HomeMy WebLinkAboutPRODUCT APPROVAL SKYLIGHTSJJ
Business. & Professional Regiulaticia
BCIS Home 1 Log In � User Registration Hot Topics Submit Surcharge Stats & Facts I Publications ! ContacbUs BCIS Sife Map , Links Search
ba RECEIVED
@�I Product Approval
r USER: Publ(cUset
JAN 2.4 2022
Product Aopr va Menu > Product or Application Search > Application List > Application Detail
St: Lucie County
FL # FL20881-RS Permitting
+A
Application Type Affirmation
Code Version 2020
Application Status Approved
REVIEWED FOR
Comments CODE COMPLIANCE
Archived
ST. LUCIE COUNTY BOCC—
Product Manufacturer (Stiff
Address/Phone/Email 10303General Dr
Orlando, FL 32824
i (407) 859-2117 ,y 3
jfdudndr@sun-tek.com
Authorized Signature James Feudner FILE COPPN'
engineering@sun-tek.com
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email
Category Sky Lights
Subcategory Skylight
Coinpllance'Method Certification Mark or Listing
Certification Agency National Accreditation & Management Institute
Validated By National Accreditation & Management Institute
Referenced Standard and Year (of Standard) Standard Year
TAS201 1994
TAS202 1994
TA8203 1994
Equivalence of Product Standards
Certified By
I affirm that there are no changes In the new Florida Building
Code.which affect my products) and my product(s) are in
compliance with the new Florida Building Code.
Documentation from approved Evaluation or Validation Entity Yes No N/A
F1,20881 RS COC 'ICMGI 2020 FBC letter.W
I-20881 .RS COC IFGC 2020 FBC letter.'pd
Product Approval Method Method 1 Option A
Date Submitted 12/04/2020
Date Validated 12/04/2020
Date Pending FBC Approval
Date Approved 12/12/2020
Summary of Products
FL #
Model, Number or Name
Description
C2p8si.1
ICMGII
ICMGII (Impact) Aluminum Skylight
Limits of Use
Certification Agency. Certificate
Approved for use in HVHZ, Yes
FL20881 R5 C CAC NI01320-112 ICMGII.pdf
Approved for use outside HVHZ: Yes
Quality Assurance Contract Expiration Date
Impact Resistant: Yes
03/31/2022
Design Pressure: +60/-60
Installation Instructions
Other:
FL20881 R5 'II ICMGII installation lifst - Anoroved 6,21.16
L.pdf
Verified ,By: lames O Wells Jr. RE, RE, No. 53616
Created by Independent Third Party: Yes.
Evaluation Reports
FL20881 RS AE 2017FBCICMGII ,reWrt.pdf
Created by Independent Third Party: Yes
20881.2
IFGC
IFGC 4949 Flush Mounted Wood Skylight
Limits of Use
Certification Agency Certificate
Approved for use In HVHZ: Yes
FL20881 1115 .0 'CAC NI013293-113 IFGC.Ddf .
Approved for use outside HVHZ: Yes
Quality'Assuraince Contract Expiration Date
Impact Resistant: Yes
03/31/2022
Design Pressure: +60/-60
Installation Instructions
Other:
FL20881 R5 .II 12833F - IFGC Install Inst = Final - APproved
7.26.16 JW.pdf
Verified By; James D. Wells Jr, RE. No. 53616
Created by Independent Third Party: Yes
Evaluation Reports
FL20881 RS AE 2017FBC-IFGC report•pc1f
Created by Independent Third Party: Yes
Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824
The State of Florida is an AA/EEO employer.., Copyright 2007-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement
Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic
mall to this entity.. Instead, contact the office by phone or by traditional mall. If you have any questions, please contact 850.487.1395. iPPursuant to Section 455.275(1),
Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails
;provided may be used for official communication with the licensee. However emall.addresses are public record. If you do not wish to supply a personal address, please
provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here. .
