - E 313 -579
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.079 E 999 360
VERT(CL):0.147 E 999 240
HORZ(LL):0.030 H - -
HORZ(TL):0.056 H - -
Creep Factor: 2.0
Max TC CSI:0.615
Max BC CSI:0.847
Max Web CSI:0.352
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T26
Ply: 1
Qty:2
SEQN:185935 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T35
DrwNo:221.21.1135.46557
AK /WHK 08/09/2021
19'9"10
4"4
4"4
4'5"13
4'1"9
9'5"10
4'11"13
14'5"7
4'11"13
19'9"10
5'4"3
2"3
2"3
4'2"5
4'0"2
9'5"10
5'3"5
14'7"3
5'1"9
19'9"10
5'2"7 1'
10"8 6"34'9"145'0"78'1"
A B
C
D
E
F
G
HIJKL M
5 12
4X4
1.5X6(**)3X6
3X4
4X4
5X8
3X4
1.5X4 3X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1118 /-/-/836 /567 /186
N 1226 /-/-/715 /566 /-
Wind reactions based on MWFRS
M Brg Width = 3.0 Min Req =1.5
N Brg Width = 7.6 Min Req =1.5
Bearings M & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 707 -1360
B - C 889 -1798
C - D 727 -1456
Chords Tens.Comp.
D - E 715 -1457
E - F 988 -2034
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1528 -690
J - I 1655 -710
Chords Tens.Comp.
I - H 1779 -847
H - F 1781 -855
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - K 1475 -721
M - A 616 -1158
K - B 431 -939
Webs Tens.Comp.
C - I 218 -434
D - I 673 -489
I - E 377 -573
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.080 E 999 360
VERT(CL):0.149 E 999 240
HORZ(LL):0.032 H - -
HORZ(TL):0.060 H - -
Creep Factor: 2.0
Max TC CSI:0.624
Max BC CSI:0.847
Max Web CSI:0.333
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T27
Ply: 1
Qty:1
SEQN:185939 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T41
DrwNo:221.21.1135.48960
AK /WHK 08/09/2021
20'0"10
5"8
5"8
2'8"10
2'3"2
4'9"11
2'1"1
9'8"10
4'10"15
14'7"9
4'10"15
20'0"10
5'5"1
5"8
5"8
2'5"2
1'11"10
4'6"3
2'1"1
9'8"10
5'2"7
14'9"5
5'0"11
20'0"10
5'3"5 1'
7"4
1'3"10
6"34'9"145'0"78'8"4
8'1"
A B
C
D
E
F
G
HIJKL
M
N
5
12
4X8
3X8
1.5X4
3X6
5X5
3X4
3X4
4X4
5X8
3X4
1.5X4 3X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
M 1118 /-/-/836 /567 /186
N 1226 /-/-/715 /566 /-
Wind reactions based on MWFRS
M Brg Width = 3.0 Min Req =1.5
N Brg Width = 7.6 Min Req =1.5
Bearings M & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 707 -1360
B - C 889 -1798
C - D 727 -1456
Chords Tens.Comp.
D - E 715 -1457
E - F 988 -2034
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 1528 -690
J - I 1655 -710
Chords Tens.Comp.
I - H 1779 -847
H - F 1781 -855
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - K 1475 -721
M - A 616 -1158
K - B 431 -939
Webs Tens.Comp.
C - I 218 -434
D - I 673 -489
I - E 377 -573
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.080 E 999 360
VERT(CL):0.149 E 999 240
HORZ(LL):0.032 H - -
HORZ(TL):0.060 H - -
Creep Factor: 2.0
Max TC CSI:0.624
Max BC CSI:0.847
Max Web CSI:0.333
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T27
Ply: 1
Qty:1
SEQN:185939 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T41
DrwNo:221.21.1135.48960
AK /WHK 08/09/2021
20'0"10
5"8
5"8
2'8"10
2'3"2
4'9"11
2'1"1
9'8"10
4'10"15
14'7"9
4'10"15
20'0"10
5'5"1
5"8
5"8
2'5"2
1'11"10
4'6"3
2'1"1
9'8"10
5'2"7
14'9"5
5'0"11
20'0"10
5'3"5 1'
7"4
1'3"10
6"34'9"145'0"78'8"4
8'1"
A B
C
D
E
F
G
HIJKL
M
N
5
12
4X8
3X8
1.5X4
3X6
5X5
3X4
3X4
4X4
5X8
3X4
1.5X4 3X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.22" DL: 0.21". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 1467 /-/-/534 /445 /191
T 1558 /-/-/707 /489 /-
Wind reactions based on MWFRS
R Brg Width = 3.5 Min Req =1.5
T Brg Width = 7.6 Min Req =1.5
Bearings R & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 1539 -2645
H - I 959 -3984
A - B 693 -2030
B - C 737 -2270
C - D 1076 -4332
Chords Tens.Comp.
C - D 1753 -297
G - H 1591 -2796
H - I 1472 -202
I - J 825 -2786
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 2027 -535
O - N 2443 -606
N - M 2161 -499
Chords Tens.Comp.
M - L 2470 -672
L - J 2473 -673
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 2283 -618
R - A 545 -1486
B - P 329 -1234
B - O 921 -153
O - C 193 -1490
C - N 350 -1008
Webs Tens.Comp.
N - D 1788 -300
E - S 695 -2220
S - G 695 -2220
H - M 1055 -146
M - I 269 -568
L - I 70 -485
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.217 H 999 360
VERT(CL):0.401 H 600 240
HORZ(LL):-0.074 H - -
HORZ(TL):0.127 H - -
Creep Factor: 2.0
Max TC CSI:0.993
Max BC CSI:0.933
Max Web CSI:0.605
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T28
Ply: 1
Qty:1
SEQN:185942 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T43
DrwNo:221.21.1135.58233
AK /WHK 08/09/2021
B2 B4
8'1"3'2"1220'4"6
5'10"2
4'2"4
(TYP)
5"8
5"8
4'0"6
3'6"14
5'0"6
1'
8'0"13
3'0"7
20'4"6
12'3"9
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'4"6
4'4"2'8"14
6"33'8"42'0"94'9"145'0"710'1"
8'1"
A B C
D
E
F
G
H
I
J
K
LMNOPQ
R
S
T
5 12
4X122X6
1.5X4
3X5
6X123X5
8X83X3(**)
5X6
3X5
3X3
3X12
4X41.5X4
3X12 3X3
2X4
4X5
3X3(**)
H0510
10X10
4X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Truss designed for sleeping room only. No waterbeds
permitted. Provide information to contractor, architect,
and bldg owner. Trusses to be visibly stamped to
indicate 30.00 psf MAX LL.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.22" DL: 0.21". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
R 1467 /-/-/534 /445 /191
T 1558 /-/-/707 /489 /-
Wind reactions based on MWFRS
R Brg Width = 3.5 Min Req =1.5
T Brg Width = 7.6 Min Req =1.5
Bearings R & J are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 1539 -2645
H - I 959 -3984
A - B 693 -2030
B - C 737 -2270
C - D 1076 -4332
Chords Tens.Comp.
C - D 1753 -297
G - H 1591 -2796
H - I 1472 -202
I - J 825 -2786
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
P - O 2027 -535
O - N 2443 -606
N - M 2161 -499
Chords Tens.Comp.
M - L 2470 -672
L - J 2473 -673
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - P 2283 -618
R - A 545 -1486
B - P 329 -1234
B - O 921 -153
O - C 193 -1490
C - N 350 -1008
Webs Tens.Comp.
N - D 1788 -300
E - S 695 -2220
S - G 695 -2220
H - M 1055 -146
M - I 269 -568
L - I 70 -485
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.217 H 999 360
VERT(CL):0.401 H 600 240
HORZ(LL):-0.074 H - -
HORZ(TL):0.127 H - -
Creep Factor: 2.0
Max TC CSI:0.993
Max BC CSI:0.933
Max Web CSI:0.605
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T28
Ply: 1
Qty:1
SEQN:185942 SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T43
DrwNo:221.21.1135.58233
AK /WHK 08/09/2021
B2 B4
8'1"3'2"1220'4"6
5'10"2
4'2"4
(TYP)
5"8
5"8
4'0"6
3'6"14
5'0"6
1'
8'0"13
3'0"7
20'4"6
12'3"9
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'4"6
4'4"2'8"14
6"33'8"42'0"94'9"145'0"710'1"
8'1"
A B C
D
E
F
G
H
I
J
K
LMNOPQ
R
S
T
5 12
4X122X6
1.5X4
3X5
6X123X5
8X83X3(**)
5X6
3X5
3X3
3X12
4X41.5X4
3X12 3X3
2X4
4X5
3X3(**)
H0510
10X10
4X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.21" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1467 /-/-/531 /437 /205
V 1558 /-/-/720 /481 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
V Brg Width = 7.6 Min Req =1.5
Bearings T & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 323 -1808
F - G 1090 -164
J - K 905 -3874
A - B 534 -1515
B - C 573 -1709
C - F 552 -1738
D - E 93 -1131
Chords Tens.Comp.
D - E 803 -47
E - F 1443 -185
F - G 800 -2850
I - J 1533 -2725
J - K 1404 -180
K - L 807 -2785
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1517 -326
Q - P 1778 -385
P - O 2152 -473
Chords Tens.Comp.
O - N 2470 -656
N - L 2472 -657
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 1886 -480
T - A 590 -1429
B - R 307 -1275
B - Q 939 -180
Q - D 251 -1522
D - P 1302 -235
Webs Tens.Comp.
