Loading...
HomeMy WebLinkAbout30 Day Temporary Power releasev opmen r@v.!cw.-.x P101pliv.-AL'b", ­ oil Bi Ing, e 4"tldn Jog Ave A. 194092. 772-4624i'65 Far 772-4-61-i6443 R-eqUeift-fo .50 0y­T-, M Date: Permi ftmber: \V1 (0(, Project Address,: MAR 13 2018 THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE A13OVE DESCRIBED PROPERTY, FOR A. PERIOD NO * T% EXCEEDTHIRTY (30) -PAYS, FOP, THE PURPOSE OFTESTING SYSTEMS AND EQUIPMEW IN PREPARATION FOR A FINAUNSPECMN. 'IN CONSIDERATION OF APPROVAL OF 7HE AEQUEST WE KEREB'r ACINOWL-EbtEmb AGREE As FOLIO'( s: 1. ?his tanpwary power room is -requested for the aWve stated purposeonly, and there vAll bt no occupancy of any type, 9ther than that perMitted by cofi$racoon during this EM6 period. 2. As'wltness by our signatures, we hergby agree tb abide by ail terries arfd conditions of this agreement, including Building DiVigion Policy., which is incorp6rabw hO,eh by reference. 3. ' Ail conditions and rrAMIrements fisted'in the attached downent entitled "Requirements for 30 Day Power for TesUtiqP have' been'fLlfilled'and the premise is ready for-cornpliance inspection. 4. All rlequest� forznedan!siton beyond 30 days -must be,:made in writing W Met Building Wicial -stating the reason'fbr the request Power may'be mmoved-Trom the site an;ffbr a Stop Work order issued if the FlnEWInspkit-6n has not tieen approved Within 30 days. A fee of $100-00 will be reqbIred to Ift the Shop Work Order. WE HEREBY RELEASE AND AGREE TO HOLD HARMLFSS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LLABIUTIES AND CLAIMS -Or- ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN'THE FUTURE OUT OF THIS SACTION, INCLUDING 'ANY DAMArpE WHI(R"MAY OE INCURRED DUE TO THE D3SC6h=ON OF ELEC M-CAL PbVVER IN THE EVENT OF VIOLATION 01= THIS AGREEMENT NNER SIGNATURE -:Av2sXN,<i- DATE DAT.E DATE 089-1 S000A000d m-1 999L8L83LL _W08J 69:3L 8L1_6L_80