Product Approval Accepts:
o � a : ECled. y-
Credit Card
Safe
l
NOTICE OF PRODUCT. CERTIFICATION
CERTIFICATION. NO:
DATE:
CERTIFICATION PROGRAM:
COMPANY:
CODE:
REVISION DATE:
N1013292-R1
07/06/2016
Structural
Sun -Talc
225-1
02/11 /2020
To verify that the "Notice -of Product Certification- is valid, please visit %vww.NAi*%7lCer1itication.com to assure that the
product is active and currently listed. This certification represents product conformity to (tie applicable specification and
that certification criteria'has been satisfied. A NAM[ approved certification label must be applied to the.product to claim
certification status. Please review and advise NAM[ if any corrections are required to this documeni.
COMPANY NAME AND ADDRESS
PRODUCT DESCRIPTION
Sun-Tek Manufacturing, Inc:
Series "ICMG II (Impact)"
10303 General Drive
Aluminum Skylight
Orlando, FL 32824
Configuration: O
Glazing: 1G-3/16" Iempered Glass/l/8" Annealed
Glass/0.090" Kuraray Butacite PVB.Interlayer/118"
Annealed Glass
Frame: W-1'283mnt(50.5") h1-1283mni(50.5")
PLO: W-:1162nun(4535") 1-1-11621nni(45.75")
SPECIFICATION
PRODUCT RATING
TAS 201/202/203-94
Design Pressure: 2873 Pa (60 psf)
)Pater Penctrallnn Resistance Tcst 'Presswe: 431 Pa (9.00 psq
Large Missile Impact Rated
Product Tested By: National Certified Testing Laboratories
Report No! NCTL,-210-4017-02A.
Expiration Date: March 31, 2012
Administrator's Signature:------------------
-
NATIONAL ACCREDITATION AND
MANAGEMENT INSTITUTE, INC.
4104 George Washington Memorial Higl»vay
Hayes, VA 23072
Tel: (804) 684-5124
Fax: (804) 684-5122
This item has been electronically
signed and sealed by James D.
Wells, Jr., P.E. on 6/21/2016 using
a Digital Signature.
Printed copies of this document
are not considered signed and
sealed and the signature must be
verified on any electronic copies.
James D Wells
n„..��
I attest to the
'-ft
accuracyand
integtityof
this document
2016.06.21
14:25:51
-04'00'
Engineer of Record:
James D. Wells, Jr., P.E.
Professional Engineer No. 53616
J 5L Wells Consulting LLC ��
1453 Arbitus Circle
Oviedo, Fl. 32765 SKY H T S
(407)496-5489
Certificate of AuthorizationNo.27162 � �.roG.�.,.Ca,eZ.'
CLEANING YOUR SKYLIGHT: SYS 1000 Caulk - Use only between decking and underside of skylight flange on
use a mild soap and water or glass cleaners only. Fresh paint splashes, glazing .Glass Series. Not necessary on CMIG2
compound, etc. maybe removed by rubbing lightly with a soft cloth or cotton ball
soaked in ml, eral spirits
ACCESSORIES: Step Flash Kit -Pre -formed, precut flashing eliminates need (or flashing on self -built
'&'SlyiightSh4des-a varieryofsizes are available and are easily Installed. Contact your curb. Use with Curb Mount models. Note Step flash kit designed. for use with curbs
I'dngmaterlaisdealeror5un Tek Manufacturing for details. constructed of x6's only,
LIGHTTUNNEL INSTALLATION INSTRUCTIONS
For homes with an attic, it Is necessary to build a tunnel between skylights and ceiling. The tunnel walls may be straight, or flared for extra light and
architectural appeal. it's very easy to Increase the tunnel size along the length of the ceiling joists. As long as no roof -supporting members are cut no
special framing is needed. While it is possible to flare the tunnel in all directions, If support members are cut, special framing will be required for structural
support. In this case you must consult a qualified building professional to insure proper and safe results.
1 After roof and ceiling openings have been framed, measure distance (at each corner of roof
opening) between rafter/truss and ceiling joist
2 .Using these four measurements, cut 2 x 4lumber for vertical support members (two per corner).
