HomeMy WebLinkAboutEnergy Efficiency Code 11-22-21FORM R405-2020
FILE Copy
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: 144A RH - FP140030
Builder Name: FOCUS HOMES
Street: 7704 SEBASTIAN ROAD
Permit Office:
City, State, Zip: Fort Pierce, FL, 34951
Permit Number:
1
Owner: FOCUS HOMES
Jurisdiction:''"
Design Location: FL, ST LUCIE_CO_INTL
County: St. Lucie (Florid % innate Zone 2 )
1. New construction or existing New (From Plans)
10. Wall -rype 1642.7 sq �
ZlExterior
Insulation Area
2. Single family or multiple family Detached
In a. Concrete Block - A(n's
R=4.1 1325.30 ft2
b. Frame - Wood, Adjacent
R=13.0 317.33 ft2
3. Number of units, if multiple family 1
c. N/A f
R= ft2
4. Number of Bedrooms 3
d. N/A
R= ft2
5. Is this a worst case? Yes
sgft.)
11. Ceiling der
a. Under A tie {Vented)
Insulation Area
R=30.0 1443.00 ft2
6. Conditioned floor area above grade (ft2) 1443
b. N/A
R= ft2
Conditioned floor area below grade (ft2) 0
c. N/A
R= ft2
7. Windows(115.0 sgft.) Description Area
12. Ducts`
a. Sup: Attic, Ret: Main, AH: Main
R ft2
6 300
a. U-Factor: Dbl, U=0.34 75.00 ft2
SHGC: SHGC=0.23
b. U-Factor: Dbl, U=0.55 40.00 ft2
3.+ ooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.25
a. Central Unit
22.8 SEER:16.00
c. U-Factor. N/A ft2
SHGC:
Area Weighted Average Overhang Depth: 1.000 ft.
14. Heating systems
kBtulhr Efficiency
Area Weighted Average SHGC: 0.237
a. Electric Heat Pump
22.8 HSPF:9.00
8. Skylights Area
c. U-Factor:(AVG) NIA ft2:;
15. Hot water systems
SHGC(AVG): NIA ;" '
a, Electric
Cap: 50 gallons
9. Floor Types (1443.0 sgft.) Insulation Are ``
EF: 0.950
a. Slab -On -Grade Edge Insulation R=0.0 1443, ,' ft2
b. Conservation features
b. N/A R= ft2
None
c. N/A R= ft2
16. Credits
Pstat
roposed Modified Loads: 43.93
Area: 0.080
PASS
;)ITIP
Glass/Floor
Total Baseline Loads: 46.79
1 hereby certify that the plans and speciions covered by
imt
Review of the plans and
O�I�E Sr�
`�T6
'
this calculation are in compliance wi a _Florida Energy
specifications covered by this
.y -
Code.
calculation indicates compliance
�_
�j ii„ ' ,,�,��`��
with the Florida Energy Code.
ti nrrn`'%,-:''::��. O
PREPARED BY'
Before construction is completed
DATE: q
this. building will be inspected for
compliance with Section 553.908
I hereby certify that this building, as designed, is in compliance
Florida Statutes.
COD
with the Florida Ene g,y Code.
WE
OWNER/AGENT:
BUILDING OFFICIAL:
DATE:
DATE:
- Comzliance
,erequires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
Clem ctory-sealed in accordance with R403.3.2.1.
