Loading...
HomeMy WebLinkAboutINSPECTION RESULTS -TIE DOWN & FASTENERSgUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 31 l tj, Permit No. Project:3� i 13; 2 1 -DCo Lp0 Address: 3�!�D-o - -T �L_�-Ce 1 e Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): a r a'F•V3'ro BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping &Test Masonry Wall/Ceiling Wall Rough -In Ceiling Rough -In Stack Piping & Test Water Piping & Test HW Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping P. Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: `1r- �DDVVt) `- ` �Sre1�C2s Area Inspected/Code: LL Inspection Results:�KJ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. S. 6. 7. Inspec;L= '�'��i1'l Lic.#:yS�l 1 1 6L� OFFICES THROUGHOUT FL(772) St. Lucie, Florida 34986 • (772) 924-3576 • (772) 924-3580 (fax) www,teamgfa.com