G - U 644 -2141
U - I 644 -2141
J - O 996 -123
O - K 267 -581
N - K 53 -443
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 J 999 360
VERT(CL):0.387 J 622 240
HORZ(LL):0.046 A - -
HORZ(TL):0.087 A - -
Creep Factor: 2.0
Max TC CSI:0.945
Max BC CSI:0.985
Max Web CSI:0.542
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T29
Ply: 1
Qty:1
SEQN:185947 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T44
DrwNo:221.21.1132.51326
SSB /WHK 08/09/2021
B2 B4
8'1"3'2"1220'4"6
5"8
5"8
4'0"6
3'6"14
4'10"10
10"4
7'0"6
2'1"12
8'0"13
1'0"7
10'0"6
1'11"9
11'11"15
1'11"9
20'4"6
8'4"7
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'4"6
4'4"2'1'6"146"33'8"42'0"94'9"145'0"710'1"
8'1"
A B CD E F
G
H
I
J
K
L
M
NOPQRS
T
U
V
5 12
5X82X6
1.5X4
3X5
6X123X5
1.5X4
7X8
3X3
5X6
1.5X4(**)
3X12
3X10
4X41.5X4
3X10 3X3
2X4
4X5
3X3(**)
H0510
10X10
4X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP #2;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.21" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1467 /-/-/531 /437 /205
V 1558 /-/-/720 /481 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
V Brg Width = 7.6 Min Req =1.5
Bearings T & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 323 -1808
F - G 1090 -164
J - K 905 -3874
A - B 534 -1515
B - C 573 -1709
C - F 552 -1738
D - E 93 -1131
Chords Tens.Comp.
D - E 803 -47
E - F 1443 -185
F - G 800 -2850
I - J 1533 -2725
J - K 1404 -180
K - L 807 -2785
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1517 -326
Q - P 1778 -385
P - O 2152 -473
Chords Tens.Comp.
O - N 2470 -656
N - L 2472 -657
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 1886 -480
T - A 590 -1429
B - R 307 -1275
B - Q 939 -180
Q - D 251 -1522
D - P 1302 -235
Webs Tens.Comp.
G - U 644 -2141
U - I 644 -2141
J - O 996 -123
O - K 267 -581
N - K 53 -443
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.206 J 999 360
VERT(CL):0.387 J 622 240
HORZ(LL):0.046 A - -
HORZ(TL):0.087 A - -
Creep Factor: 2.0
Max TC CSI:0.945
Max BC CSI:0.985
Max Web CSI:0.542
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T29
Ply: 1
Qty:1
SEQN:185947 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T44
DrwNo:221.21.1132.51326
SSB /WHK 08/09/2021
B2 B4
8'1"3'2"1220'4"6
5"8
5"8
4'0"6
3'6"14
4'10"10
10"4
7'0"6
2'1"12
8'0"13
1'0"7
10'0"6
1'11"9
11'11"15
1'11"9
20'4"6
8'4"7
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'4"6
4'4"2'1'6"146"33'8"42'0"94'9"145'0"710'1"
8'1"
A B CD E F
G
H
I
J
K
L
M
NOPQRS
T
U
V
5 12
5X82X6
1.5X4
3X5
6X123X5
1.5X4
7X8
3X3
5X6
1.5X4(**)
3X12
3X10
4X41.5X4
3X10 3X3
2X4
4X5
3X3(**)
H0510
10X10
4X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.22" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1467 /-/-/554 /444 /256
V 1558 /-/-/737 /475 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
V Brg Width = 7.6 Min Req =1.5
Bearings T & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 316 -940
J - K 808 -3603
A - B 455 -1210
B - C 486 -1357
C - G 461 -1322
D - E 0 -647
Chords Tens.Comp.
F - G 744 -177
G - H 211 -397
H - I 228 -508
I - J 1506 -2696
J - K 1224 -136
K - L 792 -2781
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1202 -193
Q - P 1451 -261
P - O 2072 -431
Chords Tens.Comp.
O - N 2467 -643
N - L 2468 -644
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 1687 -428
T - A 671 -1438
B - R 224 -1115
B - Q 880 -180
Q - D 497 -2021
Webs Tens.Comp.
D - P 1884 -463
F - U 474 -1663
U - I 474 -1663
J - O 826 -67
O - K 315 -676
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.220 J 999 360
VERT(CL):0.387 J 622 240
HORZ(LL):0.063 J - -
HORZ(TL):0.087 N - -
Creep Factor: 2.0
Max TC CSI:0.883
Max BC CSI:0.571
Max Web CSI:0.472
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T30
Ply: 1
Qty:1
SEQN:185952 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T39
DrwNo:221.21.1132.51124
SSB /WHK 08/09/2021
B2 B4
8'1"3'2"1220'4"6
5'10"2 4'2"4
(TYP)
5"8
5"8
4'0"6
3'6"14
4'10"10
10"4
8'0"13
3'2"3
9'0"6
11"9
20'4"6
11'4"
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'4"6
4'4"2'2'4"146"33'8"42'0"94'9"145'0"710'1"
8'1"
A B CD E F G
H
I
J
K
L
M
NOPQRS
T
U
V
5 12
5X8
2X61.5X4
3X4
7X104X5
1.5X4
7X8
3X3
7X6
1.5X4(**)3X3
3X101.5X4
4X41.5X4
3X10
3X3 1.5X4(**)
3X4
3X3
H0510
10X10
4X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 2 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.22" DL: 0.20". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
T 1467 /-/-/554 /444 /256
V 1558 /-/-/737 /475 /-
Wind reactions based on MWFRS
T Brg Width = 3.5 Min Req =1.5
V Brg Width = 7.6 Min Req =1.5
Bearings T & L are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
E - F 316 -940
J - K 808 -3603
A - B 455 -1210
B - C 486 -1357
C - G 461 -1322
D - E 0 -647
Chords Tens.Comp.
F - G 744 -177
G - H 211 -397
H - I 228 -508
I - J 1506 -2696
J - K 1224 -136
K - L 792 -2781
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
R - Q 1202 -193
Q - P 1451 -261
P - O 2072 -431
Chords Tens.Comp.
O - N 2467 -643
N - L 2468 -644
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - R 1687 -428
T - A 671 -1438
B - R 224 -1115
B - Q 880 -180
Q - D 497 -2021
Webs Tens.Comp.
D - P 1884 -463
F - U 474 -1663
U - I 474 -1663
J - O 826 -67
O - K 315 -676
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.220 J 999 360
VERT(CL):0.387 J 622 240
HORZ(LL):0.063 J - -
HORZ(TL):0.087 N - -
Creep Factor: 2.0
Max TC CSI:0.883
Max BC CSI:0.571
Max Web CSI:0.472
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T30
Ply: 1
Qty:1
SEQN:185952 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T39
DrwNo:221.21.1132.51124
SSB /WHK 08/09/2021
B2 B4
8'1"3'2"1220'4"6
5'10"2 4'2"4
(TYP)
5"8
5"8
4'0"6
3'6"14
4'10"10
10"4
8'0"13
3'2"3
9'0"6
11"9
20'4"6
11'4"
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'4"6
4'4"2'2'4"146"33'8"42'0"94'9"145'0"710'1"
8'1"
A B CD E F G
H
I
J
K
L
M
NOPQRS
T
U
V
5 12
5X8
2X61.5X4
3X4
7X104X5
1.5X4
7X8
3X3
7X6
1.5X4(**)3X3
3X101.5X4
4X41.5X4
3X10
3X3 1.5X4(**)
3X4
3X3
H0510
10X10
4X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.35" DL: 0.29". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1467 /-/-/574 /462 /305
R 1558 /-/-/755 /478 /-
Wind reactions based on MWFRS
O Brg Width = 3.5 Min Req =1.5
R Brg Width = 7.6 Min Req =1.5
Bearings O & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - G 901 -3641
A - B 408 -990
B - C 558 -1619
C - D 501 -1147
Chords Tens.Comp.
D - E 1034 -1607
E - F 1427 -665
F - G 1571 -337
G - H 799 -2779
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1010 -116
L - K 1762 -315
Chords Tens.Comp.
K - J 2467 -649
J - H 2466 -649
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 1533 -404
O - A 772 -1499
B - M 480 -1987
B - L 2002 -464
L - P 263 -425
Webs Tens.Comp.
P - C 251 -394
P - Q 177 -484
Q - E 113 -640
F - K 702 -39
K - G 505 -1078
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.357 F 674 360
VERT(CL):0.614 F 392 240
HORZ(LL):0.138 F - -
HORZ(TL):0.156 F - -
Creep Factor: 2.0
Max TC CSI:0.882
Max BC CSI:0.711
Max Web CSI:0.853
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T31
Ply: 1
Qty:1
SEQN:185955 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T33
DrwNo:221.21.1132.51217
SSB /WHK 08/09/2021
T2
B2 B4
W5
8'1"3'2"1220'4"6
5"8
5"8
4'0"6
3'6"14
5'11"14
1'11"8
9'0"6
3'0"8
20'4"6
11'4"
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'1"14
4'1"8
20'4"6
2"8
1'2'3'2"146"3 4'11"14'5"142'0"95'5"710'1"
8'1"
A B C D
E
F
G
H
I
JKLMN
O
P Q
R
5
12
5X8
2X61.5X4
6X6
7X10 6X6
3X33X4 3X46X6
3X3 3X10
3X3 2X4(**)
3X4
3X3
H0510
10X10
4X5(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2; T2 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x6 SP 2400f-2.0E;
B4 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2; W5 2x4 SP 2250f-1.9E;
Lt Bearing Leg: 2x6 SP #2;
Plating Notes
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Attic room loading from 5-11-14 to 14-0-14: Live Load:
30 PSF. Dead Load: 10 PSF Ceiling: 0 PSF,
Kneewalls: 0 PSF
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Collar-tie braced with continuous lateral bracing at 24"
oc. or rigid ceiling.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left end vertical not exposed to wind pressure.
Wind loading based on both gable and hip roof types.
Deflection
Max JT VERT DEFL: LL: 0.35" DL: 0.29". See detail
DEFLCAMB1014 for camber recommendations.
Provide for adequate drainage of roof.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
O 1467 /-/-/574 /462 /305
R 1558 /-/-/755 /478 /-
Wind reactions based on MWFRS
O Brg Width = 3.5 Min Req =1.5
R Brg Width = 7.6 Min Req =1.5
Bearings O & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
F - G 901 -3641
A - B 408 -990
B - C 558 -1619
C - D 501 -1147
Chords Tens.Comp.
D - E 1034 -1607
E - F 1427 -665
F - G 1571 -337
G - H 799 -2779
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
M - L 1010 -116
L - K 1762 -315
Chords Tens.Comp.
K - J 2467 -649
J - H 2466 -649
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - M 1533 -404
O - A 772 -1499
B - M 480 -1987
B - L 2002 -464
L - P 263 -425
Webs Tens.Comp.
P - C 251 -394
P - Q 177 -484
Q - E 113 -640
F - K 702 -39
K - G 505 -1078
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE, HS
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.357 F 674 360
VERT(CL):0.614 F 392 240
HORZ(LL):0.138 F - -
HORZ(TL):0.156 F - -
Creep Factor: 2.0
Max TC CSI:0.882
Max BC CSI:0.711
Max Web CSI:0.853
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T31
Ply: 1
Qty:1
SEQN:185955 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T33
DrwNo:221.21.1132.51217
SSB /WHK 08/09/2021
T2
B2 B4
W5
8'1"3'2"1220'4"6
5"8
5"8
4'0"6
3'6"14
5'11"14
1'11"8
9'0"6
3'0"8
20'4"6
11'4"
5"8
5"8
4'0"6
3'6"14
16'0"6
12'
20'1"14
4'1"8
20'4"6
2"8
1'2'3'2"146"3 4'11"14'5"142'0"95'5"710'1"
8'1"
A B C D
E
F
G
H
I
JKLMN
O
P Q
R
5
12
5X8
2X61.5X4
6X6
7X10 6X6
3X33X4 3X46X6
3X3 3X10
3X3 2X4(**)
3X4
3X3
H0510
10X10
4X5(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 3.011'
Rt Slider: 2x4 SP #2; block length = 3.011'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 92 plf at -1.00 to 92 plf at 3.03
TC: From 76 plf at 3.03 to 76 plf at 17.44
TC: From 93 plf at 17.44 to 93 plf at 21.47
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.03
BC: From 10 plf at 3.03 to 10 plf at 17.44
BC: From 20 plf at 17.44 to 20 plf at 20.47
BC: From 4 plf at 20.47 to 4 plf at 21.47
TC: 163 lb Conc. Load at 3.03,17.44
PLT: 98 lb Conc. Load at ( 5.06,13.81), (7.06,13.81)
(9.06,13.81), (10.23,13.81), (11.41,13.81), (13.41,13.81)
(15.41,13.81)
BC: -9 lb Conc. Load at 3.03,17.44
BC: 22 lb Conc. Load at 5.06, 7.06, 9.06,10.23
11.41,13.41,15.41
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1649 /-/-/-/774 /-
N 1617 /-/-/-/759 /-
Wind reactions based on MWFRS
B Brg Width = 5.3 Min Req =1.5
N Brg Width = 4.0 Min Req =1.5
Bearings B & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1196 -2460
C - D 884 -1845
D - E 809 -1726
E - F 815 -1740
F - G 819 -1747
G - H 799 -1706
Chords Tens.Comp.
H - I 799 -1706
I - J 819 -1747
J - K 815 -1740
K - L 809 -1726
L - M 883 -1844
M - N 1245 -2601
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2088 -998
T - S 2065 -981
S - R 2562 -1204
Chords Tens.Comp.
R - Q 2632 -1237
Q - P 2229 -1058
P - N 2248 -1072
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 446 -945
C - S 512 -227
U - V 446 -945
V - W 449 -951
W -R 365 -767
R -AC 401 -843
Webs Tens.Comp.
H - Z 1054 -482
Z - R 762 -350
AC-AD 485 -1027
Q - M 417 -183
AD-AE 482 -1021
AE- M 481 -1021
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.081 K 999 360
VERT(CL):0.143 K 999 240
HORZ(LL):0.028 P - -
HORZ(TL):0.049 P - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.402
Max Web CSI:0.390
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T32
Ply: 1
Qty:1
SEQN:185782 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T40
DrwNo:221.21.1132.50968
SSB /WHK 08/09/2021
5"4 19'8"12 3"10
4'10"13 1'4"
(TYP)
3'9"2
3'9"2
10'2"13
6'5"11
17'5"4
7'2"7
20'5"10
3'0"6
3'1"12
3'1"12
6'6"8
3'4"12
10'2"13
3'8"5
13'11"1
3'8"4
17'3"14
3'4"12
20'5"10
3'1"121'1'
6"34'9"64'11"1512'1"A
B
C
D
E
F
G
H
I
J
K
L M
N
O
PQRST
U V W Z AC AD
AE
5
12
2X5(C3)3X4(C3)
5X10
3X43X4
4X4
3X85X8 3X43X4
5X10
2X5(C3)3X4(C3)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 3.011'
Rt Slider: 2x4 SP #2; block length = 3.011'
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 92 plf at -1.00 to 92 plf at 3.03
TC: From 76 plf at 3.03 to 76 plf at 17.44
TC: From 93 plf at 17.44 to 93 plf at 21.47
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.03
BC: From 10 plf at 3.03 to 10 plf at 17.44
BC: From 20 plf at 17.44 to 20 plf at 20.47
BC: From 4 plf at 20.47 to 4 plf at 21.47
TC: 163 lb Conc. Load at 3.03,17.44
PLT: 98 lb Conc. Load at ( 5.06,13.81), (7.06,13.81)
(9.06,13.81), (10.23,13.81), (11.41,13.81), (13.41,13.81)
(15.41,13.81)
BC: -9 lb Conc. Load at 3.03,17.44
BC: 22 lb Conc. Load at 5.06, 7.06, 9.06,10.23
11.41,13.41,15.41
Plating Notes
All plates are 1.5X4 except as noted.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads and reactions based on MWFRS.
Left and right cantilevers are exposed to wind
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 1649 /-/-/-/774 /-
N 1617 /-/-/-/759 /-
Wind reactions based on MWFRS
B Brg Width = 5.3 Min Req =1.5
N Brg Width = 4.0 Min Req =1.5
Bearings B & N are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 1196 -2460
C - D 884 -1845
D - E 809 -1726
E - F 815 -1740
F - G 819 -1747
G - H 799 -1706
Chords Tens.Comp.
H - I 799 -1706
I - J 819 -1747
J - K 815 -1740
K - L 809 -1726
L - M 883 -1844
M - N 1245 -2601
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - T 2088 -998
T - S 2065 -981
S - R 2562 -1204
Chords Tens.Comp.
R - Q 2632 -1237
Q - P 2229 -1058
P - N 2248 -1072
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - U 446 -945
C - S 512 -227
U - V 446 -945
V - W 449 -951
W -R 365 -767
R -AC 401 -843
Webs Tens.Comp.
H - Z 1054 -482
Z - R 762 -350
AC-AD 485 -1027
Q - M 417 -183
AD-AE 482 -1021
AE- M 481 -1021
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.081 K 999 360
VERT(CL):0.143 K 999 240
HORZ(LL):0.028 P - -
HORZ(TL):0.049 P - -
Creep Factor: 2.0
Max TC CSI:0.255
Max BC CSI:0.402
Max Web CSI:0.390
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T32
Ply: 1
Qty:1
SEQN:185782 /HIPS
FROM:
Cust: R 761 JRef:1X7T7610019 T40
DrwNo:221.21.1132.50968
SSB /WHK 08/09/2021
5"4 19'8"12 3"10
4'10"13 1'4"
(TYP)
3'9"2
3'9"2
10'2"13
6'5"11
17'5"4
7'2"7
20'5"10
3'0"6
3'1"12
3'1"12
6'6"8
3'4"12
10'2"13
3'8"5
13'11"1
3'8"4
17'3"14
3'4"12
20'5"10
3'1"121'1'
6"34'9"64'11"1512'1"A
B
C
D
E
F
G
H
I
J
K
L M
N
O
PQRST
U V W Z AC AD
AE
5
12
2X5(C3)3X4(C3)
5X10
3X43X4
4X4
3X85X8 3X43X4
5X10
2X5(C3)3X4(C3)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.000'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 531 /-/-/297 /234 /198
P 1371 /-/-/696 /435 /-
I 684 /-/-/468 /298 /-
Wind reactions based on MWFRS
B Brg Width = 5.3 Min Req =1.5
P Brg Width = 7.6 Min Req =1.6
I Brg Width = 3.5 Min Req =1.5
Bearings B, P, & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 413 -104
Chords Tens.Comp.
F - G 257 -508
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 399 -159
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 326 -500
P - D 379 -986
D - L 690 -215
L - K 419 -174
Webs Tens.Comp.
K - F 252 -501
J - G 419 -159
G - I 313 -644
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.035 P 223 360
VERT(CL):0.038 P 205 240
HORZ(LL):0.029 K - -
HORZ(TL):0.033 K - -
Creep Factor: 2.0
Max TC CSI:0.483
Max BC CSI:0.438
Max Web CSI:0.385
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T33
Ply: 1
Qty:1
SEQN:185905 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T29
DrwNo:221.21.1132.51060
SSB /WHK 08/09/2021
5"4 8'2"9 11'9"5
4'10"5
4'10"5
8'9"9
3'11"4
10'2"13
1'5"4
15'2"3
4'11"6
20'5"2
5'2"14
8'6"1
8'6"1
9'7"12
1'1"11
10'1"1
5"5
15'5"11
5'4"10
20'5"2
4'11"61'1'0"82'6"3
2'6"66'9"612'1"
10'1"
A
B
C
D
E
F
G
H
IJK
LM
NO
P
5
12
2X4(C3)3X4(C3)
1.5X4
3X4
3X4
1.5X41.5X4
4X4
4X4
3X4
3X4
3X4
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Lt Slider: 2x4 SP #2; block length = 2.000'
Wind
Wind loads based on MWFRS with additional C&C
member design.
Right end vertical not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Left bottom chord exposed to wind.
Laterally brace top chord below filler and bottom chord
above filler at 24" o.c., including a lateral brace
at chord ends (If no rigid diaphragm exists at that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 531 /-/-/297 /234 /198
P 1371 /-/-/696 /435 /-
I 684 /-/-/468 /298 /-
Wind reactions based on MWFRS
B Brg Width = 5.3 Min Req =1.5
P Brg Width = 7.6 Min Req =1.6
I Brg Width = 3.5 Min Req =1.5
Bearings B, P, & I are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
C - D 413 -104
Chords Tens.Comp.
