Loading...
HomeMy WebLinkAboutAPPROVED TRUSS LAYOUT 2110-0356 Ravinia 4 GL CAUTION ! ! ! DO NOT ATTEMPT TO ERECT 29' 10" TRUSSES WITHOUT REFERRING TO THE ENGINEERING DRAWINGS AND c i LO r- ti � rl- ti ti ti LO M BSCI-131 SUMMARY SHEETS. w w w w w w w w w U U U o ALL PERMANENT BRACING MUST BE IN PLACE PRIOR TO LOADING Hatch L egen d TRUSSES. (ie. SHEATHING, CJ11 — I I I I 1 N I CASHINGLES, ETC.) I CJ31 I I I j 1 < I I CJ3 ALL INTERIOR BEARING WALLS o --- I I 1 c I 11 MUST BE IN PLACE PRIOR TO � __-- I 1 j 1 I 8 '- 1 A . F. F INSTALLING TRUSSES. CJ51, a I I 1 v l I CJ5 114' 9' I I v I I REFER TO FINAL ENGINEERING ----- -- I 1 - SHEETS FOR THE FOLLOWING. in I boor- o ---- ----- I I 1 0 1) NUMBER OF GIRDER PLIES AND 2 NAILING SCHEDULE. o ----- ------- I 1 0 1 1 1 1 _ TRUSS END DETAIL 2) BEARING BLOCK REQUIREMENTS. 3 ----- --------- 1 - 3) SCAB DETAILS (IF REQUIRED) ---- 1 1 1 1 O 1 SQUARE CUT OVERHANG 12 4 4 �7 4) UPLIFT AND GRAVITY REACTIONS. o --------- ------- t� 5 WARNING 0 0 6-1/16" Backcharges Will Not Be Accepted 8'-1" CLNG _ 5 __ _---- HEEL HEIGHT Regardless of Fault Without Prior _ Notification By Customer Within 48 2/12 VAULT >>> o Hours And Investigation By ---- - 5 Builders FirstSource. o NO EXCEPTIONS. ---- ----------------- o 5 The General Contractor Is Responsible - ---- ----------------- - For All Connections Other Than Truss O O 1'-0" to Truss, Gable Shear Wall, And 5 ---- ---- --- Connections. Temporary and 0 7 o Permanent Bracing, And Ceiling And - ----------------------- - - Roof Diaphragm Connections. _ 6 o ----------------------- - o - in 6 g ----------------------- - 0 0 - ----------------------- - - 6 o ----------------------- - o 6 7 ---- - °0 7 - °0 8 0 111311 ---- - 121911 o o A9 --- 8'-1" CLNG O 8'-1" CLNG - A10 I Al 1 o I n 1 o BUILDER: Al2 SYNERGY HOMES A13 1 RES: NSA 1' 8 1/2" 11211 1 I 1 1 MODEL: RAVI N IA-4-G L _ 5 � 00 1 1 I I I _ in ADDRESS: B1 1 I I o CJ1 1 - SPEC: 0 B2 CITY: M M co Cl)O w w w w (j y��, COUNTY: B3 DRAWN BY: JL o JOB # . B3Xx a 0 HANGER LEGEND DATE: 03/20/21 SCALE: NTS B3 * - ALL 2x HANGERS SHOWN ARE HTU26 UNLESS NOTED 0 8'-1" CLNG OTHERWISE 64 00 * - ALL 4x2 FLOOR HANGERS SHOWN ARE HHUS46 REVISIONS: o ' UNLESS NOTED OTHERWISE 1. 04/02/21 ADD ENTRY BEAM B5 A 2. 3. MAIN WIND FORCE RESISTING SYSTEM/C-C HYBRID IMPORTANT CJ5 CJ5 WIND ASCE7-16 4• o ENCLOSED This Drawing Must Be Approved And CJ3 CJ3 EXPOSURE CATEGORY C Returned Before Fabrication Will OCCUPANCY CATEGORY II Begin. For Your Protection Check All WIND LOAD 170 MPH Dimensions And Conditions Prior To 011ders CA CJ1 *TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF Approval Of Plan. BOTTOM CHORD LIVE LOAD NONCONCURRENT WITH ANY OTHER LIVE LOADS SIGNATURE BELOW INDICATES ALL FirstSource � r L, I- ti I-, I- ,� Lo M y NOTES AND DIMENSIONS HAVE 1`� - - � `'� ROOF LOADING FLOOR LOADING BEEN ACCEPTED. U U U w w w w w U U U 211411 81611 TCLL: 20 PSF TCLL: PSF 701 S. KINGS HIGHWAY 29' 10" TCDL: 15 PSF TCDL: PSF FORT PIECE, FL 34945 BCDL: 10 PSF BCDL: PSF By Date Ph. (772) - 461 5475 TOTAL: 45 PSF TOTAL: PSF DURATION: 1.25 DURATION: