Loading...
HomeMy WebLinkAboutKSM Soil Compaction reportTir (Y ii 9 - Avg KELLER, SCHLEICHER & MacWILLIAM ENGINEERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377 SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM@KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 DATE TESTED PERMIT # CONTRACTOR JOB LOCATION SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 October 9, 2017 1706-0379 ' Wynne Development 13981 Geranio Court Spanish Lakes Fairways Fort Pierce, Florida ITEM TESTED ' Compacted Foundation Fill KSM JOB # : 173048-1 d/MH/ct TEST LOCATION DEPTH * PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION 1. S. E. 0" - 12" 51 111.0 111.3 99.7 2. S.W. 50 106.2 95.4 3. Center 50 109.5 98.4 4. N.E. 50 105.8 95.1 5. N.W. 50 107.5 96.6 Soil Description: Brown Sand 112.0 I I I I I W In Place Moisture: E I I I I I I I j I I I I 10.2 Percent G I 1 I I I Optimum Moisture: T I I I I I 11.0 Percent I I I I I P I I I I I I Max. Dry Density: 110.0 _l­__ • • — • •I— • — 111.3 P.C.F. C I I I I @ Test Locations The F I I I I I I Density & Penetrometer I I I I I Readings Indicate the 109.0 � ••—••I—•'—'1—•'—'I—"-1•—•�—('—'•— Degree of Compaction Meets D I I I I I I Minimum Required R I I I I I I for S,aMq�FPundation. 108.0 �-- — I_ • . _ I _ _ r _ _ _ _ I , _ .�t�eT,akedn to Natural Grade. 8 9 10 11 12 13 14 Moisture - % of Dry Weight Ii .IlE�el RECEIVED OCT 1: 3 2017 met, all• t\'Zucie County Building Department Erfiajl, b04anishlakes.com Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366