Loading...
HomeMy WebLinkAboutTermite Treatment 2 i Planning &Development Services T 1 r- — Building &Code Regulation Division 2300 Virginia Ave o Fort Pierce, FL 34982 -- 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT a�aH-o-l�a. PERMIT #: 1 - v �a� JOB DRESS: CL I MLAl BUILDER/CONTRACTOR: / PEST CONTROL CONTRACTOR: EVICT-A-BUG ERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Chemicals used: DOMINION 2L Percentage of solution: .05 Total gallons used: Z/O Date of Treatment: 1 �� Time of Treatment: f 5 l--�o t g C_ i reatment c_VLT�reatment Re-Treat Re-Treat veway Pools S reatment ist Treatment R rat Re-Treat Other �Cl eri eter for Fin s coon 1�Treatm nt 7 ' Re-Treat i nature o ator Date Note: There must be a completed form for each requir treatm or re-treatment and this form must be on the job site to be picked up by the inspector at time of each in pection the scheduled inspection will fail and a re-inspection fee charged. FBC 104.2.E Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used,identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment, If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014