'
3 In each corner, nail vertical support members into place at right angles to each other.
4 Measure, cut, and nail tunnel walls into place. Suggestions for lining tunnel:
- use drywall, tape comers, and paint white using regular or texture paint. (Texture paint alone
will hide and fill untapedjoints, but in time, cracks may appear in corners.)
- use prefinished paneling with molding in comers.
- line the tunnel with cedar, pine, or a wood to coordinate with your decor.
- for special effects, try painting the tunnel a striking accent color, or use mirrors or wallpaper on
tunnel walls.
i
5 .Caulk the slight gap between the tunnel walls and skylight base.
6 'Finish offtunnel at ceiling with molding, or blend edges into ceiling with texture paint.
7 Be sure to wrap the exterior of the tunnel with Insulation for energy savings.
Sun Tek Manufacturing, Inc.
10303 General Drive
Orlando, FL 32824
407/859-2117
www.sun-Tek.com
CustomerService@sun-tek.com
SIZE
Size'
Code
INFORMATION.-
Roof
Doe in
:Finished
BS opening
Dim ns M
Curb OutsideCenter
DimensionS
ac n
Fastenersdiedute
SIrY4GHTT0 CURB CURBTODECx
e12x2ptAlps Pan r10s 2K'Deck
Head screws screws
Side
Per
siw. eo
Pn
bide
Per
Sid
Per
141411Kx11K'
10Kx 1016-A4%-x
14K'
- 46
`b
2
2-_2:
1422
1[K x19'h'
101A. 18K'
14h'x22h'
16
'2
2
2
3
1430
11K x27W
.1OK'x 26%'
:. 14K'x 30K'-'
'16,
2'.�
.3
2
. 3-
1446
11h'x43h'
10K'x42K'
'14K'x 46%'
16,
2
4
'2
4
1725.
14K x22K"
13K x21K
'17K'x 25K'
' 16' -
'2
3-
_ 2
3
1733
14h x301h'
BY,".29K
17K'x 33h'
16"
2
3
2
3
174914K'x461h'.
13%x 45W
17K'x49K'-
16"•
2-
4
2
2222
191/,'x 19K'
I8Kx18K'
221h'x 221h'
24'
3
3 -
3
3
2230
.19Y'x 2Th'
a18%'x 26ya'
22K'k 3GW
'' 24'
. ` 3 >
-:3 .
, 3.
- 3
2246
19h'x 431h'
1BK'x42K'
22K-x46%'
24'
3
4
3
4
2525
22K'x22W
21Wx21W
2S%'x 25W
"'24' ..
..' 3 _
,"3- •
3
3 `
2533
22K'x 30K'
21h1x29K'
2SY,'x 33K'
24'
3
3
3
3
2549
22K1x46h'
21h'x 45W
'2S1h'x49h'
. ;24'
, 3'
. 40
3
4 ,
3030
27K'x 27K'
26K'x 26h'
3014'x 301E
16'or32'
3
3
3
3
3046
27M'.43h'
26K'x 42W,,
-'30K'x46K'.
16'6r32'
: 3
4'
. 3
" 4 -
3333
30K'x 30h'
29K'x 29K'
33K'x 33K'
16'or32'
3
3
3
3
3349
3QWx46h'
29K'rr451M
83K'x49h'
46'or32L-
:.3.