F - G 257 -508
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 399 -159
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - P 326 -500
P - D 379 -986
D - L 690 -215
L - K 419 -174
Webs Tens.Comp.
K - F 252 -501
J - G 419 -159
G - I 313 -644
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):-0.035 P 223 360
VERT(CL):0.038 P 205 240
HORZ(LL):0.029 K - -
HORZ(TL):0.033 K - -
Creep Factor: 2.0
Max TC CSI:0.483
Max BC CSI:0.438
Max Web CSI:0.385
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T33
Ply: 1
Qty:1
SEQN:185905 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T29
DrwNo:221.21.1132.51060
SSB /WHK 08/09/2021
5"4 8'2"9 11'9"5
4'10"5
4'10"5
8'9"9
3'11"4
10'2"13
1'5"4
15'2"3
4'11"6
20'5"2
5'2"14
8'6"1
8'6"1
9'7"12
1'1"11
10'1"1
5"5
15'5"11
5'4"10
20'5"2
4'11"61'1'0"82'6"3
2'6"66'9"612'1"
10'1"
A
B
C
D
E
F
G
H
IJK
LM
NO
P
5
12
2X4(C3)3X4(C3)
1.5X4
3X4
3X4
1.5X41.5X4
4X4
4X4
3X4
3X4
3X4
4X4
1.5X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1283 /-/0 /693 /496 /198
H 1210 /-/-/647 /471 /-
Wind reactions based on MWFRS
L Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings L & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 429 -1046
C - D 508 -1030
Chords Tens.Comp.
D - E 508 -1031
E - F 475 -1167
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 909 -319
Chords Tens.Comp.
J - I 1017 -361
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 477 -1134
B - K 1080 -374
K - C 248 -461
Webs Tens.Comp.
I - F 1071 -373
F - H 486 -1164
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 C 999 360
VERT(CL):0.093 C 999 240
HORZ(LL):0.008 H - -
HORZ(TL):0.015 H - -
Creep Factor: 2.0
Max TC CSI:0.474
Max BC CSI:0.713
Max Web CSI:0.244
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T34
Ply: 1
Qty:5
SEQN:185909 /COMN
FROM:
Cust: R 761 JRef:1X7T7610019 T52
DrwNo:221.21.1132.51281
SSB /WHK 08/09/2021
W1
5"8 19'11"2
5'4"12
5'4"12
10'2"5
4'9"8
14'11"13
4'9"8
20'4"10
5'4"12
4'11"12
4'11"12
10'0"13
5'1"
15'1"13
5'1"
20'3"2
5'1"41'0"8 1'0"82'7"2'6"66'9"610'1"
A
B
C
D
E
F
G
HIJKL
5 12
3X6
5X6 3X4
3X4
4X4
5X8
3X4
3X4
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
L 1283 /-/0 /693 /496 /198
H 1210 /-/-/647 /471 /-
Wind reactions based on MWFRS
L Brg Width = 3.5 Min Req =1.5
H Brg Width = 3.5 Min Req =1.5
Bearings L & H are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 429 -1046
C - D 508 -1030
Chords Tens.Comp.
D - E 508 -1031
E - F 475 -1167
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
K - J 909 -319
Chords Tens.Comp.
J - I 1017 -361
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - L 477 -1134
B - K 1080 -374
K - C 248 -461
Webs Tens.Comp.
I - F 1071 -373
F - H 486 -1164
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.050 C 999 360
VERT(CL):0.093 C 999 240
HORZ(LL):0.008 H - -
HORZ(TL):0.015 H - -
Creep Factor: 2.0
Max TC CSI:0.474
Max BC CSI:0.713
Max Web CSI:0.244
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T34
Ply: 1
Qty:5
SEQN:185909 /COMN
FROM:
Cust: R 761 JRef:1X7T7610019 T52
DrwNo:221.21.1132.51281
SSB /WHK 08/09/2021
W1
5"8 19'11"2
5'4"12
5'4"12
10'2"5
4'9"8
14'11"13
4'9"8
20'4"10
5'4"12
4'11"12
4'11"12
10'0"13
5'1"
15'1"13
5'1"
20'3"2
5'1"41'0"8 1'0"82'7"2'6"66'9"610'1"
A
B
C
D
E
F
G
HIJKL
5 12
3X6
5X6 3X4
3X4
4X4
5X8
3X4
3X4
4X4
1.5X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 1179 /-/0 /607 /453 /162
F 1112 /-/-/564 /430 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 428 -1072
B - C 506 -1044
Chords Tens.Comp.
C - D 507 -1046
D - E 470 -1182
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 935 -341
Chords Tens.Comp.
H - G 1035 -380
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - J 437 -1038
A - I 1084 -387
I - B 249 -452
Webs Tens.Comp.
G - E 1086 -391
E - F 445 -1066
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.048 B 999 360
VERT(CL):0.089 B 999 240
HORZ(LL):0.009 F - -
HORZ(TL):0.016 F - -
Creep Factor: 2.0
Max TC CSI:0.511
Max BC CSI:0.657
Max Web CSI:0.245
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T34A
Ply: 1
Qty:1
SEQN:185916 /COMN
FROM:
Cust: R 761 JRef:1X7T7610019 T53
DrwNo:221.21.1132.51093
SSB /WHK 08/09/2021
W1
5"8 19'11"2
5'4"12
5'4"12
10'2"5
4'9"8
14'11"13
4'9"8
20'4"10
5'4"12
4'11"12
4'11"12
10'0"13
5'1"
15'1"13
5'1"
20'3"2
5'1"42'7"2'6"66'9"610'1"
A
B
C
D
E
FGHIJ
5
12
4X6
5X6 3X4
3X4
4X4
5X8
3X4
3X4
4X4
1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 1179 /-/0 /607 /453 /162
F 1112 /-/-/564 /430 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
A - B 428 -1072
B - C 506 -1044
Chords Tens.Comp.
C - D 507 -1046
D - E 470 -1182
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
I - H 935 -341
Chords Tens.Comp.
H - G 1035 -380
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
A - J 437 -1038
A - I 1084 -387
I - B 249 -452
Webs Tens.Comp.
G - E 1086 -391
E - F 445 -1066
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.048 B 999 360
VERT(CL):0.089 B 999 240
HORZ(LL):0.009 F - -
HORZ(TL):0.016 F - -
Creep Factor: 2.0
Max TC CSI:0.511
Max BC CSI:0.657
Max Web CSI:0.245
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T34A
Ply: 1
Qty:1
SEQN:185916 /COMN
FROM:
Cust: R 761 JRef:1X7T7610019 T53
DrwNo:221.21.1132.51093
SSB /WHK 08/09/2021
W1
5"8 19'11"2
5'4"12
5'4"12
10'2"5
4'9"8
14'11"13
4'9"8
20'4"10
5'4"12
4'11"12
4'11"12
10'0"13
5'1"
15'1"13
5'1"
20'3"2
5'1"42'7"2'6"66'9"610'1"
A
B
C
D
E
FGHIJ
5
12
4X6
5X6 3X4
3X4
4X4
5X8
3X4
3X4
4X4
1.5X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 1151 /-/-/550 /455 /108
F 1140 /-/-/541 /453 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 474 -1149
Chords Tens.Comp.
C - D 482 -1160
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 868 -329
I - H 863 -331
Chords Tens.Comp.
H - G 948 -381
G - F 952 -379
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 488 -1292
Webs Tens.Comp.
D - F 558 -1400
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.44 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.027 H 999 360
VERT(CL):0.051 H 999 240
HORZ(LL):0.016 F - -
HORZ(TL):0.030 F - -
Creep Factor: 2.0
Max TC CSI:0.917
Max BC CSI:0.479
Max Web CSI:0.530
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T35
Ply: 1
Qty:1
SEQN:185920 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T36
DrwNo:221.21.1132.51545
SSB /WHK 08/09/2021
W1
5"8 19'11"2
3'4"5
3'4"5
10'2"5
6'10"
17'0"5
6'10"
20'4"10
3'4"5
3'1"1
3'1"1
10'0"13
6'11"12
17'0"9
6'11"12
20'3"2
3'2"93'11"36'9"610'1"
A B
C
D E
FGHIJ
5
12
1.5X4
6X6 1.5X4
5X12
7X6
5X8
5X12
1.5X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 1151 /-/-/550 /455 /108
F 1140 /-/-/541 /453 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 474 -1149
Chords Tens.Comp.
C - D 482 -1160
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 868 -329
I - H 863 -331
Chords Tens.Comp.
H - G 948 -381
G - F 952 -379
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 488 -1292
Webs Tens.Comp.
D - F 558 -1400
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.44 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.027 H 999 360
VERT(CL):0.051 H 999 240
HORZ(LL):0.016 F - -
HORZ(TL):0.030 F - -
Creep Factor: 2.0
Max TC CSI:0.917
Max BC CSI:0.479
Max Web CSI:0.530
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T35
Ply: 1
Qty:1
SEQN:185920 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T36
DrwNo:221.21.1132.51545
SSB /WHK 08/09/2021
W1
5"8 19'11"2
3'4"5
3'4"5
10'2"5
6'10"
17'0"5
6'10"
20'4"10
3'4"5
3'1"1
3'1"1
10'0"13
6'11"12
17'0"9
6'11"12
20'3"2
3'2"93'11"36'9"610'1"
A B
C
D E
FGHIJ
5
12
1.5X4
6X6 1.5X4
5X12
7X6
5X8
5X12
1.5X4
1.5X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 1151 /-/-/537 /466 /76
F 1140 /-/-/536 /464 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 455 -1073
Chords Tens.Comp.
C - D 465 -1089
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 1002 -395
I - H 998 -396
Chords Tens.Comp.
H - G 1059 -431
G - F 1062 -429
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 524 -1327
Webs Tens.Comp.
