Loading...
HomeMy WebLinkAboutTruss DrawingA=LIFE SAFETY WARNING This symbol identifies Life Safety Warnings that should be read given special attention by all persons installing trusses. 5PAGING NOTE ALL TRU55E5 ARE TO BE 5ET AT 2'-0: ON CENTER EXCEPT A5 NOTED MULTIPLE PLY TRUSSES MUST BE ASTENED TOGETHER PER ENGINEERING BEFORE SETTING. REFER TO ENGINEERING DRAWING TO DETERMINE ® IF MULTIPLE PLY. AJj M DON'T LIFT TRUSSES WITH SPANS LONGER THAN 30' BY THE PEAK. 30' Span or less 60 degrees or less f—I/2—► 1 g T Line span approx. REFER TO BCSI Truss must be set this way if crane used. Truss is on example. your truss may not match. nsist crane operator sets truss this way. 30' to 60' Span A Spreader Bar }fag t_Approx 2/3 tom Line 1/2 of Span REFER TO BCSI iss must be set this way if crane used. This is an example, truss may not match. Insist crane operator sets truss this way. All load bearing walls, headers, beams & lintels must be in place at indicated height before trusses Q are installed. AI II HANK=>1_1E=R NOTE UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS. CONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR. U REPRESENTS A BANGER — — — _� — ---- — -Carrying Girder For Truss to Truss Connections see hanger/connector *rNallsbe as de tab; schedule in engineering e nails. package. SEAT PLATES BY CHAMBERS co INDICATES LOAD BEARING WALL REQUIRED BY TRUSSES SUPPLIED BY BUILDER AT A HEIGHT OF 8'-l" ABOVE FINISHED FLOOR 12 4.00 F___ " upset=1/4" heel=315/16" PLUMB CUT END 2 x 4 Top Chord WALL HEIGHT 8'-1" TYPICAL END DETAIL 12 4.00 F__ 12 2.00 8� -1— n Y upset=1/4" heel=315/16" PLUMB CUT END 2 x 4 Top Chord WALL HEIGHT V-1" END DETAIL: A A ARRANGE WITH CRANE OPERATOR IN ADVANCE FOR: A SPREADER BAR OF= 17' . 23' IN LENGTH A Do not stand on trusses until they are braced perBCSI & piroperly nailed to straps &hangers GARAGE LEFT GARAGE RIC�HT FABRICATION AGREEMENT i,aisaFa CANNOT ®H lnARM wrra.7raa Aoip aw+� s The Wilddewiptla+du,. ProPubatlan an tluessa wa M Mered IK - RETURNED Train will be made in sblR twOh alit boa lbaNsole aUalabfardeMmbinrwv.aaes._ __&""'^fillsonm uchm eshmr'a»•InOa ianid�gee: a etd y dye udl eelttsn rtoacs r harithsd txlnllbara Inns aMa In,s a. > Malt od;paab tnnaa7sat u es.-nn w yar au L Drvary It to Job me. it a an blyers'rosponsbl yto not "•• r Y�Y"Mr rwNIR R a101ea b ClWlfp a all/ dwpes en•mads h dimycut. ASaO per ha►fee Nr lerpbna ayy ps dwyd M Chambwa TnWa. . 7: lm-(a ■ PDRCH WE t RDHt to tXwMars,Tnm d rie awn A! a rsuaria6N P>oa• broke Wa M tilde orl dreary aM Pdd MOYn temr d na' o drsey. Imdae spil be made at aclndllled date d deMay r Wyer ewlot Cray d irbrlaated tlwei 7be uldae�nad wosa m pal',Xrombaa,Tpaa re.oru6W hs0.�aaea�tav dPanwdnatamehande.,-,rz%pernnnp7,e a sgldue arhddar seryWtae on r°`1r aMe�Pa geemad to d imm buebt lit, N axnldaraaon d c7lamMra nT= radar dlle atdlt is elr matMd iM ladsRlared Wai •br.•n. n"0�^0feee ate„ mdL. ofelw r Indebaane.a orlea ml laldsltbn00 ealeea b prybliftdrou Including rwUt r+Mnad,or nlatx be made by an 10. Intthe inningd aril fae"ll orl oalran*tg 2" apsemad, an tams 1rNdw hereunderUK pwon wee are a» syle wen gorun ii adon we ,,. onkll tsrpanmarn are Par'N+aaatl StelldadAnd RNLtaanudadoledeanea on Far Cartmdm Uglp Meted Prte Calrlecled WoodTnaaea ISVfPYrIrrCA4-2aaT' •.4 .. UUq Mpla ply trueses must be fliZiinela together per falwhleedng .before they are set; failure to do so can rssultln roof topapge. Temporary and Permanent bracing are required and can am - 'and property and is the risponalbI ft of the Uusa erector. -Study the contents of the Infonnagan packet Included on de8very before "UhM trrl"jee Tkinamernudbeaetand, - Pibg9tbperenttjAy&*in , Trusses Onuat be set pkanb and square DO not fiat bunks or stack Of Plywood, rooting rlra d d of arty other cdrtw tratad loads on bases, tlds can cause cope tu NOT SET TRUSSES USING THIS LAYOUT -;-USE LAYOUT DELIVERED WITH TRUSSES TO SET TRUSSES CHAMBERS TRU66 INC 3106 Oleander Avienue Fort'Plerce; Florida 34982.6423 800-551.5932 - Fort Pleme 772.485-M2 Fax 7724115 8711 Vero Beach M-589-2012 Stuart 712"286-= ' t's_or_Architecf's represeutativaes. .. Shop drawing approval is NOT a ' "double check'• of the contractor. The contractor shall remain responsible for checking field rheaSatements and other construction criteria.. Architect's approval covers general roof shape, review of truss strapping, and loading on structure from gravity and uplift loads and their re/ssAe�ctiivve�locations. Approved By: Date: Braden &Braden A.LA. P.A. 92.0/93.2 MITEK 4.2 DESIGN CRITERIA —_ County SAINT LUCIE Building Department SAINT LUCIE COUNTY Wind Design Criteria ASCE 7-2014 Wind Design Method Main Wind Force Resisting 'o In Roofing Material Shingle or Shake m Loading in PSF Roof R.D.L. Top Chord Live 20 s Top Chord Dead 7 4.2 tvl I Bottom Chord Live 10 Non -Concurrent c — c — Bottom Chord Dead 10 3 TOTAL Load 37 7.2 "• �. I Duration Factor 1.25 2 Wind Speed 165mph 0 Top Chord C.B. Sheeting by builder. c Bottom Chord C.B. Sheeting by builder. v- ~ Highest Mean Height 14'-W Building Type ENCLOSED Building Category II:Non Restrictive Exposure Category C Barrier Island No Conforms to FBC 2014 13 TRUSS DRAWINGS ARE ATTACHED TO LAYOUT Verify DESIGN CRITERIA shown above with the building department and your engineer. Design Criteria is the responsibility of the Chambers Truss Inc. Drawing Name: M11323 Scale: 1 /4 = 1' 72 total trusses, 13 different trusses. MI 4: SAE ACAD: SAE Reviewed By:XIC Jc/y/,f— Date:04/24/12 Revised:10107115 FOR WYNNE BUILDING CORP. DESCRIPTION: 62' GRAND CARLTON III PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE 7VIV5 to M 11323