Loading...
HomeMy WebLinkAboutPRODUCT APPROVAL SKYLIGHTSJJ Business. & Professional Regiulaticia BCIS Home 1 Log In � User Registration Hot Topics Submit Surcharge Stats & Facts I Publications ! ContacbUs BCIS Sife Map , Links Search ba RECEIVED @�I Product Approval r USER: Publ(cUset JAN 2.4 2022 Product Aopr va Menu > Product or Application Search > Application List > Application Detail St: Lucie County FL # FL20881-RS Permitting +A Application Type Affirmation Code Version 2020 Application Status Approved REVIEWED FOR Comments CODE COMPLIANCE Archived ST. LUCIE COUNTY BOCC— Product Manufacturer (Stiff Address/Phone/Email 10303General Dr Orlando, FL 32824 i (407) 859-2117 ,y 3 jfdudndr@sun-tek.com Authorized Signature James Feudner FILE COPPN' engineering@sun-tek.com Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Sky Lights Subcategory Skylight Coinpllance'Method Certification Mark or Listing Certification Agency National Accreditation & Management Institute Validated By National Accreditation & Management Institute Referenced Standard and Year (of Standard) Standard Year TAS201 1994 TAS202 1994 TA8203 1994 Equivalence of Product Standards Certified By I affirm that there are no changes In the new Florida Building Code.which affect my products) and my product(s) are in compliance with the new Florida Building Code. Documentation from approved Evaluation or Validation Entity Yes No N/A F1,20881 RS COC 'ICMGI 2020 FBC letter.W I-20881 .RS COC IFGC 2020 FBC letter.'pd Product Approval Method Method 1 Option A Date Submitted 12/04/2020 Date Validated 12/04/2020 Date Pending FBC Approval Date Approved 12/12/2020 Summary of Products FL # Model, Number or Name Description C2p8si.1 ICMGII ICMGII (Impact) Aluminum Skylight Limits of Use Certification Agency. Certificate Approved for use in HVHZ, Yes FL20881 R5 C CAC NI01320-112 ICMGII.pdf Approved for use outside HVHZ: Yes Quality Assurance Contract Expiration Date Impact Resistant: Yes 03/31/2022 Design Pressure: +60/-60 Installation Instructions Other: FL20881 R5 'II ICMGII installation lifst - Anoroved 6,21.16 L.pdf Verified ,By: lames O Wells Jr. RE, RE, No. 53616 Created by Independent Third Party: Yes. Evaluation Reports FL20881 RS AE 2017FBCICMGII ,reWrt.pdf Created by Independent Third Party: Yes 20881.2 IFGC IFGC 4949 Flush Mounted Wood Skylight Limits of Use Certification Agency Certificate Approved for use In HVHZ: Yes FL20881 1115 .0 'CAC NI013293-113 IFGC.Ddf . Approved for use outside HVHZ: Yes Quality'Assuraince Contract Expiration Date Impact Resistant: Yes 03/31/2022 Design Pressure: +60/-60 Installation Instructions Other: FL20881 R5 .II 12833F - IFGC Install Inst = Final - APproved 7.26.16 JW.pdf Verified By; James D. Wells Jr, RE. No. 53616 Created by Independent Third Party: Yes Evaluation Reports FL20881 RS AE 2017FBC-IFGC report•pc1f Created by Independent Third Party: Yes Contact Us :: 2601 Blair Stone Road, Tallahassee FL 32399 Phone: 850-487-1824 The State of Florida is an AA/EEO employer.., Copyright 2007-2013 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mall to this entity.. Instead, contact the office by phone or by traditional mall. If you have any questions, please contact 850.487.1395. iPPursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails ;provided may be used for official communication with the licensee. However emall.addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please click here. . Product Approval Accepts: o � a : ECled. y- Credit Card Safe l NOTICE OF PRODUCT. CERTIFICATION CERTIFICATION. NO: DATE: CERTIFICATION PROGRAM: COMPANY: CODE: REVISION DATE: N1013292-R1 07/06/2016 Structural Sun -Talc 225-1 02/11 /2020 To verify that the "Notice -of Product Certification- is valid, please visit %vww.NAi*%7lCer1itication.com to assure that the product is active and currently listed. This certification represents product conformity to (tie applicable specification and that certification criteria'has been satisfied. A NAM[ approved certification label must be applied to the.product to claim certification status. Please review and advise NAM[ if any corrections are required to this documeni. COMPANY NAME AND ADDRESS PRODUCT DESCRIPTION Sun-Tek Manufacturing, Inc: Series "ICMG II (Impact)" 10303 General Drive Aluminum Skylight Orlando, FL 32824 Configuration: O Glazing: 1G-3/16" Iempered