D - F 559 -1383
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.86 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.032 H 999 360
VERT(CL):0.060 H 999 240
HORZ(LL):0.018 F - -
HORZ(TL):0.034 F - -
Creep Factor: 2.0
Max TC CSI:0.799
Max BC CSI:0.402
Max Web CSI:0.988
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T36
Ply: 1
Qty:1
SEQN:185924 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T54
DrwNo:221.21.1132.51514
SSB /WHK 08/09/2021
W1
5"8 19'11"2
5'4"5
5'4"5
10'2"5
4'10"
15'0"5
4'10"
20'4"10
5'4"5
5'1"1
5'1"1
10'0"13
4'11"12
15'0"9
4'11"12
20'3"2
5'2"94'9"36'9"6(a)
10'1"
A B
C
D E
FGHIJ
5 12
1.5X4
6X6 1.5X4
5X10(SRS)
4X4
5X8
5X12
1.5X4
1.5X4
6X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2; W1 2x6 SP #2;
Bracing
(a) 1x4 "T" reinforcement. 80% length of web
member. Same species & grade or better, attached
with 8d Box or Gun (0.113"x2.5",min.)nails @ 6" oc.
or (1) continuous lateral restraint equally spaced on
member.
Purlins
In lieu of structural panels use purlins to brace all flat
TC @ 24" oc.
Wind
Wind loads based on MWFRS with additional C&C
member design.
End verticals not exposed to wind pressure.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
J 1151 /-/-/537 /466 /76
F 1140 /-/-/536 /464 /-
Wind reactions based on MWFRS
J Brg Width = 3.5 Min Req =1.5
F Brg Width = 3.5 Min Req =1.5
Bearings J & F are a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 455 -1073
Chords Tens.Comp.
C - D 465 -1089
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
J - I 1002 -395
I - H 998 -396
Chords Tens.Comp.
H - G 1059 -431
G - F 1062 -429
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
J - B 524 -1327
Webs Tens.Comp.
D - F 559 -1383
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.86 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.032 H 999 360
VERT(CL):0.060 H 999 240
HORZ(LL):0.018 F - -
HORZ(TL):0.034 F - -
Creep Factor: 2.0
Max TC CSI:0.799
Max BC CSI:0.402
Max Web CSI:0.988
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T36
Ply: 1
Qty:1
SEQN:185924 /SPEC
FROM:
Cust: R 761 JRef:1X7T7610019 T54
DrwNo:221.21.1132.51514
SSB /WHK 08/09/2021
W1
5"8 19'11"2
5'4"5
5'4"5
10'2"5
4'10"
15'0"5
4'10"
20'4"10
5'4"5
5'1"1
5'1"1
10'0"13
4'11"12
15'0"9
4'11"12
20'3"2
5'2"94'9"36'9"6(a)
10'1"
A B
C
D E
FGHIJ
5 12
1.5X4
6X6 1.5X4
5X10(SRS)
4X4
5X8
5X12
1.5X4
1.5X4
6X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at -1.00 to 93 plf at 5.00
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.00
BC: From 4 plf at 4.00 to 4 plf at 5.00
TC: 108 lb Conc. Load at 2.00
BC: 41 lb Conc. Load at 2.00
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 396 /-/-/-/223 /-
D 396 /-/-/-/223 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 4.0 Min Req =1.5
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.47 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 F 999 360
VERT(CL):0.007 F 999 240
HORZ(LL):0.002 F - -
HORZ(TL):0.003 F - -
Creep Factor: 2.0
Max TC CSI:0.189
Max BC CSI:0.140
Max Web CSI:0.013
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:185902 /COMN
FROM:
Cust: R 761 JRef:1X7T7610019 T71
DrwNo:221.21.1132.51468
SSB /WHK 08/09/2021
4'
2'
2'
4'
2'
2'
2'
4'
2'1'1'
6"31'4"31'6"1320'9"A
B
C
D
E
F
5
12
3X4(B1)
4X4
1.5X4 3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at -1.00 to 93 plf at 5.00
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 4.00
BC: From 4 plf at 4.00 to 4 plf at 5.00
TC: 108 lb Conc. Load at 2.00
BC: 41 lb Conc. Load at 2.00
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 396 /-/-/-/223 /-
D 396 /-/-/-/223 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 4.0 Min Req =1.5
Bearings B & D are a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.47 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.004 F 999 360
VERT(CL):0.007 F 999 240
HORZ(LL):0.002 F - -
HORZ(TL):0.003 F - -
Creep Factor: 2.0
Max TC CSI:0.189
Max BC CSI:0.140
Max Web CSI:0.013
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:T37
Ply: 1
Qty:1
SEQN:185902 /COMN
FROM:
Cust: R 761 JRef:1X7T7610019 T71
DrwNo:221.21.1132.51468
SSB /WHK 08/09/2021
4'
2'
2'
4'
2'
2'
2'
4'
2'1'1'
6"31'4"31'6"1320'9"A
B
C
D
E
F
5
12
3X4(B1)
4X4
1.5X4 3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*112 /-/-/42 /24 /5
Wind reactions based on MWFRS
D Brg Width = 46.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.60 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.006 999 360
VERT(CL):0.011 999 240
HORZ(LL):-0.002 - -
HORZ(TL):0.004 - -
Creep Factor: 2.0
Max TC CSI:0.090
Max BC CSI:0.140
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:V1
Ply: 1
Qty:1
SEQN:185721 /VAL
FROM:
Cust: R 761 JRef:1X7T7610019 T55
DrwNo:221.21.1132.51312
SSB /WHK 08/09/2021
3'10"13
1'11"6
1'11"6
3'10"13
1'11"6
3'10"13
3'10"13
0"410"16'0"6
A
B
C
D
5
12
3X4(D1)
3X4
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
D*112 /-/-/42 /24 /5
Wind reactions based on MWFRS
D Brg Width = 46.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.60 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.006 999 360
VERT(CL):0.011 999 240
HORZ(LL):-0.002 - -
HORZ(TL):0.004 - -
Creep Factor: 2.0
Max TC CSI:0.090
Max BC CSI:0.140
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:V1
Ply: 1
Qty:1
SEQN:185721 /VAL
FROM:
Cust: R 761 JRef:1X7T7610019 T55
DrwNo:221.21.1132.51312
SSB /WHK 08/09/2021
3'10"13
1'11"6
1'11"6
3'10"13
1'11"6
3'10"13
3'10"13
0"410"16'0"6
A
B
C
D
5
12
3X4(D1)
3X4
3X4(D1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*112 /-/-/48 /35 /6
Wind reactions based on MWFRS
E Brg Width = 94.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 215 -458
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.19 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.012 D 999 360
VERT(CL):0.022 D 999 240
HORZ(LL):0.004 D - -
HORZ(TL):0.007 D - -
Creep Factor: 2.0
Max TC CSI:0.245
Max BC CSI:0.182
Max Web CSI:0.050
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:V2
Ply: 1
Qty:1
SEQN:185757 /VAL
FROM:
Cust: R 761 JRef:1X7T7610019 T56
DrwNo:221.21.1132.51014
SSB /WHK 08/09/2021
7'10"13
3'11"6
3'11"6
7'10"13
3'11"6
3'11"6
3'11"6
7'10"13
3'11"6
0"41'8"15'2"6
A
B
C
D
E
5
12
3X4(D1)
4X4
5X5
3X4(D1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
See DWGS VALTN160118 and VAL180160118 for
valley details.
Maximum Reactions (lbs), or *=PLF
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E*112 /-/-/48 /35 /6
Wind reactions based on MWFRS
E Brg Width = 94.8 Min Req =-
Bearing A is a rigid surface.
