Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ENVELOPE LEAKAGE TEST REPORT
Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2020 Florida Building Code, Energy Conservation, 7th Edition jurisdiction: 5�-LvV'ar- Cu,.-► 3 FPermit#: UA-- dS 107 Job Information Builder:Synergy Homes Community: Lot: Address: 430 SE Gasparilla Avenue Unit: City: Port St. Lucie State: FL Zip:34983 Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method PRESCRIPTIVE METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch mg, (50 pascals) in Climate Zones 1 and 2, PERFORMANCE or ERI METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on FORM R405-2020 (Performance) or R406-2020 (ERI), section labeled as Infiltration, subsection ACH50. ACH(50) specified on Form R405-2020-Energy Calc (Performance) or R406-2020 (ERI): 7.00 1680 x 60 17850 5.64 Method for calculatingbuil�g volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans ❑✓ PASS Q Code software calculated ❑When ACH(50) is less than 3, mechanical ventilation O Feld measured and calculated installation must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individuals as defined in Section 553,993(5) or (7), Florida Statues, or individuals licensed as set forth in Section 489.105(3)(0, (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the parry conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2.Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3.lnterior doors, if installed at the time of the test, shall be open. 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5.1-leating and cooling systems, if installed at the time of the test, shall be turned off. 6-Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: 15 lightyears, Inc.. Phone: 855-438-1515 I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: 4 Date of Test: 3/11 /22 Printed Name of Tester: Alexander Rivera License/Certification #: ELA7EX Issuing Authority: RESNET Scanned with CamScanner a F- W 0 J O Y a Q a W � (Ao W ac W ov �„ © z W � Q aW W V— ❑ z Q Q o � z H W (A LL- LLJ F- Lu W U cJ') X J w 4t ZZ W N CD No N N ti D 4. A K � w a u }' 4 U OJ U U jol:)odsul ploij SulleN13NS3b Scanned with CamScanner