Loading...
HomeMy WebLinkAboutTibbets Lumber DrawingA 2820 Kirby Cir. NE, Palm Bay, Fl. 32905 Phone: ( 321 ) 409-9800 Fax: ( 321 ) 409-9803 "v' Signature of this document acknowledges that the client has reviewed this truss placement diagram in its entirety and is in agreement with the following items, Including but not limited to: A.) The client is responsible to verify the accuracy of information submitted for use in design, fabrication, and scheduling. Any labor,material, or time delay inrcurred from inadequate or incorrect dr information supplied from the dientwiR beat the client's expense. B.) Design Criteria: The client acknowledges that the truss design criteria noted on this truss placementdiagram meets oreaceeds the desifirn criteria specified by the building designer, engineer of record, and local and state building requirements. q tabrication and Deivery: One approved truss placement diagram must be returned to the truss manufacturer before fabrication and delivery will be sscheduled. It is the client's responsibility to coordinate delivery dates with the truss manufacturer. The chentshall provide a marked location for delivery, which must be acressilde, level, and clear of material and debris in lieu of this, trusses will be delivered in the bestavailableocation atourdriversdiscretion. Care and handiingofthe trusses J followngcilvery is the respomibihy, of decclient. 0 D.) lrstagation & Bradng: BCSI20Dg 1 RUiking Cmnponemf Safety Information) WTCAITPI d guidelines shall be followed when handling., installing, and bracing trusses. Temporaryand/or 0- 4 permanentbracingandblorkingis notincluded in the truss package. Trusses shall be braced to F prevent rotation and provide lateral stability in accordance with the requirements specified in the Z W construction documents for the building and on the individual truss design drawings. Theoverall U stability of the truss system is the responsibility of the buildingdesigner. 41/16" f.) Field framing: 1) Troy ceilings and othercetlingtrinsitions may require field framing by others. 2.)(eiling drops and valleys notslwwn are to be find framed byothem 3.)Overhanlismaybeover length-cuttufitinfieid Overhangsare 20 or 2x5-no blocking is applied. Cnmerjackswilibe square cutand hipjacks wilt be double beveled. F.) Repairs: Trues; related problems are to be reported to the truss manufacturer ASAP, Preferably inwubng DO NOr CUTAWTRLISSES before contatting the truss manufacturer with specifirs of the problem. Any field modficatoos made withoutan engineered repair drawing will be the responsibility, ofthec®ent No bark charges or crane charges of anykindwgl be accpeted, unless specifically END DETAIL ENT � RY approved incanting by the toss mamifaccomi management. G.) This Truss Placement diagram was not created by an engineer, rather bylibbetbl Lumber Co. LLC staff, and is purelyto be used as an installation guide and does not require a seal. Truss dessgn analyses are on the Truss Design Drawing, which may besealed by the Times Design Engineer. .Floor Load, Roof Load; 55# ref; 40 TCLL, 10 TCDL, 0 BCLL, 5 SCDL; Dur.: 1.00 37# lost 20 TCLL, 7 TCDL, 0 BCLL, 10 BCDL, Duc1 Design checked for 10 pef non -concurrent LL on BC. Design checked for 10 ref non -concurrent LL on BC. Mitek Engineering Exposure : C Building Code : FBC 2017 Mean Hgt. : 15' ASCE 7-10 Bldg. Cat. .11 TPI 1-2014 Importance Factor 1.0 3/16" K Truss Design : C & C Enclosure : Enclosed cry6 H Uplift Calc. : MWFRS Entry : Exposed to Wind V 4" Wind Speed : 160 mph US Lanai : Exposed to Wind ROOF CRITERIA FLOOR CRITERIA z to T.C. Pitch 5 / 12 B.C. Pitch ... / 12 Depth ._ END DETAIL MAIN HSE v T.C. Size 2X4 Spacing a Heel Hgt. 6 3116" io Bearing Block CD mCantilever ... Vapor barrier between floor 8 concrete by others, Floor trusses hell back 3/4" at exterior wails, Overhang16" block tL fill by others. blocking for vertical bad transfer by others Odd space floor trusses around plumbing as noted Spacing 24" c.c. 0 TOB @ 14'-4 1/2" TYP. ROOF HANGER: THD26 TYP. FLR. HANGER: THD46 OTHD26 Qty O THD46 City in O THD26-2 Qty O THD48 Qty 0 OCv THDH26-2 Qty OO THDH48 City ZO THDH26-3 Qty O THDH410 Qty OTHD28 Qty OQ OSKH26 L/R OR Install hangers per manufacturer's guidelines- All connectors and tie downs other than truss to girder truss are to he specified and supplied by others. Approved by 0 a Desired delivery date: a Approval Date. 0 m U Reaction Uplift Reaction Uplift Reaction Uplift 1 xx xx 7 xx xx 13 xx xx 2 xx xx 8 xx xx 14 xx xx K 4 3 xx xx 9 xx xx 15 xx xx 2E 4 xx xx 10 xx xx 16 xx xx w F LL 5 xx xx 11 xx xx 17 xx xx a 6 xx xx 12 xx xx 18 xx xx Q. Only points listed above have reaction > 5000 or Uplift > 1000 Values shown on sealed design drawings supersede the above. x f- Client : Don Alford z w Project : Alford Residence J O Address: PARCEL ID:1431-801-0073-000-8 Ft. Pierce, FL Date, Intials, Description W .. fY Date : 12/17/20,20 1 Designer: Keith Baer Project # 510662