Glass/l/8" Annealed Glass/0.090" Kuraray Butacite PVB.Interlayer/118" Annealed Glass Frame: W-1'283mnt(50.5") h1-1283mni(50.5") PLO: W-:1162nun(4535") 1-1-11621nni(45.75") SPECIFICATION PRODUCT RATING TAS 201/202/203-94 Design Pressure: 2873 Pa (60 psf) )Pater Penctrallnn Resistance Tcst 'Presswe: 431 Pa (9.00 psq Large Missile Impact Rated Product Tested By: National Certified Testing Laboratories Report No! NCTL,-210-4017-02A. Expiration Date: March 31, 2012 Administrator's Signature:------------------ - NATIONAL ACCREDITATION AND MANAGEMENT INSTITUTE, INC. 4104 George Washington Memorial Higl»vay Hayes, VA 23072 Tel: (804) 684-5124 Fax: (804) 684-5122 This item has been electronically signed and sealed by James D. Wells, Jr., P.E. on 6/21/2016 using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. James D Wells n„..�� I attest to the '-ft accuracyand integtityof this document 2016.06.21 14:25:51 -04'00' Engineer of Record: James D. Wells, Jr., P.E. Professional Engineer No. 53616 J 5L Wells Consulting LLC �� 1453 Arbitus Circle Oviedo, Fl. 32765 SKY H T S (407)496-5489 Certificate of AuthorizationNo.27162 � �.roG.�.,.Ca,eZ.' CLEANING YOUR SKYLIGHT: SYS 1000 Caulk - Use only between decking and underside of skylight flange on use a mild soap and water or glass cleaners only. Fresh paint splashes, glazing .Glass Series. Not necessary on CMIG2 compound, etc. maybe removed by rubbing lightly with a soft cloth or cotton ball soaked in ml, eral spirits ACCESSORIES: Step Flash Kit -Pre -formed, precut flashing eliminates need (or flashing on self -built '&'SlyiightSh4des-a varieryofsizes are available and are easily Installed. Contact your curb. Use with Curb Mount models. Note Step flash kit designed. for use with curbs I'dngmaterlaisdealeror5un Tek Manufacturing for details. constructed of x6's only, LIGHTTUNNEL INSTALLATION INSTRUCTIONS For homes with an attic, it Is necessary to build a tunnel between skylights and ceiling. The tunnel walls may be straight, or flared for extra light and architectural appeal. it's very easy to Increase the tunnel size along the length of the ceiling joists. As long as no roof -supporting members are cut no special framing is needed. While it is possible to flare the tunnel in all directions, If support members are cut, special framing will be required for structural support. In this case you must consult a qualified building professional to insure proper and safe results. 1 After roof and ceiling openings have been framed, measure distance (at each corner of roof opening) between rafter/truss and ceiling joist 2 .Using these four measurements, cut 2 x 4lumber for vertical support members (two per corner). ' 3 In each corner, nail vertical support members into place at right angles to each other. 4 Measure, cut, and nail tunnel walls into place. Suggestions for lining tunnel: - use drywall, tape comers, and paint white using regular or texture paint. (Texture paint alone will hide and fill untapedjoints, but in time, cracks may appear in corners.) - use prefinished paneling with molding in comers. - line the tunnel with cedar, pine, or a wood to coordinate with your decor. - for special effects, try painting the tunnel a striking accent color, or use mirrors or wallpaper on tunnel walls. i 5 .Caulk the slight gap between the tunnel walls and skylight base. 6 'Finish offtunnel at ceiling with molding, or blend edges into ceiling with texture paint. 7 Be sure to wrap the exterior of the tunnel with Insulation for energy savings. Sun Tek Manufacturing, Inc. 10303 General Drive Orlando, FL 32824 407/859-2117 www.sun-Tek.com CustomerService@sun-tek.com SIZE Size' Code INFORMATION.- Roof Doe in :Finished BS opening Dim ns M Curb OutsideCenter DimensionS ac n Fastenersdiedute SIrY4GHTT0 CURB CURBTODECx e12x2ptAlps Pan r10s 2K'Deck Head screws screws Side Per siw. eo Pn bide Per Sid Per 141411Kx11K' 10Kx 1016-A4%-x 14K' - 46 `b 2 2-_2: 1422 1[K x19'h' 101A. 18K' 14h'x22h' 16 '2 2 2 3 1430 11K x27W .1OK'x 26%' :. 14K'x 30K'-' '16, 2'.� .3 2 . 3- 1446 11h'x43h' 10K'x42K' '14K'x 46%' 16, 2 4 '2 4 1725. 14K x22K" 13K x21K '17K'x 25K' ' 16' - '2 3- _ 2 3 1733 14h x301h' BY,".29K 17K'x 33h' 16" 2 3 2 3 174914K'x461h'. 13%x 45W 17K'x49K'- 16"• 2- 4 2 2222 191/,'x 19K' I8Kx18K' 221h'x 221h' 24' 3 3 - 3 3 2230 .19Y'x 2Th' a18%'x 26ya' 22K'k 3GW '' 24' . ` 3 > -:3 . , 3. - 3 2246 19h'x 431h' 1BK'x42K' 22K-x46%' 24' 3 4 3 4 2525 22K'x22W 21Wx21W 2S%'x 25W "'24' .. ..' 