Members not listed have forces less than 375#
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
B - D 215 -458
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 16.19 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.012 D 999 360
VERT(CL):0.022 D 999 240
HORZ(LL):0.004 D - -
HORZ(TL):0.007 D - -
Creep Factor: 2.0
Max TC CSI:0.245
Max BC CSI:0.182
Max Web CSI:0.050
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:V2
Ply: 1
Qty:1
SEQN:185757 /VAL
FROM:
Cust: R 761 JRef:1X7T7610019 T56
DrwNo:221.21.1132.51014
SSB /WHK 08/09/2021
7'10"13
3'11"6
3'11"6
7'10"13
3'11"6
3'11"6
3'11"6
7'10"13
3'11"6
0"41'8"15'2"6
A
B
C
D
E
5
12
3X4(D1)
4X4
5X5
3X4(D1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 493 /-/-/317 /152 /190
D 128 /-/-/72 /-/-
C 285 /-/-/164 /189 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.025 D - -
Creep Factor: 2.0
Max TC CSI:0.541
Max BC CSI:0.505
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J1
Ply: 1
Qty:32
SEQN:185714 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T15
DrwNo:221.21.1131.15033
AK /WHK 08/09/2021
6'9"4
6'9"41'
6"3 3'4"13'6"108'1"
11'1"9
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 493 /-/-/317 /152 /190
D 128 /-/-/72 /-/-
C 285 /-/-/164 /189 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.013 D - -
HORZ(TL):0.025 D - -
Creep Factor: 2.0
Max TC CSI:0.541
Max BC CSI:0.505
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J1
Ply: 1
Qty:32
SEQN:185714 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T15
DrwNo:221.21.1131.15033
AK /WHK 08/09/2021
6'9"4
6'9"41'
6"3 3'4"13'6"108'1"
11'1"9
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 493 /-/-/317 /152 /190
F 122 /-/-/76 /8 /-
E 272 /-/-/160 /173 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.141 G 565 360
VERT(CL):0.260 G 307 240
HORZ(LL):0.048 J - -
HORZ(TL):0.088 J - -
Creep Factor: 2.0
Max TC CSI:0.477
Max BC CSI:0.462
Max Web CSI:0.137
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J1T
Ply: 1
Qty:5
SEQN:185730 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T57
DrwNo:221.21.1131.21090
AK /WHK 08/09/2021
11"11
11"11
6'9"4
5'9"9
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'9"4
4'0"141'
6"3 8"2'8"13'4"13'6"108'1"
8'9"
11'1"9
A
B
C D
E
F
GHIJ
5
12
3X4(B1)
3X3
1.5X4(**)1.5X6
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (3) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 493 /-/-/317 /152 /190
F 122 /-/-/76 /8 /-
E 272 /-/-/160 /173 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
F Brg Width = 1.5 Min Req =-
E Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.141 G 565 360
VERT(CL):0.260 G 307 240
HORZ(LL):0.048 J - -
HORZ(TL):0.088 J - -
Creep Factor: 2.0
Max TC CSI:0.477
Max BC CSI:0.462
Max Web CSI:0.137
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J1T
Ply: 1
Qty:5
SEQN:185730 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T57
DrwNo:221.21.1131.21090
AK /WHK 08/09/2021
11"11
11"11
6'9"4
5'9"9
11"11
11"11
1'5"15
6"4
2'8"6
1'2"7
6'9"4
4'0"141'
6"3 8"2'8"13'4"13'6"108'1"
8'9"
11'1"9
A
B
C D
E
F
GHIJ
5
12
3X4(B1)
3X3
1.5X4(**)1.5X6
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
D 55 /-/-/29 /-/-
C 111 /-/-/61 /80 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.146
Max BC CSI:0.082
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J2
Ply: 1
Qty:9
SEQN:185716 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T37
DrwNo:221.21.1131.23070
AK /WHK 08/09/2021
3'
3'1'
6"3 1'9"31'11"138'1"
9'6"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
D 55 /-/-/29 /-/-
C 111 /-/-/61 /80 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.146
Max BC CSI:0.082
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J2
Ply: 1
Qty:9
SEQN:185716 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T37
DrwNo:221.21.1131.23070
AK /WHK 08/09/2021
3'
3'1'
6"3 1'9"31'11"138'1"
9'6"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at -1.00 to 93 plf at 3.00
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.00
TC: 35 lb Conc. Load at -1.00
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 420 /-/-/262 /191 /95
D 22 /-49 /-/44 /17 /-
C 98 /-/-/59 /82 /-
Wind reactions based on MWFRS
E Brg Width = 5.2 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.313
Max BC CSI:0.372
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J2C
Ply: 1
Qty:9
SEQN:185754 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T49
DrwNo:221.21.1131.32790
AK /WHK 08/09/2021
5"4
3'
3'1'
6"3 1'9"31'11"1312'1"
13'6"11
A
B
C
DE
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Special Loads
------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)
TC: From 93 plf at -1.00 to 93 plf at 3.00
BC: From 4 plf at -1.00 to 4 plf at 0.00
BC: From 20 plf at 0.00 to 20 plf at 3.00
TC: 35 lb Conc. Load at -1.00
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 420 /-/-/262 /191 /95
D 22 /-49 /-/44 /17 /-
C 98 /-/-/59 /82 /-
Wind reactions based on MWFRS
E Brg Width = 5.2 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Varies by Ld Case
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.011 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.313
Max BC CSI:0.372
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J2C
Ply: 1
Qty:9
SEQN:185754 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T49
DrwNo:221.21.1131.32790
AK /WHK 08/09/2021
5"4
3'
3'1'
6"3 1'9"31'11"1312'1"
13'6"11
A
B
C
DE
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 245 /-/-/171 /111 /85
D 33 /-/-/17 /-/-
C 56 /-/-/25 /58 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.46 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.101
Max BC CSI:0.027
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J3
Ply: 1
Qty:2
SEQN:185715 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T67
DrwNo:221.21.1131.34990
AK /WHK 08/09/2021
1'11"4
1'11"41'
6"3 1'3"141'6"820'9"
21'9"6
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 245 /-/-/171 /111 /85
D 33 /-/-/17 /-/-
C 56 /-/-/25 /58 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.46 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.000 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.101
Max BC CSI:0.027
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:J3
Ply: 1
Qty:2
SEQN:185715 EJAC
FROM:
Cust: R 761 JRef:1X7T7610019 T67
DrwNo:221.21.1131.34990
AK /WHK 08/09/2021
1'11"4
1'11"41'
6"3 1'3"141'6"820'9"
21'9"6
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-9-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at TC
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 466 /-/-/-/186 /-
E 450 /-/0 /-/118 /0
D 363 /-/-/-/199 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 419 -1065
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 997 -390
Chords Tens.Comp.
G - F 986 -392
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 429 -1079
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 C 999 360
VERT(CL):0.110 C 999 240
HORZ(LL):0.011 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.899
Max BC CSI:0.897
Max Web CSI:0.386
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K1
Ply: 1
Qty:2
SEQN:185725 HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T17
DrwNo:221.21.1131.50697
AK /WHK 08/09/2021
5'1"3
5'1"3
9'6"14
4'5"11
4'11"7
4'11"7
8'10"6
3'10"15
9'6"14
8"81'5"
5"15 3'3"133'6"88'1"
11'1"5
A
B
C
D
EFG
3.54 12
2X4(A1)1.5X4
3X4
3X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Loading
Hipjack supports 6-9-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at TC
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 466 /-/-/-/186 /-
E 450 /-/0 /-/118 /0
D 363 /-/-/-/199 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - C 419 -1065
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
B - G 997 -390
Chords Tens.Comp.
G - F 986 -392
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - F 429 -1079
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.059 C 999 360
VERT(CL):0.110 C 999 240
HORZ(LL):0.011 C - -
HORZ(TL):0.020 C - -
Creep Factor: 2.0
Max TC CSI:0.899
Max BC CSI:0.897
Max Web CSI:0.386
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K1
Ply: 1
Qty:2
SEQN:185725 HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T17
DrwNo:221.21.1131.50697
AK /WHK 08/09/2021
5'1"3
5'1"3
9'6"14
4'5"11
4'11"7
4'11"7
8'10"6
3'10"15
9'6"14
8"81'5"
5"15 3'3"133'6"88'1"
11'1"5
A
B
C
D
EFG
3.54 12
2X4(A1)1.5X4
3X4
3X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 6-9-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at TC
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 466 /-/-/-/186 /-
G 414 /-/-/-/99 /-
F 398 /-/-/-/217 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
G Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 789 -1986
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - K 1801 -726
K - I 1957 -782
Chords Tens.Comp.
I - H 1928 -784
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 156 -391
Webs Tens.Comp.
E - H 803 -1974
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.152 E 746 360
VERT(CL):0.282 E 400 240
HORZ(LL):0.051 H - -
HORZ(TL):0.095 H - -
Creep Factor: 2.0
Max TC CSI:0.546
Max BC CSI:0.645
Max Web CSI:0.429
VIEW Ver: 20.02.01A.1209.11
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K1T
Ply: 1
Qty:1
SEQN:22880 HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T63
DrwNo:221.21.1132.07947
AK /WHK 08/09/2021
B2
1'5"9
1'5"9
4'6"3
3'0"11
9'6"14
5'0"11
1'5"9
1'5"9
2'1"10
8"2
3'9"13
1'8"2
4'4"7
6"11
8'3"9
3'11"2
9'6"14
1'3"51'5"
5"15 8"2'7"133'3"133'6"88'1"
8'9"
11'1"5
A
B
C D
E
F
GHI
JKLM
3.54 12
2X4(A1)
3X3
1.5X6(**)
3X5
4X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP 2250f-1.9E;
Bot chord: 2x4 SP #2; B2 2x4 SP 2250f-1.9E;
Webs: 2x4 SP #2;
Plating Notes
All plates are 1.5X4 except as noted.
(**) 1 plate(s) require special positioning. Refer to
scaled plate plot details for special positioning
requirements.
Loading
Hipjack supports 6-9-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Laterally brace top chord below filler and bottom
chord above filler at 24" o.c., including a lateral
brace at chord ends (If no rigid diaphragm exists at
that point).
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at TC
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 466 /-/-/-/186 /-
G 414 /-/-/-/99 /-
F 398 /-/-/-/217 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
G Brg Width = 1.5 Min Req =-
F Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Maximum Top Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - E 789 -1986
Maximum Bot Chord Forces Per Ply (lbs)
Chords Tens.Comp.
D - K 1801 -726
K - I 1957 -782
Chords Tens.Comp.
I - H 1928 -784
Maximum Web Forces Per Ply (lbs)
Webs Tens.Comp.
C - M 156 -391
Webs Tens.Comp.
E - H 803 -1974
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.152 E 746 360
VERT(CL):0.282 E 400 240
HORZ(LL):0.051 H - -
HORZ(TL):0.095 H - -
Creep Factor: 2.0
Max TC CSI:0.546
Max BC CSI:0.645
Max Web CSI:0.429
VIEW Ver: 20.02.01A.1209.11
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K1T
Ply: 1
Qty:1
SEQN:22880 HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T63
DrwNo:221.21.1132.07947
AK /WHK 08/09/2021
B2
1'5"9
1'5"9
4'6"3
3'0"11
9'6"14
5'0"11
1'5"9
1'5"9
2'1"10
8"2
3'9"13
1'8"2
4'4"7
6"11
8'3"9
3'11"2
9'6"14
1'3"51'5"
5"15 8"2'7"133'3"133'6"88'1"
8'9"
11'1"5
A
B
C D
E
F
GHI
JKLM
3.54 12
2X4(A1)
3X3
1.5X6(**)
3X5
4X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 132 /-/-/-/57 /-
D 30 /-/-/7 /-/-
C 111 /-/-/-/61 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.207
Max BC CSI:0.079
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K2
Ply: 1
Qty:2
SEQN:185748 /HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T38
DrwNo:221.21.1132.51296
SSB /WHK 08/09/2021
4'2"15
4'2"151'5"
5"15 1'8"151'11"108'1"
9'6"7
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 3-0-0 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 132 /-/-/-/57 /-
D 30 /-/-/7 /-/-
C 111 /-/-/-/61 /-
Wind reactions based on MWFRS
B Brg Width = 10.8 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.003 D - -
Creep Factor: 2.0
Max TC CSI:0.207
Max BC CSI:0.079
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K2
Ply: 1
Qty:2
SEQN:185748 /HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T38
DrwNo:221.21.1132.51296
SSB /WHK 08/09/2021
4'2"15
4'2"151'5"
5"15 1'8"151'11"108'1"
9'6"7
A
B
C
D
3.54 12
2X4(A1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
The following trusses need concentrated loads at the
end of their overhangs: 3-0-0 span/setback member
on the 0-5-4 cant side requires 34 lbs and the 3-0-0
span/setback member on the 0-5-4 cant side requires
34 lbs.