4
'. 3
t.'S'-
4646
43h•x43K'
42K'x42K'
46K'x46he
16,24'or48'
4
4
5
S
4949,
46N'k46K-
4SK'x45W
49h'x49K'--'
I6',N'or48'
i 4`'
4 >'
5
—5 '
INSTALLATION INSTRUCTIONS
INSULATED GLASS SERIES
MODEL ICMGII
Use on any type roof (curb required)
.I* CURBO.D.—►1
RrnsheJ_•
Opening
��a9-
You will need:
• hammer • sealant/mastic
• keyhole saw • tape measure
.skill saw - chalkline orstraight edge
• nails • trowel or caulk gun
• drill • utility knife
•2x4's
For LlghtTunnel: RECOMMENDED SEALANTS:
• 8 or 10 penny nails • 100%5flicone
•plywood or drywall ' STS 7000 (Sun-Tek exclusive)
Butyl rubber sealant/caulk
FAILURE TO FOLLOW RECOMMENDED INSTALLATION PROCEDURES MAYVOID WARRANTY
Check local building. codes for glass requirements. • Please read instructions completely before beginning. • Deck and roofing
felt should already by installed.
To properly position skylight between trusses/rafters, locate the roof opening
from the underside of the. decking. (If this area is not accessible, locate the
ceiling joists from inside the house, mark opening in ceiling (a-4, and cut
ceiling opening. Then follow steps below for roof opening.)
a) measure distance between trusses/rafters and mark center point
b) to center skylight, measure one-halfofappropriateroofopening to each
side of center point and mark.
c) using the side marks as a guide, mark corners by drilling holes or driving
nails through roof.
2 Remove shingles 6-8"out from roof opening.
3 Cut roof, opening (snap a chalkline from corner to comer, or draw line with a
straightedge.)
4 Frame roof opening:
a) cut two 2 x 4's to fit the actual distance between trusses/rafters and nail
into place. NOTE:Size2S25 2549, 3333, 3349, 4949.Skipstep "b"proceed
to c:
b) cut two 2 x 4's to the exact length of the roof opening and nail to the
trusses/rafters.
c) if applicable, cut ceiling opening and build tunnel framing. (See "Light
Tunnel Installation Instructions.1
5 Build curb:
a).Consttuct curb with 2 x 4's, 2 x 6's, etc. (depending on height desired or
building code requirements). Curb should be minimum 4'high'Be sure inside
measurement of curb is the same as roof opening measurement
b) Secure curbto roof. See fastener schedule and drawino.
6 Shingle roof up to bottom ofcurb.
% Flash curb (sizes 2525, 2549, 3333,
3349, 4949 can be used with Sun Tek's
preformed, pre-cut Step Flash Kit with
one-piece head and silo. Use galvanized
sheet metal, aluminum, or copper. Metal
should extend a minimum of 4'over
shingles (on bottom side), then up sides
of curb. Flashing should be flush with
curb top.
8 Shingle upsides and across the top:
9 Position the skylight over the curb with the"THIS EDGE DOWN'label at the
lowest side of the curb. Centerthe skylight over the curb, making surethe foam
.gasket is in contact With the top of the curb. As the fasteners, (see fastener
schedufe),`are being attached to the curb, push down on the frame just above
the fastener to insure a good seal. Use the #12 x 2`screws, provided. Continue
attaching the remaining fasteners in the same manner. All fastener installation
holes provided must be used.
i
'CMG II FASTENER DRAWING
3' 4" ---
3' J FASTENERS CURB TO DECK 4'
See schedule for total number of
fasteners per side. Each side
requires o fastener 3' from each
end. Additional fasteners to be
equally spaced. #10 x. 2 1/2' minimum
Spacing not to exceed 14 7/8%
FASTENERS SKYLIGHT TO CURB
See schedule for total number of Engineer of Record:
fasteners per side. Each side James D. We1% Jr., P.E.
Professional Engineer No. 53616
requires a fastener 4' from each
end. Additional fasteners. to be
?8c L Wells Consulting LLC
equally spaced. #12 x. 2 ' minimum 1453 Arbitus Circle
Spacing not to exceed 15 5/8'. Oviedo, FL32765
.(407)496-5489
Certificate of Authorization No. 27162
p12X2- SHEET METAL SCREW
I l l f DESIGN PRESSURE RATING
!�� nP.RF
ff !I I LARGE MISSILE IMPACT RESISTANCE
#10 DECK
SCREW ('
_ XA-
2X CURB
(BYOTHERS)
518- PA'�
deck