Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT 3-10-22Planning & Development Services Building & Code Regulation DWision COUNTYnN Virglnta Ave • I D n Plerae, FL 34982 77t-462 217Z fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCrION SOIL TREATMENT PERMIT *:_ao��Co ,— JOB ADDRESS: �ga BUILDER/CONTRACTOR: PEST CONTROL CON•TRAI PEST CONTROL LICENSE We, the undersigned, hereby certify that we have pretreaW the above desr_ribed Construction for subterranean termites in armrdance with the standards of the Natiomil Pest Control Assodation. Square feet 9 area treated: -7 Percentage of solution' .' Treat yint: Vioju 1" Treatrnent Re -Treat Driveway 1st Treatment Re -Treat Other 1" Treatrnffit Re -Treat Total gallons used. a4 Time of Treatment _ l I QQ-- Slab —�L1l Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final inspection �Ja;� J1q Signature of Exterminator Date Note- There must be a completed form for each required Mirnent or re -treatment and this fonn mast t site to be pldrad up by the inspector at time of each insperb'on ar the scheduled ln.on will fail and a fee charged. FFK104.2.6 CerWcate of Pmteciive Tr�eatmerrt liar prerrilon of termites A w r resins nt jotisrb pas ft boaard shall be provided to receive duplkate Trwtment Cart katm as each required protewm bmimentls car d, providing a copy far Me pin ft permit is issued to and another copy for the building pem* till 77>e Treabrrent Cemkate shall pr Wde the product used, identity of the applkatovr, time and date of the fit; -07a !oration, area treated, chemical used, percent concenftdon and number ofgallons rmd, to establish a wwffl&hL- rewid of protective treatment If Me soli chemical trarriermeMo fir termite pmvenVon is used, Mal &ter3ar treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for C% a Permanent Miter to be placed on the electrical panel box mover, listing all the treatments and datwLof applications. Revised 7/24/2014