Sub-fascia beam assumptions: 4-0-0 sub-fascia beam
on the 0-5-4 cantilever side. 4-0-0 sub-fascia beam on
the 0-5-4 cantilever side.
Hipjack supports 3-0-0 setback jacks with 0-5-4
cantilever one face; 0-5-4 cantilever opposite face.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 269 /-/-/-/126 /-
D -/-31 /-/32 /-/-
C 66 /-/-/-/38 /-
Wind reactions based on MWFRS
E Brg Width = 7.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.031 D 360 360
VERT(CL):0.054 D 206 240
HORZ(LL):-0.014 C - -
HORZ(TL):0.024 C - -
Creep Factor: 2.0
Max TC CSI:0.381
Max BC CSI:0.359
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K2C
Ply: 1
Qty:2
SEQN:185751 /HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T51
DrwNo:221.21.1132.51404
SSB /WHK 08/09/2021
7"7
4'2"15
4'2"151'5"
5"15 1'8"151'11"1012'1"
13'6"7
A
B
C
DE
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
The following trusses need concentrated loads at the
end of their overhangs: 3-0-0 span/setback member
on the 0-5-4 cant side requires 34 lbs and the 3-0-0
span/setback member on the 0-5-4 cant side requires
34 lbs.
Sub-fascia beam assumptions: 4-0-0 sub-fascia beam
on the 0-5-4 cantilever side. 4-0-0 sub-fascia beam on
the 0-5-4 cantilever side.
Hipjack supports 3-0-0 setback jacks with 0-5-4
cantilever one face; 0-5-4 cantilever opposite face.
Wind
Wind loads and reactions based on MWFRS.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 269 /-/-/-/126 /-
D -/-31 /-/32 /-/-
C 66 /-/-/-/38 /-
Wind reactions based on MWFRS
E Brg Width = 7.4 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.031 D 360 360
VERT(CL):0.054 D 206 240
HORZ(LL):-0.014 C - -
HORZ(TL):0.024 C - -
Creep Factor: 2.0
Max TC CSI:0.381
Max BC CSI:0.359
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K2C
Ply: 1
Qty:2
SEQN:185751 /HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T51
DrwNo:221.21.1132.51404
SSB /WHK 08/09/2021
7"7
4'2"15
4'2"151'5"
5"15 1'8"151'11"1012'1"
13'6"7
A
B
C
DE
3.54 12
2X4(A1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 1-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 128 /-/-/-/78 /-
D 4 /-/-/7 /-/-
C 26 /-/-/-/20 /-
Wind reactions based on MWFRS
B Brg Width = 5.7 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.44 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.144
Max BC CSI:0.035
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K3
Ply: 1
Qty:4
SEQN:185897 /HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T70
DrwNo:221.21.1132.51406
SSB /WHK 08/09/2021
2'8"14
2'8"141'5"
5"15 1'3"101'6"520'9"
21'9"2
A
B
C
D
3.54 12
2X4(A1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Loading
Hipjack supports 1-11-4 setback jacks with no webs.
Wind
Wind loads and reactions based on MWFRS.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 128 /-/-/-/78 /-
D 4 /-/-/7 /-/-
C 26 /-/-/-/20 /-
Wind reactions based on MWFRS
B Brg Width = 5.7 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:0.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.44 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: NA
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: No
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.144
Max BC CSI:0.035
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:K3
Ply: 1
Qty:4
SEQN:185897 /HIP_
FROM:
Cust: R 761 JRef:1X7T7610019 T70
DrwNo:221.21.1132.51406
SSB /WHK 08/09/2021
2'8"14
2'8"141'5"
5"15 1'3"101'6"520'9"
21'9"2
A
B
C
D
3.54 12
2X4(A1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 227 /-/-/169 /111 /56
D 13 /-2 /-/10 /3 /-
C -/-16 /-/31 /34 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.27 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.100
Max BC CSI:0.016
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C1
Ply: 1
Qty:9
SEQN:185708 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T11
DrwNo:221.21.1128.30967
AK /WHK 08/09/2021
1'
1'1'
6"3 11"31'1"1320'9"
21'4"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 227 /-/-/169 /111 /56
D 13 /-2 /-/10 /3 /-
C -/-16 /-/31 /34 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 21.27 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.100
Max BC CSI:0.016
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C1
Ply: 1
Qty:9
SEQN:185708 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T11
DrwNo:221.21.1128.30967
AK /WHK 08/09/2021
1'
1'1'
6"3 11"31'1"1320'9"
21'4"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -372# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 586 /-/-/473 /259 /44
D -/-372 /-/165 /292 /-
C -/-5 /-/25 /28 /-
Wind reactions based on MWFRS
E Brg Width = 5.2 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.007 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.246
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C1C
Ply: 1
Qty:2
SEQN:185718 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T46
DrwNo:221.21.1128.33357
AK /WHK 08/09/2021
5"4
1'
1'1'
6"3 11"31'1"1312'1"
12'8"11
A
B
C
DE
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -372# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 586 /-/-/473 /259 /44
D -/-372 /-/165 /292 /-
C -/-5 /-/25 /28 /-
Wind reactions based on MWFRS
E Brg Width = 5.2 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.007 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.246
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C1C
Ply: 1
Qty:2
SEQN:185718 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T46
DrwNo:221.21.1128.33357
AK /WHK 08/09/2021
5"4
1'
1'1'
6"3 11"31'1"1312'1"
12'8"11
A
B
C
DE
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
D 55 /-/-/29 /-/-
C 111 /-/-/61 /80 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.146
Max BC CSI:0.082
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C2
Ply: 1
Qty:2
SEQN:185709 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T10
DrwNo:221.21.1128.55817
AK /WHK 08/09/2021
3'
3'1'
6"3 1'9"31'11"138'1"
9'6"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
D 55 /-/-/29 /-/-
C 111 /-/-/61 /80 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.146
Max BC CSI:0.082
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C2
Ply: 1
Qty:2
SEQN:185709 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T10
DrwNo:221.21.1128.55817
AK /WHK 08/09/2021
3'
3'1'
6"3 1'9"31'11"138'1"
9'6"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
E 22 /-/-/15 /9 /-
D 120 /-/-/74 /65 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.006 F 999 360
VERT(CL):0.011 F 999 240
HORZ(LL):-0.003 C - -
HORZ(TL):0.005 C - -
Creep Factor: 2.0
Max TC CSI:0.155
Max BC CSI:0.049
Max Web CSI:0.028
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C2T
Ply: 1
Qty:1
SEQN:185736 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T59
DrwNo:221.21.1128.58077
AK /WHK 08/09/2021
2'3"2
2'3"2
3'
8"14
2'8"6
2'8"6
3'
3"101'
6"3 8"1'1"31'9"31'11"138'1"
8'9"
9'6"11
A
B
C
D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
E 22 /-/-/15 /9 /-
D 120 /-/-/74 /65 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.006 F 999 360
VERT(CL):0.011 F 999 240
HORZ(LL):-0.003 C - -
HORZ(TL):0.005 C - -
Creep Factor: 2.0
Max TC CSI:0.155
Max BC CSI:0.049
Max Web CSI:0.028
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C2T
Ply: 1
Qty:1
SEQN:185736 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T59
DrwNo:221.21.1128.58077
AK /WHK 08/09/2021
2'3"2
2'3"2
3'
8"14
2'8"6
2'8"6
3'
3"101'
6"3 8"1'1"31'9"31'11"138'1"
8'9"
9'6"11
A
B
C
D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
D 95 /-/-/53 /-/-
C 203 /-/-/116 /137 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.006 D - -
HORZ(TL):0.011 D - -
Creep Factor: 2.0
Max TC CSI:0.533
Max BC CSI:0.268
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C3
Ply: 1
Qty:2
SEQN:185710 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T9
DrwNo:221.21.1129.00130
AK /WHK 08/09/2021
5'
5'1'
6"3 2'7"32'9"138'1"
10'4"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
D 95 /-/-/53 /-/-
C 203 /-/-/116 /137 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.006 D - -
HORZ(TL):0.011 D - -
Creep Factor: 2.0
Max TC CSI:0.533
Max BC CSI:0.268
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C3
Ply: 1
Qty:2
SEQN:185710 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T9
DrwNo:221.21.1129.00130
AK /WHK 08/09/2021
5'
5'1'
6"3 2'7"32'9"138'1"
10'4"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
E 64 /-/-/39 /2 /-
D 216 /-/-/130 /130 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 F 638 360
VERT(CL):0.168 F 348 240
HORZ(LL):0.040 C - -
HORZ(TL):0.074 C - -
Creep Factor: 2.0
Max TC CSI:0.636
Max BC CSI:0.122
Max Web CSI:0.102
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C3T
Ply: 1
Qty:1
SEQN:185733 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T60
DrwNo:221.21.1129.02327
AK /WHK 08/09/2021
2'3"2
2'3"2
5'
2'8"14
2'8"6
2'8"6
5'
2'3"101'
6"3 8"1'11"32'7"32'9"138'1"
8'9"
10'4"11
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
E 64 /-/-/39 /2 /-
D 216 /-/-/130 /130 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 F 638 360
VERT(CL):0.168 F 348 240
HORZ(LL):0.040 C - -
HORZ(TL):0.074 C - -
Creep Factor: 2.0
Max TC CSI:0.636
Max BC CSI:0.122
Max Web CSI:0.102
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C3T
Ply: 1
Qty:1
SEQN:185733 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T60
DrwNo:221.21.1129.02327
AK /WHK 08/09/2021
2'3"2
2'3"2
5'
2'8"14
2'8"6
2'8"6
5'
2'3"101'
6"3 8"1'11"32'7"32'9"138'1"
8'9"
10'4"11
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 227 /-/-/172 /90 /44
D 13 /-2 /-/9 /3 /-
C -/-16 /-/29 /31 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.100
Max BC CSI:0.016
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C4
Ply: 1
Qty:9
SEQN:185711 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T14
DrwNo:221.21.1129.06433
AK /WHK 08/09/2021
1'
1'1'
6"3 11"31'1"138'1"
8'8"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 227 /-/-/172 /90 /44
D 13 /-2 /-/9 /3 /-
C -/-16 /-/29 /31 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.000 C - -
HORZ(TL):0.001 C - -
Creep Factor: 2.0
Max TC CSI:0.100
Max BC CSI:0.016
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C4
Ply: 1
Qty:9
SEQN:185711 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T14
DrwNo:221.21.1129.06433
AK /WHK 08/09/2021
1'
1'1'
6"3 11"31'1"138'1"
8'8"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -372# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 586 /-/-/473 /259 /44
D -/-372 /-/165 /292 /-
C -/-5 /-/25 /28 /-
Wind reactions based on MWFRS
E Brg Width = 5.2 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.007 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.246
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C4CA
Ply: 1
Qty:1
SEQN:185719 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T47
DrwNo:221.21.1129.21740
AK /WHK 08/09/2021
5"4
1'
1'1'
6"3 11"31'1"1312'1"
12'8"11
A
B
C
DE
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Negative reaction(s) of -372# MAX. from a non-wind
load case requires uplift connection. See Maximum
Reactions.