3 _ ,"3- • 3 3 ` 2533 22K'x 30K' 21h1x29K' 2SY,'x 33K' 24' 3 3 3 3 2549 22K1x46h' 21h'x 45W '2S1h'x49h' . ;24' , 3' . 40 3 4 , 3030 27K'x 27K' 26K'x 26h' 3014'x 301E 16'or32' 3 3 3 3 3046 27M'.43h' 26K'x 42W,, -'30K'x46K'. 16'6r32' : 3 4' . 3 " 4 - 3333 30K'x 30h' 29K'x 29K' 33K'x 33K' 16'or32' 3 3 3 3 3349 3QWx46h' 29K'rr451M 83K'x49h' 46'or32L- :.3. 4 '. 3 t.'S'- 4646 43h•x43K' 42K'x42K' 46K'x46he 16,24'or48' 4 4 5 S 4949, 46N'k46K- 4SK'x45W 49h'x49K'--' I6',N'or48' i 4`' 4 >' 5 —5 ' INSTALLATION INSTRUCTIONS INSULATED GLASS SERIES MODEL ICMGII Use on any type roof (curb required) .I* CURBO.D.—►1 RrnsheJ_• Opening ��a9- You will need: • hammer • sealant/mastic • keyhole saw • tape measure .skill saw - chalkline orstraight edge • nails • trowel or caulk gun • drill • utility knife •2x4's For LlghtTunnel: RECOMMENDED SEALANTS: • 8 or 10 penny nails • 100%5flicone •plywood or drywall ' STS 7000 (Sun-Tek exclusive) Butyl rubber sealant/caulk FAILURE TO FOLLOW RECOMMENDED INSTALLATION PROCEDURES MAYVOID WARRANTY Check local building. codes for glass requirements. • Please read instructions completely before beginning. • Deck and roofing felt should already by installed. To properly position skylight between trusses/rafters, locate the roof opening from the underside of the. decking. (If this area is not accessible, locate the ceiling joists from inside the house, mark opening in ceiling (a-4, and cut ceiling opening. Then follow steps below for roof opening.) a) measure distance between trusses/rafters and mark center point b) to center skylight, measure one-halfofappropriateroofopening to each side of center point and mark. c) using the side marks as a guide, mark corners by drilling holes or driving nails through roof. 2 Remove shingles 6-8"out from roof opening. 3 Cut roof, opening (snap a chalkline from corner to comer, or draw line with a straightedge.) 4 Frame roof opening: a) cut two 2 x 4's to fit the actual distance between trusses/rafters and nail into place. NOTE:Size2S25 2549, 3333, 3349, 4949.Skipstep "b"proceed to c: b) cut two 2 x 4's to the exact length of the roof opening and nail to the trusses/rafters. c) if applicable, cut ceiling opening and build tunnel framing. (See "Light Tunnel Installation Instructions.1 5 Build curb: a).Consttuct curb with 2 x 4's, 2 x 6's, etc. (depending on height desired or building code requirements). Curb should be minimum 4'high'Be sure inside measurement of curb is the same as roof opening measurement b) Secure curbto roof. See fastener schedule and drawino. 6 Shingle roof up to bottom ofcurb. % Flash curb (sizes 2525, 2549, 3333, 3349, 4949 can be used with Sun Tek's preformed, pre-cut Step Flash Kit with one-piece head and silo. Use galvanized sheet metal, aluminum, or copper. Metal should extend a minimum of 4'over shingles (on bottom side), then up sides of curb. Flashing should be flush with curb top. 8 Shingle upsides and across the top: 9 Position the skylight over the curb with the"THIS EDGE DOWN'label at the lowest side of the curb. Centerthe skylight over the curb, making surethe foam .gasket is in contact With the top of the curb. As the fasteners, (see fastener schedufe),`are being attached to the curb, push down on the frame just above the fastener to insure a good seal. Use the #12 x 2`screws, provided. Continue attaching the remaining fasteners in the same manner. All fastener installation holes provided must be used. i 'CMG II FASTENER DRAWING 3' 4" --- 3' J FASTENERS CURB TO DECK 4' See schedule for total number of fasteners per side. Each side requires o fastener 3' from each end. Additional fasteners to be equally spaced. #10 x. 2 1/2' minimum Spacing not to exceed 14 7/8% FASTENERS SKYLIGHT TO CURB See schedule for total number of Engineer of Record: fasteners per side. Each side James D. We1% Jr., P.E. Professional Engineer No. 53616 requires a fastener 4' from each end. Additional fasteners. to be ?8c L Wells Consulting LLC equally spaced. #12 x. 2 ' minimum 1453 Arbitus Circle Spacing not to exceed 15 5/8'. Oviedo, FL32765 .(407)496-5489 Certificate of Authorization No. 27162 p12X2- SHEET METAL SCREW I l l f DESIGN PRESSURE RATING !�� nP.RF ff !I I LARGE MISSILE IMPACT RESISTANCE #10 DECK SCREW (' _ XA- 2X CURB (BYOTHERS) 518- PA'� deck