HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-10-22Planning & Development Services
Building & Code Regulation DWision
COUNTYnN Virglnta Ave
• I D n Plerae, FL 34982
77t-462 217Z fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCrION SOIL TREATMENT
PERMIT *:_ao��Co ,— JOB ADDRESS: �ga
BUILDER/CONTRACTOR:
PEST CONTROL CON•TRAI
PEST CONTROL LICENSE
We, the undersigned, hereby certify that we have pretreaW the above desr_ribed Construction for
subterranean termites in armrdance with the standards of the Natiomil Pest Control Assodation.
Square feet 9 area treated: -7
Percentage of solution' .'
Treat yint: Vioju
1" Treatrnent
Re -Treat
Driveway
1st Treatment
Re -Treat
Other
1" Treatrnffit
Re -Treat
Total gallons used. a4
Time of Treatment _ l I QQ--
Slab
—�L1l Treatment
Re -Treat
Pools
1st Treatment
Re -Treat
Perimeter for Final inspection
�Ja;� J1q
Signature of Exterminator Date
Note- There must be a completed form for each required Mirnent or re -treatment and this fonn mast t
site to be pldrad up by the inspector at time of each insperb'on ar the scheduled ln.on will fail and a
fee charged.
FFK104.2.6 CerWcate of Pmteciive Tr�eatmerrt liar prerrilon of termites A w r resins nt jotisrb pas ft boaard
shall be provided to receive duplkate Trwtment Cart katm as each required protewm bmimentls car d,
providing a copy far Me pin ft permit is issued to and another copy for the building pem* till 77>e Treabrrent
Cemkate shall pr Wde the product used, identity of the applkatovr, time and date of the fit; -07a !oration, area
treated, chemical used, percent concenftdon and number ofgallons rmd, to establish a wwffl&hL- rewid of
protective treatment If Me soli chemical trarriermeMo fir termite pmvenVon is used, Mal &ter3ar treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for C% a Permanent Miter to be placed on
the electrical panel box mover, listing all the treatments and datwLof applications.
Revised 7/24/2014