- Com requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 4
•Fn;zm Pans-9n9n INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title:
Building Type:
Owner Name:
# of Units:
Builder Name:
Permit Office:
Jurisdiction:
Family Type:
New/Existing:
Comment:
144A RH - FP140030
User
FOCUS HOMES
1
FOCUS HOMES
Detached
New (From Plans)
Bedrooms: 3
Conditioned Area: 1443
Total Stories: 1
Worst Case: Yes
Rotate Angle: 0
Cross Ventilation: No
Whole House Fan: No
Address Type: Street Address
Lot #
Block/Subdivision:
PlatBook:
Street: 7704 SEBASTIAN ROA
County: St. Lucie
City, State, Zip: Fort Pierce ,
FL, 34951
CLIMATE
/
v Design Location
Design Temp
TMY Site 97.5 % 2.5 %
Int Design Temp Heating Design Daily Temp
Winter Summer Degree Days Moisture Range
FL, ST_LUCIE_CO_INTL FL_VERO_BEACH_MUNI 39 90
70
75 299 58 Medium
BLOCKS
Number
Name
Area Volume
1
Block1
1443 12987
SPACES
Number
Name
Area Volume Kitchen Occupants
Bedrooms InfilID Finished Cooled Heated
1
Main
1443 12987 Yes 4
3
1 Yes Yes Yes
FLOORS
#
Floor Type
Space Perimeter R-Value
Area
Tile Wood Carpet
1 Slab -On -Grade Edge Insulatio Main 179 ft 0
1443 ft2
____ 0.3 0 0.7
ROOF
/
v #
Type
Roof Gable Roof
Materials Area Area Color
Red
Barr
Solar SA Emitt Emitt Deck Pitch
Absor. Tested Tested Insul. (deg)
1
Hip Composition shingles 1614 ft2 0 ft2 Medium
N
0.85 No 0.9 No 0 26.6
ATTIC
V #
Type
Ventilation Vent Ratio (1 in)
Area
RBS IRCC
1
Full attic
Vented 150 1443 ft2
N N
CEILING
#
Ceiling Type
Space R-Value Ins Type
Area Framing Frac Truss Type
1
Under Attic (Vented)
Main 30 Blown
1443 ft2 0.07 Wood
7/30/2021 1:25 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 4
-FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
WALLS
Adjacent Cavity Width Height Sheathing Framing Solar Below
Space - luP Ft in Ef In Area R-Value-Eraction-Absor_GradeO
1
2
3
4
5
N
E
S
W
N
Exterior Concrete Block - Int Insul Main
Exterior Concrete Block - Int Insul Main
Exterior Concrete Block- Int Insul Main
Exterior Concrete Block - Int Insul -Main
Garage Frame - Wood Main
4.1 20 9
4.1 48 9
4.1 40 9
4.1 34 9
13 34 9
4 186.7 W
4 448.0 ft2
4 873.3 ft2
4 317.3 ft2
4 317.3 ft2
0 0.6
0 0.6
0 0.6
0 0.6
0.19 0.01
0
0
0
0
0
DOORS
#
Ornt Door Type Space
Storms
U-Value Width
Ft In
Height
Ft In
Area
1
2
N Insulated Main
N Insulated Main
None
None
.16 3
.16 2 6
8
6 8
24 ft2
16.7 ft2
WINDOWS r
Orientation shown is the entered orientation =>.) changed to Worst Case.
v
#
Wall
Ornt ID Frame Panes NFRC
U-Factor SHGC Imp
Overhang
Area Depth Separation
Int Shade
Screening
1
2
3
4
5
N 1 Vinyl Low-E Double Yes
E 2 Vinyl Low-E Double Yes
S 3 Vinyl Low-E Double Yes
S 3 Vinyl Low-E Double Yes
S 3 Metal Low-E Double Yes
0.34 0.23 N
0.34 0.23 N
0.34 0.23 N
0.34 0.23 N
0.55 0.25 N
20.0 ft2 1 ft 0 in 2 ft 0 in
15.0 ft2 1 ft 0 in 2 ft 0 in
20.0 ft2 1 ft 0 in 2 ft 0 in
20.0 ft2 1 ft 0 in 2 ft 0 in
40.0 ft2 1 ft 0 in 1 ft 0 in
Drapes/blinds
Drapes/blinds
Drapes/blinds
Drapeslblinds
Drapes/blinds
None
None
None
None
None
GARAGE
#
Floor Area Ceiling Area
Exposed Wall Perimeter
Avg. Wall Height Exposed Wall Insulation
1
413ft2 413ft2
40ft
9ft
1
INFILTRATION
#
Scope
Method SLA
CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Proposed ACH(50) .0004
1515.2 83.13 1,56.06 .1324
7
HEATING SYSTEM
#
System Type Subtype
Speed Efficiency
Capacity
Block.