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide ( 3 )16d- 0.162"x3.5" nails, toe nailed at BC
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
E 586 /-/-/473 /259 /44
D -/-372 /-/165 /292 /-
C -/-5 /-/25 /28 /-
Wind reactions based on MWFRS
E Brg Width = 5.2 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing E is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.007 C - -
HORZ(TL):0.013 C - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.246
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C4CA
Ply: 1
Qty:1
SEQN:185719 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T47
DrwNo:221.21.1129.21740
AK /WHK 08/09/2021
5"4
1'
1'1'
6"3 11"31'1"1312'1"
12'8"11
A
B
C
DE
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 379 /-/-/298 /160 /44
D -/-167 /-/73 /125 /-
C -/-3 /-/25 /27 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.004 C - -
HORZ(TL):0.007 C - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.174
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C4CB
Ply: 1
Qty:1
SEQN:185720 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T48
DrwNo:221.21.1129.24303
AK /WHK 08/09/2021
3"10
1'
1'1'
6"3 11"31'1"1312'1"
12'8"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Left cantilever is exposed to wind
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 379 /-/-/298 /160 /44
D -/-167 /-/73 /125 /-
C -/-3 /-/25 /27 /-
Wind reactions based on MWFRS
B Brg Width = 4.0 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.004 C - -
HORZ(TL):0.007 C - -
Creep Factor: 2.0
Max TC CSI:0.099
Max BC CSI:0.174
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C4CB
Ply: 1
Qty:1
SEQN:185720 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T48
DrwNo:221.21.1129.24303
AK /WHK 08/09/2021
3"10
1'
1'1'
6"3 11"31'1"1312'1"
12'8"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
D 55 /-/-/29 /-/-
C 111 /-/-/61 /80 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.146
Max BC CSI:0.082
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C5
Ply: 1
Qty:2
SEQN:185712 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T13
DrwNo:221.21.1129.26490
AK /WHK 08/09/2021
3'
3'1'
6"3 1'9"31'11"138'1"
9'6"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
D 55 /-/-/29 /-/-
C 111 /-/-/61 /80 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):-0.001 D - -
HORZ(TL):0.001 D - -
Creep Factor: 2.0
Max TC CSI:0.146
Max BC CSI:0.082
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C5
Ply: 1
Qty:2
SEQN:185712 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T13
DrwNo:221.21.1129.26490
AK /WHK 08/09/2021
3'
3'1'
6"3 1'9"31'11"138'1"
9'6"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
E 22 /-/-/15 /9 /-
D 120 /-/-/74 /65 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.006 F 999 360
VERT(CL):0.011 F 999 240
HORZ(LL):-0.003 C - -
HORZ(TL):0.005 C - -
Creep Factor: 2.0
Max TC CSI:0.155
Max BC CSI:0.049
Max Web CSI:0.028
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C5T
Ply: 1
Qty:1
SEQN:185739 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T58
DrwNo:221.21.1129.31473
AK /WHK 08/09/2021
2'3"2
2'3"2
3'
8"14
2'8"6
2'8"6
3'
3"101'
6"3 8"1'1"31'9"31'11"138'1"
8'9"
9'6"11
A
B
C
D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 292 /-/-/201 /94 /95
E 22 /-/-/15 /9 /-
D 120 /-/-/74 /65 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.006 F 999 360
VERT(CL):0.011 F 999 240
HORZ(LL):-0.003 C - -
HORZ(TL):0.005 C - -
Creep Factor: 2.0
Max TC CSI:0.155
Max BC CSI:0.049
Max Web CSI:0.028
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C5T
Ply: 1
Qty:1
SEQN:185739 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T58
DrwNo:221.21.1129.31473
AK /WHK 08/09/2021
2'3"2
2'3"2
3'
8"14
2'8"6
2'8"6
3'
3"101'
6"3 8"1'1"31'9"31'11"138'1"
8'9"
9'6"11
A
B
C
D
EFGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
D 95 /-/-/53 /-/-
C 203 /-/-/116 /137 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.006 D - -
HORZ(TL):0.011 D - -
Creep Factor: 2.0
Max TC CSI:0.533
Max BC CSI:0.268
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C6
Ply: 1
Qty:2
SEQN:185713 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T12
DrwNo:221.21.1129.33353
AK /WHK 08/09/2021
5'
5'1'
6"3 2'7"32'9"138'1"
10'4"11
A
B
C
D
5
12
3X4(B1)
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
D 95 /-/-/53 /-/-
C 203 /-/-/116 /137 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
D Brg Width = 1.5 Min Req =-
C Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):NA
VERT(CL):NA
HORZ(LL):0.006 D - -
HORZ(TL):0.011 D - -
Creep Factor: 2.0
Max TC CSI:0.533
Max BC CSI:0.268
Max Web CSI:0.000
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C6
Ply: 1
Qty:2
SEQN:185713 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T12
DrwNo:221.21.1129.33353
AK /WHK 08/09/2021
5'
5'1'
6"3 2'7"32'9"138'1"
10'4"11
A
B
C
D
5
12
3X4(B1)
08/09/2021
COA #0 278
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
E 64 /-/-/39 /2 /-
D 216 /-/-/130 /130 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 F 638 360
VERT(CL):0.168 F 348 240
HORZ(LL):0.040 C - -
HORZ(TL):0.074 C - -
Creep Factor: 2.0
Max TC CSI:0.636
Max BC CSI:0.122
Max Web CSI:0.102
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C6T
Ply: 1
Qty:1
SEQN:185742 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T62
DrwNo:221.21.1129.35387
AK /WHK 08/09/2021
2'3"2
2'3"2
5'
2'8"14
2'8"6
2'8"6
5'
2'3"101'
6"3 8"1'11"32'7"32'9"138'1"
8'9"
10'4"11
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
**WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAW ING!
**IMPORTANT**FURNISH THIS DRAW ING TO ALL CONTRACTORS INCLUDING THE INSTALLERS
Trusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information.
Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2.
For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org
6750 Forum Drive
Suite 305
Orlando FL, 32821
Lumber
Top chord: 2x4 SP #2;
Bot chord: 2x4 SP #2;
Webs: 2x4 SP #2;
Wind
Wind loads based on MWFRS with additional C&C
member design.
Wind loading based on both gable and hip roof types.
Additional Notes
Provide (2) 0.131"x3.0", min. toe-nails at top chord.
Provide (2) 0.131"x3.0", min. toe-nails at bottom chord.
Maximum Reactions (lbs)
Gravity Non-Gravity
Loc R+/ R-/ Rh / Rw / U / RL
B 397 /-/-/261 /124 /145
E 64 /-/-/39 /2 /-
D 216 /-/-/130 /130 /-
Wind reactions based on MWFRS
B Brg Width = 7.6 Min Req =1.5
E Brg Width = 1.5 Min Req =-
D Brg Width = 1.5 Min Req =-
Bearing B is a rigid surface.
Members not listed have forces less than 375#
Loading Criteria (psf)
TCLL:30.00
TCDL:15.00
BCLL:0.00
BCDL:10.00
Des Ld:55.00
NCBCLL:10.00
Soffit:2.00
Load Duration: 1.25
Spacing: 24.0 "
Wind Criteria
Wind Std:ASCE 7-16
Speed:170 mph
Enclosure: Closed
Risk Category: II
EXP: C Kzt: NA
Mean Height: 15.00 ft
TCDL: 4.0 psf
BCDL: 4.0 psf
MWFRS Parallel Dist: 0 to h/2
C&C Dist a: 3.00 ft
Loc. from endwall: Any
GCpi: 0.18
Wind Duration: 1.60
Snow Criteria (Pg,Pf in PSF)
Pg: NA Ct: NA CAT: NA
Pf: NA Ce: NA
Lu: NA Cs: NA
Snow Duration: NA
Building Code:
FBC 7th Ed. 2020 Res.
TPI Std:2014
Rep Fac: Yes
FT/RT:20(0)/5(0)
Plate Type(s):
WAVE
Defl/CSI Criteria
PP Deflection in loc L/defl L/#
VERT(LL):0.092 F 638 360
VERT(CL):0.168 F 348 240
HORZ(LL):0.040 C - -
HORZ(TL):0.074 C - -
Creep Factor: 2.0
Max TC CSI:0.636
Max BC CSI:0.122
Max Web CSI:0.102
VIEW Ver: 20.02.01A.1209.10
Job Number:21-0688
/GROZA BUILDERS, INC. / /BOVE-CALLAN RESIDENCE
Truss Label:C6T
Ply: 1
Qty:1
SEQN:185742 JACK
FROM:
Cust: R 761 JRef:1X7T7610019 T62
DrwNo:221.21.1129.35387
AK /WHK 08/09/2021
2'3"2
2'3"2
5'
2'8"14
2'8"6
2'8"6
5'
2'3"101'
6"3 8"1'11"32'7"32'9"138'1"
8'9"
10'4"11
A
B
C
D
E
FGH
5
12
3X4(B1)
3X3
1.5X4
1.5X4
08/09/2021
COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
08/09/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
08/09/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
08/09/2021COA #0 278
514 Earth City Expressway
Suite 242
Earth City, MO 63045
08/09/2021COA #0 278