Loading...
HomeMy WebLinkAboutKSM Engineering & TestingA%IJAVA KELLER, SCHLEICHER & MacW.ILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1 377, SEBASTIAN, FL 32978-1377 . SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 WWW.k'smengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSM ENGINEERING. NET ST..LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 0 February 19, 2014 James Newman I JWN Construction 1701 S.E. Carvalho Street Port St. Lucie, Florida 34983 Re: Pile Installation Inspection 49 Nettle Boulevard Jensen Beach, Florida KSM. Project #: 140296 Dear Mr. Newman: As requested, we were present during the installation. of the twenty one (21) auger -cast -piles for the proposed structure at the referenced site. Pile layout by others. The pile installation inspection was generally performed in accordance to the "Inspector Guide to the Auger Cast -In -Place Piles", published by the Auger Cast -In -Place Pile Committee of The Deep Foundation Institute. Based on this inspection, it is our professional opinion, that.the piles constructed .for the. referenced project . were installed . as specified on the construction drawings. The pile documentation and Location Plan are attached. to be of assistance to you on this phase of your project. If you ft please feel free to call. JEK:km--- E-mail to: jwnconstruction@comcast.net Ronald G. Keller, P.E.: 372931 SI Lic. No.: 860 / . Julie E. Keller, P.E.: 68366 i%17iVA KELLER, SCHLEICHER & MacW.ILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 . PALM BEACH (561) 845-7445 wwwAsmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSMQKSMENGINEER] NG.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 Pile Installation Inspection 49 Nettle Boulevard Jensen Beach, Florida KSM Project #;. 140296 Date Installed: February 18, 2014 Pile Location (See Location Plan Pile Diameter Pile Depth Pump Strokes Truck No: Time Installed 1 14" 25' 29 22378 9:02 2 30 22378 9:20 3 31-- -- 22378 9:28 4 31 22378 9:40 5 33 22378 & 25316 10:08 6 32 25316 10:20 7 30 25316 10:29 8 29 25316 10:38 9 31 25316 10:50 10 32 25316 & 26433. 11:12 11 32 26433. 1130 12 28 26433 11:42 13 34 26433 11:52 14 30 26433 12:00 15 32 26433 & 25403 12:11 16 " 32 25403 12:26 17 32 25403 12:40 18 32 25403 12:52 19 33 25403 1:07 20 34 26433 1:57 21 32 26433 2:08 Notes: 1. Grout Strength: 5,000 p.s.i. (28 day compressive strength) 2. Pile Reinforcing: 4 - #5 and. 1 - #7 cont. with #4 Ties @ 12" o.c. 3. (1) Pump Stroke = 1.07 cu. ft. grout Ronald G. Keller, RE.: 37293 / SI Lic. No.: 860 / Julie E. Keller, RE.: 68366 KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 PO. BOX 78-1377, SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 - FAX (772) 589-6469 lGj EE A 1 1 \\ c 2 <: V, h \ D 1 A 1 / \\ \ e•TK `\\ LwR�AW m6w oEBd AS Y]EYOl TP \ SvQ0 ;z�IRP. :0o \ \ S�• \ EL \ IE11EA \ A \ \ EE mAre \ Tw. op EE C. i- \, PILF NDATION PLAN Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366