HomeMy WebLinkAbout30 Day Temporary Power releaseRECEIVED
0: -D? %1 � 117'1 e<D $e "b& APR .0 4 7010
.�ui'fiitii�ti;g �� �+C�e� •�'�g����la� Eyeilsi�lie�
61`6hi % ,VIE'° Permitting S.Lucie Co nt� ens
Dam; Pertbk fttuber:
ProjedAddress: \ S- \s'`\\,!C,
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELEMICAL POWER TO THE ABOVE DESCRIBED
OL(�ZUJPM
, FL2FONR7A' I• NPEPRI�IEOPDARNAOTTiC73QN EP4XGREAEDFI'TI► H'cILR,ITNYS(PE0L}TDLQAYI�iS. , IFN4CROTNHSl=ZDPEUt2RAPTOlSQI=N OOIEPTAEPSP'IRiONVGASLY, QSTFE'FMESIE WI= 131' AOIiOI>IGE A1�7 AGi AS FLOWS:
i. 7h15 ielTWM Y power release is feq=tetl l Or the eba*e meted purpm only, and there Wfij be rio
oatupancy of any type, other than that permitted by bolrtion during this time period,
2. Rs witness by our sigrrai�ires, we' hereby agr tb abide by'411 ferins and •conMoris of this agreement,
indUdlh9 Building Division Policy, which is incorpdrated herein by reference.
3. Al! conditions and requirements listed in the attached document entided "Requiremenls'fQr 30 Day
Power for Testing" I7ave'been'fui€illed and the premise is ready for compliande inspection.
4. Ail requesb~ foran. exbension beyond 30 days rnust be;made in writing to the Building' Official •Stating
the reason' fbr the request.' Power may -be removed, froin the siU and/or a Stop Work. -issued •iff
the Fna't'Inspedaon has not b'edn approved wf1in 30 days. A fee of $100.00 will be required to lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE. TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND .CLAIMS -OF ANY TYPE • OF .NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF TH�S.TRANSACUON, iNCLUDDIl d ANYAkAi3t-: "I oi.,:MAY BE INCU-f?.ED DUE !`O THE
DISC kKCTION OF ELECTPYCk POWER IN. THE EVENT OF ifit3I1IT#ON OF.WS AGREEM,93
DATE
988-� MOO/MOOd ML-1 999L8L83LL - -WMA ti9:t L 8 L 1- ti0-ti0