Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
INSPECTION RESULTS- FINAL MECHANICAL
®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: S Permit No. 4RI O O —o O/ D Project: �� 15 Z ) © 0U,b0 Address: n— _2 Check one: ❑ Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: V) )J `-X_ O LG � (14 N t CA �-- Area Inspected/Code: Inspection Results: hAP-Approved ❑ DP -Disapproved Conditions/Comments: 1. 2. 3. 4. S. 6. 7. ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ Not Ready Inspector's Name: „ _TCIW�aon Lic.q: bwl 1 I.6 OFFICES THROUGHOUT FLORIDA ommodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com