Loading...
HomeMy WebLinkAboutEnergy Efficiency Code 11-22-21FORM R405-2020 FILE Copy FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: 144A RH - FP140030 Builder Name: FOCUS HOMES Street: 7704 SEBASTIAN ROAD Permit Office: City, State, Zip: Fort Pierce, FL, 34951 Permit Number: 1 Owner: FOCUS HOMES Jurisdiction:''" Design Location: FL, ST LUCIE_CO_INTL County: St. Lucie (Florid % innate Zone 2 ) 1. New construction or existing New (From Plans) 10. Wall -rype 1642.7 sq � ZlExterior Insulation Area 2. Single family or multiple family Detached In a. Concrete Block - A(n's R=4.1 1325.30 ft2 b. Frame - Wood, Adjacent R=13.0 317.33 ft2 3. Number of units, if multiple family 1 c. N/A f R= ft2 4. Number of Bedrooms 3 d. N/A R= ft2 5. Is this a worst case? Yes sgft.) 11. Ceiling der a. Under A tie {Vented) Insulation Area R=30.0 1443.00 ft2 6. Conditioned floor area above grade (ft2) 1443 b. N/A R= ft2 Conditioned floor area below grade (ft2) 0 c. N/A R= ft2 7. Windows(115.0 sgft.) Description Area 12. Ducts` a. Sup: Attic, Ret: Main, AH: Main R ft2 6 300 a. U-Factor: Dbl, U=0.34 75.00 ft2 SHGC: SHGC=0.23 b. U-Factor: Dbl, U=0.55 40.00 ft2 3.+ ooling systems kBtu/hr Efficiency SHGC: SHGC=0.25 a. Central Unit 22.8 SEER:16.00 c. U-Factor. N/A ft2 SHGC: Area Weighted Average Overhang Depth: 1.000 ft. 14. Heating systems kBtulhr Efficiency Area Weighted Average SHGC: 0.237 a. Electric Heat Pump 22.8 HSPF:9.00 8. Skylights Area c. U-Factor:(AVG) NIA ft2:; 15. Hot water systems SHGC(AVG): NIA ;" ' a, Electric Cap: 50 gallons 9. Floor Types (1443.0 sgft.) Insulation Are `` EF: 0.950 a. Slab -On -Grade Edge Insulation R=0.0 1443, ,' ft2 b. Conservation features b. N/A R= ft2 None c. N/A R= ft2 16. Credits Pstat roposed Modified Loads: 43.93 Area: 0.080 PASS ;)ITIP Glass/Floor Total Baseline Loads: 46.79 1 hereby certify that the plans and speciions covered by imt Review of the plans and O�I�E Sr� `�T6 ' this calculation are in compliance wi a _Florida Energy specifications covered by this .y - Code. calculation indicates compliance �_ �j ii„ ' ,,�,��`�� with the Florida Energy Code. ti nrrn`'%,-:''::��. O PREPARED BY' Before construction is completed DATE: q this. building will be inspected for compliance with Section 553.908 I hereby certify that this building, as designed, is in compliance Florida Statutes. COD with the Florida Ene g,y Code. WE OWNER/AGENT: BUILDING OFFICIAL: DATE: DATE: - Comzliance ,erequires certification by the air handler unit manufacturer that the air handler enclosure qualifies as Clem ctory-sealed in accordance with R403.3.2.1. - Com requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). 7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 4 •Fn;zm Pans-9n9n INPUT SUMMARY CHECKLIST REPORT PROJECT Title: Building Type: Owner Name: # of Units: Builder Name: Permit Office: Jurisdiction: Family Type: New/Existing: Comment: 144A RH - FP140030 User FOCUS HOMES 1 FOCUS HOMES Detached New (From Plans) Bedrooms: 3 Conditioned Area: 1443 Total Stories: 1 Worst Case: Yes Rotate Angle: 0 Cross Ventilation: No Whole House Fan: No Address Type: Street Address Lot # Block/Subdivision: PlatBook: Street: 7704 SEBASTIAN ROA County: St. Lucie City, State, Zip: Fort Pierce , FL, 34951 CLIMATE / v Design Location Design Temp TMY Site 97.5 % 2.5 % Int Design Temp Heating Design Daily Temp Winter Summer Degree Days Moisture Range FL, ST_LUCIE_CO_INTL FL_VERO_BEACH_MUNI 39 90 70 75 299 58 Medium BLOCKS Number Name Area Volume 1 Block1 1443 12987 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 Main 1443 12987 Yes 4 3 1 Yes Yes Yes FLOORS # Floor Type Space Perimeter R-Value Area Tile Wood Carpet 1 Slab -On -Grade Edge Insulatio Main 179 ft 0 1443 ft2 ____ 0.3 0 0.7 ROOF / v # Type Roof Gable Roof Materials Area Area Color Red Barr Solar SA Emitt Emitt Deck Pitch Absor. Tested Tested Insul. (deg) 1 Hip Composition shingles 1614 ft2 0 ft2 Medium N 0.85 No 0.9 No 0 26.6 ATTIC V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Vented 150 1443 ft2 N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic (Vented) Main 30 Blown 1443 ft2 0.07 Wood 7/30/2021 1:25 PM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 4 -FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT WALLS Adjacent Cavity Width Height Sheathing Framing Solar Below Space - luP Ft in Ef In Area R-Value-Eraction-Absor_GradeO 1 2 3 4 5 N E S W N Exterior Concrete Block - Int Insul Main Exterior Concrete Block - Int Insul Main Exterior Concrete Block- Int Insul Main Exterior Concrete Block - Int Insul -Main Garage Frame - Wood Main 4.1 20 9 4.1 48 9 4.1 40 9 4.1 34 9 13 34 9 4 186.7 W 4 448.0 ft2 4 873.3 ft2 4 317.3 ft2 4 317.3 ft2 0 0.6 0 0.6 0 0.6 0 0.6 0.19 0.01 0 0 0 0 0 DOORS # Ornt Door Type Space Storms U-Value Width Ft In Height Ft In Area 1 2 N Insulated Main N Insulated Main None None .16 3 .16 2 6 8 6 8 24 ft2 16.7 ft2 WINDOWS r Orientation shown is the entered orientation =>.) changed to Worst Case. v # Wall Ornt ID Frame Panes NFRC U-Factor SHGC Imp Overhang Area Depth Separation Int Shade Screening 1 2 3 4 5 N 1 Vinyl Low-E Double Yes E 2 Vinyl Low-E Double Yes S 3 Vinyl Low-E Double Yes S 3 Vinyl Low-E Double Yes S 3 Metal Low-E Double Yes 0.34 0.23 N 0.34 0.23 N 0.34 0.23 N 0.34 0.23 N 0.55 0.25 N 20.0 ft2 1 ft 0 in 2 ft 0 in 15.0 ft2 1 ft 0 in 2 ft 0 in 20.0 ft2 1 ft 0 in 2 ft 0 in 20.0 ft2 1 ft 0 in 2 ft 0 in 40.0 ft2 1 ft 0 in 1 ft 0 in Drapes/blinds Drapes/blinds Drapes/blinds Drapeslblinds Drapes/blinds None None None None None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation 1 413ft2 413ft2 40ft 9ft 1 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .0004 1515.2 83.13 1,56.06 .1324 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block. Ducts 1 Electric Heat Pump/ None Singl HSPF:9 22.8 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype. Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ None Singl SEER: 16 22.8 kBtu/hr 684 cfm 0.73 1 sys#1 7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 4 • FORM R405-2020 INPUT SUMMARY CHECKLIST REPORT HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.95 50 gal 60 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model # Collector Model # Area Volume FEF None None ft, DUCTS V --- Supply ---- --- Return --- Air CFM 25 CFM25 HVAC # # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 Attic 6 300 ft' Main 20 ft2 Default Leakage Main (Default) (Default) 1 1 TEMPERATURES Programable Thermostat: Y Ceiling Fans: Cooling X] Jan f Feb Mar Xj Apr May Jun j Jul f X] [X Aug [X Sep X Oct X Nov Dec Heating X] Jan jXj XFeb � Mar rX X] Apr ] May �j Jun Jul r] [X� Au[X�SeP f X� Oct f X� Nov i jXXj DecVentin XJan X Feb Mar X Apr May [X Jun [X] Jul [X Aug [X Se [X Oct [X Nov XDec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling (WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating (WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MECHANICAL VENTILATION Type Supply CFM Exhaust CFM Fan Watts HRV Heating System Run Time Cooling System None 0 0 0 0 1 - Electric Heat Pump 0% 1 -Central Unit MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ft, 0 ft 0.3 Main 7/30/2021 1:26 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 4 FORM R405-2020 , ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX` = 94 The lower the EnergyPerformance Index, the more efficient the home. 7704 SEBASTIAN ROAD, Fort Pierce, FL, 34951 1. New construction or existing New (From Plans) 10. Wall Type and Insulation 2. Single family or multiple family Detached a. Concrete Block - Int Insul, Exterior b. Frame - Wood, Adjacent 3. Number of units, if multiple family 1 c. N/A 4. Number of Bedrooms 3 d. N/A 11. Ceiling Type and insulation level 5. Is this a worst case? Yes a. Under Attic (Vented) 6. Conditioned floor area (ftz) 1443 b. NIA 7. Windows- Description Area c. N/A a. U-Factor. Dbl, U=0.34 75.00 ft' 12. Ducts, location & insulation level a. Sup: Attic, Ret: Main, AH: Main SHGC: SHGC=0.23 b. U-Factor. Dbl, U=0.55 40.00 ftz SHGC: SHGC=0.25 13. Cooling systems c. U-Factor. N/A ftz a. Central Unit SHGC: d. U-Factor. N/A ftz 14. Heating systems SHGC: a. Electric Heat Pump Area Weighted Average Overhang Depth: 1.000 ft. Area. Weighted Average SHGC: 0.237 8. Skylights Description Area 15. Hot water systems a. U-Factor(AVG): NIA ftz a. Electric SHGC(AVG): N/A b. Conservation features 9. Floor Types Insulation Area . None a. Slab -On -Grade Edge Insulation R=0.0 1443.00 ft' Credits (Performance method) b. N/A R= ft' c. NIA R= ftz certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a _new EPL Display Card will be completed based on installed Code compli \\ Builder Signature: Date: Address of New Home: City/FL Zip: Insulation Area R=4.1 1325.30 ft2 R=13.0 317.33 ftz R= ftz R= ftz Insulation Area R=30.0 1443.00 ft' R= ftz R= ftz R ft' 6 300 kBtu/hr Efficiency 22.8 'SEER:16.00 kBtu/hr Efficiency 22.8 HSPF:9.00 Cap: 50 gallons EF: 0.95 a�DWE Pstat *Note: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient mortgage (EEM) incentives if you obtain a Florida Energy Rating. For information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1 2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 a AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: 144A RH - FP140030 Builder Name: FOCUS HOMES Street: 7704 SEBASTIAN ROAD Permit Office: City, State, Zip: Fort Pierce, FL, 34951 Permit Number. Y U Owner: FOCUS HOMES Jurisdiction: W Design Location: FL, ST_LUCIE_CO_INTL U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous -air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceilinglattic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceilinglsoffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated; by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side. floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace wall . Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned, space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be airtight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind piping and wiring. Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinki cover plates and walls or ceilin a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 7/30/2021 1:25 PM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1