Ducts
1
Electric Heat Pump/ None
Singl HSPF:9
22.8 kBtu/hr
1
sys#1
COOLING SYSTEM
#
System Type Subtype
Subtype. Efficiency
Capacity Air Flow
SHR Block
Ducts
1
Central Unit/ None
Singl SEER: 16 22.8 kBtu/hr 684 cfm
0.73 1
sys#1
7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 4
• FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT
HOT WATER SYSTEM
#
System Type SubType
Location EF Cap Use
SetPnt
Conservation
1
Electric None
Garage 0.95 50 gal 60 gal
120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cert #
Company Name
System Model # Collector Model
# Area
Volume
FEF
None
None
ft,
DUCTS
V
--- Supply ----
--- Return ---
Air
CFM 25
CFM25
HVAC #
#
Location R-Value Area
Location Area Leakage Type
Handler
TOT
OUT QN RLF
Heat Cool
1
Attic 6 300 ft'
Main 20 ft2 Default Leakage
Main
(Default) (Default)
1 1
TEMPERATURES
Programable Thermostat: Y
Ceiling Fans:
Cooling X] Jan
f
Feb Mar
Xj Apr May Jun j Jul
f X]
[X Aug
[X Sep
X Oct X Nov
Dec
Heating X] Jan
jXj XFeb � Mar
rX
X] Apr ] May �j Jun Jul
r]
[X� Au[X�SeP
f X� Oct f X� Nov
i jXXj DecVentin
XJan
X Feb Mar
X Apr May [X Jun [X] Jul
[X Aug
[X Se
[X Oct [X Nov
XDec
Thermostat Schedule: HERS 2006 Reference
Hours
Schedule Type
1
2 3 4 5 6
7
8
9
10 11
12
Cooling (WD)
AM 78
78 78 78 78 78
78
78
80
80 80
80
PM 80
80 78 78 78 78
78
78
78
78 78
78
Cooling (WEH)
AM 78
78 78 78 78 78
78
78
78
78 78
78
PM 78
78 78 78 78 78
78
78
78
78 78
78
Heating (WD)
AM 66
66 66 66 66 68
68
68
68
68 68
68
PM 68
68 68 68 68 68
68
68
68
68 66
66
Heating (WEH)
AM 66
66 66 66 66 68
68
68
68
68 68
68
PM 68
68 68 68 68 68
68
68
68
68 66
66
MECHANICAL VENTILATION
Type
Supply CFM
Exhaust CFM Fan Watts HRV Heating System
Run Time Cooling System
None
0
0 0 0 1 - Electric Heat Pump
0%
1 -Central Unit
MASS
Mass Type
Area Thickness Furniture Fraction
Space
Default(8 Ibs/sq.ft.
0 ft, 0 ft
0.3
Main
7/30/2021 1:26 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 4
FORM R405-2020
,
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX` = 94
The lower the EnergyPerformance Index, the more efficient the home.
7704 SEBASTIAN ROAD, Fort Pierce, FL, 34951
1. New construction or existing
New (From Plans)
10. Wall Type and Insulation
2. Single family or multiple family
Detached
a. Concrete Block - Int Insul, Exterior
b. Frame - Wood, Adjacent
3. Number of units, if multiple family
1
c. N/A
4. Number of Bedrooms
3
d. N/A
11. Ceiling Type and insulation level
5. Is this a worst case?
Yes
a. Under Attic (Vented)
6. Conditioned floor area (ftz)
1443
b. NIA
7. Windows- Description
Area
c. N/A
a. U-Factor. Dbl, U=0.34
75.00 ft'
12. Ducts, location & insulation level
a. Sup: Attic, Ret: Main, AH: Main
SHGC: SHGC=0.23
b. U-Factor. Dbl, U=0.55
40.00 ftz
SHGC: SHGC=0.25
13. Cooling systems
c. U-Factor. N/A
ftz
a. Central Unit
SHGC:
d. U-Factor. N/A
ftz
14. Heating systems
SHGC:
a. Electric Heat Pump
Area Weighted Average Overhang Depth:
1.000 ft.
Area. Weighted Average SHGC:
0.237
8. Skylights Description
Area
15. Hot water systems
a. U-Factor(AVG): NIA
ftz
a. Electric
SHGC(AVG): N/A
b. Conservation features
9. Floor Types
Insulation Area
. None
a. Slab -On -Grade Edge Insulation
R=0.0 1443.00 ft'
Credits (Performance method)
b. N/A
R= ft'
c. NIA
R= ftz
certify that this home has complied with the Florida Energy Efficiency Code for Building
Construction through the above energy saving features which will be installed (or exceeded)
in this home before final inspection. Otherwise, a _new EPL Display Card will be completed
based on installed Code compli \\
Builder Signature: Date:
Address of New Home:
City/FL Zip:
Insulation Area
R=4.1 1325.30 ft2
R=13.0 317.33 ftz
R=
ftz
R=
ftz
Insulation
Area
R=30.0
1443.00 ft'
R=
ftz
R=
ftz
R ft'
6 300
kBtu/hr
Efficiency
22.8
'SEER:16.00
kBtu/hr Efficiency
22.8 HSPF:9.00
Cap: 50 gallons
EF: 0.95
a�DWE
Pstat
*Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code,
Energy Conservation, contact the Florida Building Commission's support staff.
**Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
a
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: 144A RH - FP140030 Builder Name: FOCUS HOMES
Street: 7704 SEBASTIAN ROAD Permit Office:
City, State, Zip: Fort Pierce, FL, 34951 Permit Number.
Y
U
Owner: FOCUS HOMES Jurisdiction:
W
Design Location: FL, ST_LUCIE_CO_INTL
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous -air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceilinglattic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceilinglsoffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated; by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side.
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace wall
.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned, space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be airtight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind piping and wiring.
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinki cover plates and walls or ceilin
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1